Maintenance Manager
Beshay Steel
Total years of experience :17 years, 10 Months
• Ensure compliance with Occupational Health and Safety guidelines, fostering a culture of safety across the organization
• Implemented an Energy Management System resulting in significant energy savings.
• Achieve the vision, strategic objectives and budgeted annual operation plans.
• Define and measure KPIs to track and improve overall efficiency.
• Streamlined the planning section by analyzing processes, optimizing staff performance, and addressing deficiencies.
• Implement effective corrective, preventive, and countermeasure actions to prevent recurrence of issues.
• Leverage modern technology to improve product quality, enhance asset performance, and reduce costs.
• Monitor expenses to control energy consumption, maintenance, and spare parts.
• Improve housekeeping through implementation of the 5S methodology.
• Conduct workforce training and education to develop a capable and promising staff.
• Prepared digital forms and ensured their successful implementation.
• Oversaw maintenance logs and frequent activity reports.
• Develop and execute annual missions, goals and strategic objectives.
• Plan and coordinate annual shutdown activities.
• Recruit and mentor highly skilled staff members.
• Provide supervision, and guidance to ensure adherence to correct operating practices.
• Monitor spare parts consumption and efficiently managed requisitions.
• Offer technical assistance for shift engineers for troubleshooting.
• Implement corrective, preventive, and predictive actions to optimize maintenance processes.
• Ensure adherence to ISO standards and prepared for internal and external audits.
Responsible for all non-productive, off-line electrical equipment and rolling mills DC motor.
I. PM (Periodical Maintenance) & Repairing Work:
• Plan and executed periodical maintenance and repair work for D.C. motors.
• Receive, execute and monitor repair and manufacturing requests.
• Conduct overhauling of A.C and D.C motors.
• Implement efficient spare parts control mechanisms.
II. Over Head Cranes:
Installation, commissioning, troubleshooting, and performed PM
III. Substation:
Maintenance and operation 11 KV switchgears in the substation.
Scope of work:
Representative of A&E department manager on the shift level
Graduation Project : Power System Graduation Project - Electrical Design of Maamora Plaza. Electrical Machine Graduation Project - Starting single phase I.M by using power electronic circuit. Graduation Project Grade is Excellent
URL removed due to policy violation. Please contact support for further information.