René أكرمان, Supervisor

René أكرمان

Supervisor

ITP

البلد
فرنسا
الخبرات
29 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :29 years, 9 أشهر

Supervisor في ITP
  • الإمارات العربية المتحدة
  • مارس 2010 إلى ديسمبر 2010

Erection and supervision on site:
Structural prefab, Erection Structural, piping and pressure vessels:
Storage reservoirs: Cryogenic. Erection furnace: Reheating and annealing
Coordination QA-QC: Radiograph interpretation
Coordination with engineering: Piping Material Classes: Material list
Welding procedure specification (WPS) for piping (carbon steel)
With procedure qualification record (PQR) Quality control procedure for weld control-
piping’s.QCP for pressure testing of piping:

Manager
  • مارس 2008 إلى سبتمبر 2009

TFSI-VEOLIA-OTV-SA-
Sludge Treatment and incineration system: Saint Petersburg’s-Russia: have repairs try
boiler, for connections, have design pressure 33bars service, and design temperature 455°C.
The situation with steam leakage, and furnace 1-2-3 have not using qualified certified
welders, welding procedure, or constant control by subcontractor. (Russia procedure
GOST16037-80) Welder’s qualification is not accept by laboratory and Russia, passport
and welders, is not approved. Control by x-ray film 20 welds: for welding is no approve by
laboratory. OTV have checking 15 companies for testing welder. X-ray film 100°/°, modified
supports and stress. Testing piping. Insulation piping. To put in conformity the direction of
the diaphragm. To control piping’s connection of the turbine, in welding, then the support
of connection on the turbine, parallelism. To re-examine the installation and the self-
supporting quality of the air service. To re-examine the installation of the heating vapour
for the factory, to be checking air ventilation. Repairs the superheated SH1+SH2, the
evaporator EV1, the economizer, the evaporator EV2.
Meetings-Planning. Progress.

Supervisor في Mars
  • الإمارات العربية المتحدة
  • يناير 2007 إلى يناير 2008

Entrepose: Project Kotc -LPG Mounded Storage Tanks
Welding Procedures-Quality control Inspection for pressure testing of on-plot piping
Welders Qualification-CS Welders Qualification Records-RTR Jointers Qualification
Records.

Site Manager في Exxon
  • المملكة العربية السعودية
  • سبتمبر 2002 إلى فبراير 2003

Pressure Reducing Station Kribi-Cameroon
(Thad Cameroon Pipeline
Supervision of works on site
Planning-Progress-Meetings
Responsible for detection of difficulties
Diagnosis of problems
Making conform to the schematic to be checked on site
Management of personnel National and Expatriates (60workers)
Construction Life Camp: civil, hot and cold water, domestic central heating, sanitary plumbing-
Fire protection service-Air-Flow

Supervisor
  • يونيو 2003 إلى يناير 2003

Planning-Progress-Meeting
Checking on site by PIDQA/QC-Documents final.

Supervisor في DOMO CAPRULONA
  • مارس 2002 إلى يوليو 2002

Progress schedule
Control quality
Radiography interpretation
QA-QC documentation-final document
Metings

QA في TOTAL FINA ELF MIDER
  • يونيو 2001 إلى أكتوبر 2001

PROJECT SHUTDOWN REVAMPING
Super-Intend ant
Plannigs-meetings :
70 piping prefabrication before in shutdown
Erection priority lines (fractionation-reaction)
List of lines to be dismantled (fractionation-reaction)
Control quality (piping prefabrication)
Radiography interpretation
Specification painting specification insulation
Equipment static scope of work e-engineering documentation

PROJECT في STRABAG
  • الإمارات العربية المتحدة
  • نوفمبر 2000 إلى أبريل 2001

-AQP

Supervisor
  • يناير 1999 إلى يناير 2000

PLANT
ELF-ATOCHEN

Supervisor
  • يناير 1998 إلى يناير 1999

FURNACE CALVANISATION-GERMANY (156Brenner)
SELAS :

