رودريك Arillas, Field Piping Engineer

رودريك Arillas

Field Piping Engineer

Bechtel

البلد
الفلبين
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
18 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 5 أشهر

Field Piping Engineer في Bechtel
  • استراليا
  • سبتمبر 2014 إلى مارس 2018

Wheatstone LNG Project-Onslow, Western Australia, Australia
• Coordinate and communicate with the module yard in Tanggu, China to oversee module forecast delivery dates, discuss technical information, safety issues, material ship loose items and carry over works.
• Module joint inspection with Australian quarantine inspection service (AQUIS) on carrier heavy transport vessel when arrived in Australia
• Send visual inspection invites to all parties involve client, contractor and SMP subcontractor to do a receipt and detailed walk down to verify and validated carry over works, non-conformance, pipe preservation using Cortec, survey target points prior to module fit up and final alignment.
• Coordinate between design and stick-built spools production team concerning design information and issues to ensure our end product meets high level of quality.
• Receive award recognition for resolving issues with stick-built spools priorities and delivery schedule dates with first KPI’s which is Inlet pipeline downstream connection offshore pipeline.
• Receive award recognition for resolving issues with module piping shoe sliding plate.
• Receive award recognition from client for a planned and executed with 6 field piping engineers to lead flare punch walkdown leading to a minimal punch list and released for pneumatic testing and blowing successful without any leakage.
• Raised FMR’s to ensure adequate consumables to support KPI construction schedules
• Generate and raised RFI/FCD/NCR and back charge notice.
• Responsible for visual receiving inspection of piping and equipment
• Understand, review and approved piping hydrotest packs, blow packs, piping work packs
• Witness piping hydro/pneumatic, blowing activities and enforce strict adherence to safety guidelines
• Assign to Borescope inspection team to review videos photos of pipe cleanliness category 1, Cortec condition and make necessary judgement to hydrolase blasting, mechanical cleaning and manual Cleaning.
• Reviewed and approved Piping Work Packages (WP) documents
• Participate and responsible on Construction Sub-System walkdown and Mechanical Completion (MC) Sub-System walkdown. Raised, Verified and Closing of Punchlist items of Mechanical Completion (MC) Sub-System walkdown prior to commissioning

Piping Site Construction Supervisor (PMC) في Bechtel
  • الإمارات العربية المتحدة - أبو ظبي
  • أكتوبر 2011 إلى سبتمبر 2014

Borouge 3 Project-Al Ruwais, United Arab Emirates
• Construction Supervisor-Piping as part of Project Management Team role, responsible for monitor and oversee EPC Contractor piping and pipeline construction, quality and safety activities in compliance with Company Project Contract and Specification.
• Piping and Pipeline Construction progress monitoring, 3 weeks look ahead and day to day activities for piping on all phases of work performed by EPC Contractor areas.
• Submit daily/weekly piping stick built and production reports to construction manager for the Company Management Meeting
• Responsible for final Company review, comments and approval of EPC Contractor’s and Sub Contractor Method Statement (MS) and Field Material Requisition (FMR)
• Monitor surveillance and inspection on site construction activities to ensure that discipline related activities, including material and equipment receipt, storage and installations are accomplished in full compliance with the CLIENT HSE procedures, Method Statement, applicable specifications and standards
• Understand, review and approved piping hydrotest packs, blow packs, piping work packs
• Monitor TIE-IN activities connection to GASCO and Takreer
• Participate and responsible on Construction Sub-System walkdown and Mechanical Completion (MC) Sub-System walkdown. Raised, Verified and Closing of Punchlist items of Mechanical Completion (MC) Sub-System walkdown prior to commissioning

QC-Mechanical/Piping/Tank Inspector في GS Engineering & Construction
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2010 إلى سبتمبر 2011

Green Diesel Project-Ruwais Refinery -Al Ruwais, United Arab Emirates
• Responsible for quality inspections on piping, mechanical equipment Static and rotating
• Responsible for quality inspections on all storage tank floating and cone roof
• Review, Surveillance, Hold and Witness all inspection activities as per ITP in piping, mechanical and tank
• Interfaces with engineering, construction and vendors regarding quality issues
• Initiate and provide SOM (Site observation memo) & NCR (Non-conformance report) to subcontractor to verify and record the implementation and effectiveness of corrective/proposed action taken
• Mechanical alignment inspection
• Witness, review and approved piping hydrotest packs, blow packs
• Witness, review and approved storage tank floating and cone roof hydrotest package
• Assistance on final QC Dossier documentation during final handover

Field Piping Engineer في Bechtel
  • الإمارات العربية المتحدة - أبو ظبي
  • أكتوبر 2008 إلى أكتوبر 2009

OGDIII Onshore Gas Plant Project - Habshan, United Arab Emirates
• Field Piping Engineer and at the same time QC Piping Inspector on OGDIII. Responsible for process piping on train 1 and 2 Gas Dehydration / NGL Unit
• Responsible on all pipe and pipe support regarding substitutions, technical and site issues, solving technical queries from contractor, making Work Order (WO) for Direct-hire work, and back charging subcontractor
• Answers contractor request for information (RFI), technical direction on subcontractor supervisor and craft, made substitution on shortage material on pipe, fittings, flanges, pipe support to mitigate schedule, raised field material requisition (FMR), approved material warehouse request (MWR) for piping and pipe support
• Production of as-built drawings on piping, P&ID and pipe support revision thru Field Change Notice (FCN)
• Creating hydrotest packages for direct-hire works
• Calculation of stored energy on FL & FLC line for pneumatic testing, test blank on compressor and pipe thickness
• Responsible for all quality inspections on piping as per ITP
• Punch listing for Pre/Posttest walkdowns to verify outstanding items
• Witnessing and acceptance of pressure testing, Flush-Air blowing, Bolt torqueing and tensioning
• Mechanical Completion (MC) Sub-System walkdowns with Client operation team, PMC, TPI inspector and contractor commissioning team prior to ready for commissioning and start-up
• Ensuring system completion dates and project milestones are met as per schedule,
• Use Bechtel Standard Application Programs (BSAP's) like Bechtel Procurement system (BPS), Info works, Teamwork’s and Smart plant review (SPR)

