Commissioning Manager
Galfar Al Misnad
Total years of experience :7 years, 1 Months
Handling FIFA 2022 Al Bayt stadium project as the Testing and Commissioning Manager
•Performed as a Commissioning Lead - MEP for FIFA 2022 Al Bayt and Khalifa District Cooling Plants
•Acted as an MEP coordinator for Aspire Zone, New Head Quarters building
•Facilitated MEP and Commissioning activities in the project
•Drove Project start-to-end, monitoring and controlling the whole project timeline
•Managed and led project subcontractors throughout the duration of the project
•Coached, mentored, and lead personnel within a technical environment
•Executed C-Suite reporting on the current program, prospects, and client issues
Manage and lead MEP subcontractors throughout duration of the project (from ground breaking through commissioning and turnover to owner)
•Liaise with Authorities (Ashghal and Kahramaa) for Potable Water and TSE water connection. Also, including Storm Water and Sewage Water connection.
•Assist Scheduling department with developing detailed schedules for all MEP installation activities, including cost and resource loading.
•Review and approve material/equipment for MEP systems prior to installation.
•Monitor the installation and start-up of MEP systems and commissioning of project with Engineer and Owner
•Coordinate activities, materials procurement and other related activities with Project Manager
Projects
Drove test planning, estimation, project schedules and reporting with the onsite/client team
•Lead a team of 10 Test Engineer
•Engineered and executed High Level and Functional Test Cases and Requirement Traceability Matrix
•Performed test case review, manual test case, analysis and reporting on defects
•Mediated test execution status between US Product Planning Engineers and Developers
•Perform tests on TU Application to determine modes of failure, Application compatibility with our products and third party, and possible problems occurring in other parts of a process