SUPERVISOR في DOMO CAPREULONA CHEMICALS
  • يناير 1997 إلى يناير 1998

To control works quality contracted to RAYTHEON-LITWIN
Engineering and construction activities.
Participation to construction meetings.
Punch listing of all non conformances
Some listing and verification of corrective measures

في IPEDEX
  • يناير 1996 إلى يناير 1997

THAINOX-

WORKS MANAGER في ALUMINIUM PROJECT EGYPT-CLECIM
  • يناير 1994 إلى يناير 1996

Units, hot mill, cold mill, reheating furnace, annealing furnace
Piping preparation after prefabrication, Hydraulic pipe work-Test pressure
Pickling and neutralisation by bath-piping preparation before commissioning
Pickling and neutralisation by circulation, checking of passivation (rinsing)
Modification of piping after treatment

SITE MANAGER في ELEM PROJECT NIGERIA-SPIE BATIGNOLLES
  • يناير 1992 إلى يناير 1994

Qualification of welder: for Piping, Cooper, Cast Iron, and Galvanised Steel
Construction:life-Camps-Electrical-local-Technique-Canteen-Home-Leave-Rain-Water
Sanitary, Plumbing-hot-cold and drainage-Pipe-Underground-Air Flow in Ducts-Central
Heating-Sprinkler, Installations-Connection-pumps-Pipe-gas-service-Fire-protection-
Services- Planning, meeting.

WORKS SUPERVISOR في ALUMINIUM
  • يناير 1990 إلى يناير 1992

Responsible for boiler work, welding, handling transporters
Erection thanks-storage for coke and aluminium
Quality control, control-x-ray films-dye penetrand-ultrasonic-ressuage-non destructive
Testing, planning, meetings, documents contactor

CONSTRUCTION MANAGER في PROJECT HBJ PIPELINE IN INDIA-SPIE CAPAG R-C-M
  • يناير 1987 إلى يناير 1992

charge: all disciplines, civil work, piping mechanical, electrical,
Instrumentation-Supervision and coordination with sub-contractor
Work progress follow-up, Planning-Meetings

Site co-ordinator
  • يناير 1985 إلى يناير 1986

Construction of a 2500 m3 tank with floating roof, two 16000 m3 tanks
With fixed roof and pipe connections, Planning-progress-Meeting-QA/QC

Site Manager في ELF
  • مصر
  • يناير 1983 إلى يناير 1984

Responsible for platforms and south and north satellites, new works
Detection of difficulties, diagnosis problems, repair and maintenance of
Mechanical equipment, pipe network, electrical equipment, gas
Compressor installation, all trades in liaison with engineers in all Services concerned
Planning-Meetings-Progress- QA/QC

work supervisor في ZUBAIR IRAQ-TECHNIP
  • يناير 1982 إلى يناير 1983

Responsible for detection of difficulties, diagnosis of problems, making
Conform to the schematic to be checked on site, and discussing
Problems detected with the design office: Planning-Progress-Meetings- QA/QC

Supervisor في SAFI MAROCCO PHOSPHATE PLANT-HEURTEY INDUSTRIES
  • يناير 1981 إلى يناير 1982

Start up, responsible for detection of difficulties, diagnosis of problems
Repair and maintenance of mechanical equipment, pipe network, water
Treatment equipment and instrumentation: Planning-Progress-Meetings- QA/QC

QA في Manpower
  • الإمارات العربية المتحدة
  • يناير 1979 إلى يناير 1980

FOSTER WHEELER
Construction Life-Camp-Canteen for

Works supervisor في NORTH SEA PLATFORM-CIB ELF
  • يناير 1974 إلى يناير 1976

Drilling derrick installation, installation of modules 1, 2 and 3 and various works
Start up system for technical problems, installation of three 750 m3/h
Vacuum degassers-Planning-Progress-Meetings- QA/QC