Field Piping Engineer في Bechtel
  • المملكة العربية السعودية - الشرقية
  • فبراير 2007 إلى أغسطس 2008

Khursaniyah Gas Plant Project - Eastern Province, Kingdom of Saudi Arabia
• Field Piping Engineer on Khursaniyah Gas Project. Responsible for piping on train 1 and 2 LPDGA Unit.
• Solving contractor’s technical queries, rerouting/redesigning lines and supports in field
• Issuing of day work orders/site instructions and liaising with Lead Piping Field Engineer and Superintendent on all engineering matters
• Production of as-built drawings on piping, P&ID and support revision thru Field Change Notice (FCN)
• Assists field material procurement in inspection and receipt of piping materials, review and approved material requisitions of field warehouse requisition. Coordinate and interfacing with other discipline
• Approve material substitution on pipe, fittings and flanges to mitigates shortages
• Check that all project documents that are maintained in the site and pipe shop are the latest revision before commencement of work
• Continuously check and review the changes status during the work
• Familiar with Saudi Aramco Standard, Procedure and Material system specification. SAES, SAEP&SAMSS
• Use Bechtel Standard Application Programs (BSAP's) like Bechtel Procurement system (BPS), Info works, Teamwork’s and Smart plant review (SPR)
• Knowledge and understand Bechtel's Standard Work procedure processes (SWPP) like U/G, A/G pipe, pipe supports, pipe system cleanliness, pressure testing of pipe, insulation

Piping Engineer في Daewoo Engineering & Construction Co.Ltd.
  • روسيا
  • يونيو 2005 إلى ديسمبر 2006

Sakhalin II- LNG/OET Plant Project- Sakhalin Island, Russia
• Piping Engineer on Sakhalin II - LNG/OET Plant Project. Responsible for Pipe Fabrication on process train 1 & 2
• Monitor and supervise the inspector’s quality activities to ensure compliance to the relevant inspection and test plan. Check that all project documents that are maintained in the pipe shop are the latest revision before commencement
• Coordinate inspection activities discuss and resolve where possible problems relating to quality with company
• Prepares inspection and testing report for air soap test of reinforcing pad and hydrotest for first spool of the equipment. Assign qualified welder in fabrication shop area based on Welder Procedure Specification (WPS), ASME IX and B31.3
• Check Daily production report for welding, RT, PT, MT & PWHT
• Site experience of working with Welders and Construction Crews in the field and pre-fabrication yard
• Measure and report production welding work in progress on a regular day to day basis

Piping Engineer في Hyundai Engineering & Construction Co.Ltd.
  • إيران
  • نوفمبر 2003 إلى يناير 2005

South Pars Field Development Phase 4 & 5 Onshore Gas Facilities- Assaluyeh, Busher, Islamic Republic of Iran
• Piping Engineer on South Pars Phase 4 & 5 Project. Responsible for Supervision for clearing punch list item prior to pressure testing and reinstatement for final client acceptance.
• Issuing of day work orders/site instructions and liaising with Area Piping Manager on all test packages and progress matters. Carrying out visual weld inspections, punch listing of complete systems prior to release of testing, witnessing and approving pressure tests, flushing ensuring applicable standards and specifications are adhered to during construction activities. Issuing daily/weekly of welding report, hydrotest packages reports to QA Manager
• Measure welding work, painting works & Insulation work in progress at site and do the reporting on a regular day to day basis
• Pre and Posttest walkdowns to verify outstanding items
• Understand, review and approved piping hydrotest packs, blow packs, piping work packs

Mechanical Piping Engineer في Hitachi Power
  • اليابان
  • يناير 1999 إلى نوفمبر 2003

Oil, Gas and Power Project- Ibaraki, Japan/ Makati, Philippines
• Piping Mechanical Engineer on Thermal Power Plant. Responsible for production of isometric drawings from general arrangement drawing (GA). Producing As-Built drawings of isometric, P&ID, pipe support, GA’s and equipment drawing.
• Interference checks and design review of all piping and equipment drawings to ensure quality, adherence to specification, resolving technical queries. Directly involve for 5 no. of piping engineer ensuring weekly progress and schedules are met.
• Prepares project planning, detail schedule, workloads, manhours and team performance to Project Manager
• Train cadet piping engineer on how to make isometric drawing from piping general arrangement drawing
• Attend project orientation, site inspection on production of steam/gas turbine and generator plant.
• Site visit of Hitachi fabrication plant for thermal power plant projects
• Technical meeting with Japanese engineer for project work schedule for preparing detailed piping fabrication and isometric drawing on main steam and high-pressure piping.
• Understand & review Piping Layouts, Isometric, Hydrotest packs, Piping MTO's (Valves, Pipes, Fittings and Flanges) and Technical Reports

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Technological Institute of the Philippines
  • يناير 1997

.

Specialties & Skills

CUSTOMER RELATIONS
CLOSING
DELIVERY
DOWNSTREAM
MECHANICAL
MICROSOFT WORKS
PROGRESS
PROJECT MANAGEMENT
QUALITY
RECEIVING

اللغات

اليابانية
متمرّس