Deputy Manager Operations
Colgate Palmolive
Total years of experience :15 years, 0 Months
• Preparation of monthly and daily production plan.
• Preparation of monthly material requirement plan to carryout smooth production operations.
• Coordination with logistic team to ensure the delivery of supplies on time to meet the daily, monthly as well as yearly 100% targets.
• Coordination with logistic team for the timely delivery of the finished product at zonal warehouses to meet the 100% sales targets
• Communication and dealing with 3p contractor (Labor) to carry smooth operations to achieve the organizational goals.
• Negotiation with 3p contractor for the installation of projects and delicate responsibilities of the team members to supervise the projects.
• Participate in budget preparation of the plant site.
• Manage a team of Assistant Managers, Engineers and Shift In-charges in achieving daily production goals.
• Coordinate with General Manager in resolving plant issues in timely.
• Provide training and guidance to Engineers and Shift In-charges to meet performance standards.
• Determine resource requirements, work allocation and production deadlines to achieve production objectives.
• Implementation of 5S system in operations as well as in maintenance department
• Measurement of plant KPI’s to ensure that plant operation are conducted smoothly
• Measurement of asset utilization and Overall equipment effectiveness
• Each year set the target to increase productivity of the plant by 10%
• Recommendations for capacity addition to meet planned target as well as for the market demand
• Maintain proper documentation for all plant related activities.
• Ensure materials, supplies and equipment is readily and continuously available for team to carry out production process.
• Implement continuous plant improvements to enhance productivity and scrap reduction by 15%.
• Implement cost reduction initiatives to minimize plant expenses.
• Optimize plant operations to meet quality and production standards.
• Maintain housekeeping of the plant area for safely and smoothly carry out plant operations.
• Set overall plant policies and procedures to ensure effective operations.
• Schedule preventive maintenance of plant equipment as well as breakdown maintenance to minimize the downtime.
Preparation of monthly and daily production plan.
Preparation of monthly material requirement plan to carryout smooth production operations.
Manage a team of Engineers and Shift In-charges in achieving daily production goals.
Coordinate with Plant Manager in resolving plant issues in timely.
Provide training and guidance to Engineers and Shift In-charges to meet performance standards.
Determine resource requirements, work allocation and production deadlines to achieve production objectives.
Measurement of plant KPI’s to ensure that plant operation are conducted smoothly
Measurement of asset utilization and Overall equipment effectiveness
Each year set the target to increase productivity of the plant by 10%
Recommendations for capacity addition to meet planned target as well as for the market demand
Maintain proper documentation for all plant related activities.
Ensure materials, supplies and equipment is readily and continuously available for team to carry out production process.
Implement continuous plant improvements to enhance productivity and scrap reduction by 15%.
Implement cost reduction initiatives to minimize plant expenses.
Optimize plant operations to meet quality and production standards.
References And Other Information Are Available As Required
Maintain housekeeping of the plant area for safely and smoothly carry out plant operations.
Set overall plant policies and procedures to ensure effective operations.
Schedule preventive maintenance of plant equipment as well as breakdown maintenance to minimize the downtime.
• Meeting the Production targets
• Devise the manufacturing strategy
• Maintain the quality of the product according to the customer requirement
• Coordination with planning department
• Waste management
• Daily production report
• Coordination with maintenance department in devising the preventive and predictive plan
• preparation of production plan
• Monitoring of the implementation of the production Plan
• Calculation of the machine efficiency
• Calculation of the machine capacity
• Bill of Materials
• Job Cards
• Illustrated BO-Ms
• Part Drawings
• Assembly Instructions
• Template Boards
• Time and Motion Study
• Order Tracking
• Productivity measurement and improvement
• Information System Design
• KPI Metric Establishment
• Scheduling via Gantt Charts and Standard Times
Executive Master in business administration. Completed my degree with good grades
B.Sc industrial engineering is basically related to process improvement job in manufacturing as well as service industry