Works supervisor
  • يناير 1970 إلى يناير 1974

Pipeline installation-Welding book, storage at thermal power station
Marcoule CEA (atomic energy commission)
Coating of stainless steel cells, Radiation protection on floor and Walls
Dubai UAE-Land and sea works co-ordination manager (pipe work, equipment and personnel)
1966-1970 FOS SUR MER STEELWORKS-BOCCARD
Site manager
Installation of rolling mill, installation of hydraulic, pipe work for hydraulic control
FOS end Meer oils refinery
Installation water processing complex, Lurgi process, system and start up for technical
Problems
1965-1966 Feyzin oil refinery
Team leader
Responsible for prefabrication workshops, inspection with general layout drawing,
Works progress
Rodia Seita petrochemicals complex
Responsible for erection, pipe work, installation of pumps works progress
Aramont station Installation of a pharmaceutical plant, pumping installation, starts up system for
technical.
General for constructions
Hot Rolling Mills: Fly Wheel Assembly: Pulley Wheel Assembly: Reduction Gear Box: Pinion
Stand: Speed increaser: Steel Rolling Mill Stand: Gear Couplings: Hot Saw Machine:
Straightening Machine: Shearing Machine: Roller Conveyor: Forged Rolls: Automatic cooling Bed:
Speed Reducer: Sprockets:
Col Rolling Mills: Reduction Gear Box: Pinion Stand: Steel Rolling Mill Stand: Gear Couplings:
Shearing Machines: Forged Rolls:
Process & Miscellaneous: Furnace Casing: Lopper Cars: Double Roll Crusher: Coil Car Floor
Mounted: Rotary Coal Breaker: Kick off Device.
Piping: Circuits to be treated: Piping Preparation: Before usage: After Prefabrication: Preparation
on site: Piping pressure tests: Pickling and neutralisation by bath: Pickling and neutralisation by
Circulation: Rinsing: Control: Piping modification after treatment: Safety.
Work instructions-Specification-Drawings-Quality Plans: Master Samples.

Coordinator في Power Plan SNC LAVALIN Algeria SKIKDA
  • مايو 2005 إلى

meeting, progress: equipments on site, structure,
Piping’s- procedure-WPS-P-11-P-22 P-91, to carbon steel, management for crane, 60t-350t.
Pre-commissioning, install priority lines. Meeting for control all materials is no missing.

  • يناير 2001 إلى

water dosage and compressed air-4 inadequate system selection-5 generation of layers in the
concrete-6generation of “nests «in the anchor and edge zones-7neglected final treatment.
method statement erection WAULTS. Measuring the vault. Steel construction checks
Bracket position.Install burner, connection and pipes.
meetings-progress.

Supervisor
  • يناير 1986 إلى

Construction of 6 furnaces-2 reheating-1 homogenization furnaces-3 annealing
furnaces, Works: Hydraulic, greasing, reining, gas, nitrogen, water, mechanical
Quality control-Progress-Planning-Meetings

work supervisor في Sidem
  • الإمارات العربية المتحدة
  • يناير 1974 إلى

Installation of vertical pumps and associated elements, pipe work
Construction of a storage tank plant,

Supervisor
  • إلى

Morocco-Safi
Project: Revamping Unity: Planning-Progress on Site-QA/QC
Meeting: Making conform to schematic to be checked on site

Project في General Electric International
  • الإمارات العربية المتحدة
  • إلى

Erection Turbine: Supervisor Tank and Piping
Construction life camp: Green Zone and South Baghdad-Planning-Progress-Meeting
Coordination with project and corrective action
Drafting of inspection reports Radiograph interpretation-QA/QC

Specialties & Skills

DIAGNOSIS
MATERIALS MANAGEMENT
MECHANICAL
MEETING FACILITATION
MICROSOFT WORKS
OIL PAINTING
PERSONNEL
PLUMBING
PROGRESS

اللغات

الانجليزية
متمرّس
الفرنسية
متمرّس
الالمانية
متمرّس