Sr. Planning Engineer
KEO International Consultants - Qatar
Total years of experience :26 years, 0 Months
- Supervising project planning and control of Local Roads and Drainage projects.
- Manages the Project Master Program and report the progress to the Client and Management
- Achieved Client’s approval for the assessment of Contractor's EOT Claim twice.
- Collaborates with a group of eight (8) Sr. Planning Engineers with other projects in the development of Monthly Reports to the client.
- Develops the Project Risk Register and report on the Risk to respective Stakeholders
- Managed four (4) Internal Highway Projects for Planning and control.
- Supported the Supervision Consultants' Planning Engineers with regards to Planning and Control requirements of PWA
- Administered the Project Master Program and reported the progress to the Client and Management
- Supervised nine (9) Flood Prevention Scheme simultaneously
- Drainage projects Planning and Control simultaneously with five (5) Contractors.
- Generated the submissions of Weekly Progress Reports of nine (9) FPS projects for the client
- Drafted eight (8) Contractor’s Extension of Time Recommendation to the client.
- Achieved completion of FPS Scheme to the client. Expedited client approval of Qatar Parking Master Plan Baseline
- Performed both retrospective and prospective types of analysis.
- Drafted and delivered construction delay analysis reports for clients, from determining cause and effect to report writing substantiated by supporting documents and preparing delay analysis reports.
- Performed critical path analysis of schedules while determining the presence of concurrent delay & consequent disruption.
- Analyzed production rates and work cycles to demonstrate entitlement to EoT, drafting of claim, and negotiation strategy.
- Review and critique Construction Programs and updates.
- Supported the Design Development, Tender of the Sharq Crossing Program (3-Bridges and Tunnel)
- Obtained approval of Level 3 Baseline Program in Primavera P6 from Concept Design, Procurement, Construction, and Maintenance.
- Lead a team of three (3) planners in the development of the Level-3 Baseline Program
- Generated performance reports and dashboards
- Developed delay analysis using Primavera P6 and determined the time impact for each delay event for an infrastructure project in Lusail
- Coordinated construction activities with all relevant parties for the airport project and implemented them in the Baseline.
- Aided the Planning and Controls Department in developing the Baseline Program in Primavera P3.
- Developed of Extension of Time submission.
- Guided a team of three (3) junior Engineers in the development of cases for Extension of Time
- Produced a Baseline program in Primavera P3 for the construction of a 20-story building.
- Documented Daily Progress Report for clients' information
- Monitored the progress of Works for client's information using Primavera P3
- Implemented, delegated, and scheduled estimating works for project completion.
- Conducted coordination meetings, as required by the project.
- Prepared and encoded necessary estimating requirements, documents, et al. necessary for the completion of the project.
- Coordinated and corresponds with the client and supervisors.
- Conducted accuracy and quality control, monitored work progress, and evaluated it upon completion.
- Implemented and developed operational procedures to facilitate and enhance work.
- Streamlined the Estimating Spreadsheet in preparation for submission of Bids.
- Estimated Cost and Quantity for preparing Bill of Quantity for a Bid.
- Supervised a team of four (4) Estimators in bid preparation.
- Administered variance program and assisted in the change management effort in a timely fashion
- Generated a construction baseline schedule in Primavera P3 for a renovation of the existing mall.
- Recorded Construction progress and documented it in the baseline update
- Generated a construction baseline schedule in Primavera P3 for a renovation of the existing mall.
- Recorded Construction progress and documented it in the baseline update
- Reporting to the VP in Engineering, providing assistants in all the dealings with suppliers, clients, and the Management
- Analyzed project scope documents to create accurate project cost estimates.
- Facilitated the review and assessment of Subcontractors' Payments.
- Adopted the company's policy on Office Engineering
Dean's Lister - 4 semesters