Sr. Mechanical Engineer
Sinohydro corporation limited
Total years of experience :11 years, 1 Months
• Completed mechanical designs for HVAC, fire protection, and Plumbing Systems while providing and comply the Saudi Aramco code and Standard design teams.
• Assisted drafters in developing HVAC System, Plumbing System, and Firefighting System design of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software.
• Attended project planning meetings to coordinate mechanical
.
• Designed, planned, and directed HVAC, plumbing, and other mechanical systems upgrades.
• Responsible for the execution of all Mechanical Works including building and infrastructure works. In addition to that I had to review the HVAC and Plumbing shop drawings and calculations and to review the submitted materials to be according to BOQ and specifications.
• Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
• HVAC equipment erection, ducting, VRF/VRV pipes installation, internal water supply pipe installation: Copper Piping, UPVC, PPR & piping, and other associated works.
• Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
• Performed pre-construction, quality, and safety management, constructability review, start-up, and commissioning.
• Responsibilities include site execution & MEP works of electro mechanical building services related to HVAC systems.
• Requesting for inspections after ensuring that the work is done per the approved Specifications, Drawings, and Method Statement.
.
• HVAC equipment erection, ducting, VRF/VRV pipes installation, internal water supply pipe installation: Copper Piping, UPVC, PPR & piping, and other associated works.
• Coordination with the engineering department as and when required for design drawings, and construction shop drawings for Chilled water piping, plumbing & drainage services.
• HVAC equipment erection, ducting and chilled water pipes installation works, internal water supply pipework installation: Black Steel Piping, Dx-System Copper piping, VRF copper piping & other associated works
• Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
• HVAC equipment erection, ducting and chilled water pipes installation works, internal water supply pipework installation: Black Steel Piping, Dx System Copper piping, VRF copper piping & other associated works
• Site survey for Fire Dampers and motorized Smoke Fire Dampers (MSFD) of all types A, B, C & D concerning retaining angles, breakaway joints, fire sealant, and fire damper functionality test
• Compiled operational, performance, and safety data on HVAC and support systems.
• HVAC equipment erection, ducting, and chilled water pipes installation, internal water supply pipework installation: Black Steel Piping, Dx-System Copper piping, VRF copper piping & other associated works
• Pressure testing for CHW systems.
I have my bachelor's degree in mechanical & Automation engineering in 2013