Draftsman
FCC ELCTROMECHANICAL (FAST)
Total years of experience :18 years, 0 Months
FCC ELCTROMECHANICAL (FAST)
RYIADH METRO
1-April-2018- TO PRESENT
FAST Consortium is one of three consortia contracted by Riyadh Development Authority to design and build the Riyadh Metro Project. The FAST Consortium of companies is led by Spanish construction group FCC and includes partnersSAMSUNG C&T, ALSTOM, Strukton, Freyssinet Saudi Arabia
Electrical draftsman Responsible for Preparing Shop drawings for electrical Systems in the fowling stations:
Line 5 (lighting): 5A3, 5B1, 5B2, VS2 SHAFT, DEPOT BUILDINGS, Central TBM Tunnel Between 5B1 & 5A3
Line 5 (power): 5A5, 5C1, 5C4, DEPOT BUILDINGS, PSD ROOMS
Line 5 (cable containment): Central TBM Tunnel Between 5A5 & 5A3, Central TBM Tunnel Between 5A6 & 5A1,
Line 6 (lighting):6D2, CUT & COVER TUNNEL 6.1, CUT & COVER TUNNEL 6.3, CUT & COVER
TUNNEL6.4, VIADUCT 6.2, AT GRADE6.1, AT GRADE 6.2
Line 6 (power): 6D2, 6G1
Line 6 (cable containment): CUT & COVER TUNNEL 6.1, VIADUCT 6.1
Composite drawings for 5C4, 5A5 - Technical rooms
SHAKER GROUP
PROJECT: GOVERNMENT AGENCIES COMPOUND IN RIYADH (GAC)
DEC-2015- TO MAR-2018
MEP DRAFTSMAN Responsible for preparing Shop
drawing for mechanical Systems (infra structural)
and make a coordination layouts and sections, Solve clashes and make RFI’s
networks: district cooling, Irrigation, Sewage, water supply, Storm, Combined,
MV, LV, secusiry, cctv
Preparing Shop Drawings for all mechanical Systems and make a
coordination with all Electrical and Mechanical
systems under the supervision of British engineers
district cooling network, Irrigation Network, Water Network, Sewage Network.
, gas line network, Combined utilities
Preparing Shop Drawings for all mechanical Systems and make a
coordination with all Electrical and Mechanical
systems under the supervision of British engineers
district cooling network, Irrigation Network, Water Network, Sewage Network.
, gas line network, Combined utilities
CCC Consolidated Contractors Company-EGYPT
PROJECTS: ST REGIS HOTEL - CAIRO
SEP-2009 TO JUN-2010
Preparing Shop Drawings for HVAC& fire fighting Systems and make a
Coordination with Electrical and Mechanical systems
ORASCOM CONSTRUCTION
09-2006 TO 09-2009
PROJECTS:
1- Carrefour-maadi
2- delta securities company in smart village and other companies
3- Calabar - Nigeria
4- Ammonia - Algeria
5- Oman Embassy
MEP DRAFTSMAN Responsible for Preparing Shop Drawings for mechanical Systems
ENCO
JAN-2005 TO SEP-2006
PROJECTS:
1- City Stars
2- Holiday INN HOTEL
Preparing Shop Drawings for mechanical trades