Work Experience

Total years of experience :7 years, 7 Months

Planning Engineer/Project Control at Fortune Enterprises
  • India - Bengaluru
  • June 2015 to January 2016

• Control the mechanical and civil maintenance work like MEP, Aluminum works, manpower supply & Machineries supply like Crane, Forklift & Hydra for mechanical projects and shutdown works.
• Site visit and preparing quotation for required new job.
• Make sure the require place or radius for equipments and machineries to lift the material.
• Preparing the agreement for approved job from client.
• Preparing the planning & schedule as per final date mentioned by the client.
• Preparing the safe lifting plan and placing the crane for lifting the materials to required height.
• Deploying the manpower and material as per schedule.
• Preparing the billing and submitting to the client.
• Follow up the payment.

Project Control/Planning Engineer at Onshore Construction Co.Pvt.Ltd
  • India - Mumbai
  • October 2011 to May 2015

 Worked in African mechanical & superlift limited, smelter and concentrator projects Konkola Copper Mines (KCM) Zambia (West Africa) for 10 Months as a Planning Engineer.
 Worked in PT.Linde Indonesia 2000 TPD, Air separation unit Indonesia for 1 year and 11 months as a Planning Engineer.
 Worked in Evyap Sabun Malaysia SDN BHD, Oleo chemical & personal care plant & Shin Eversendai engineering, Sdn Bhd 1x1000MW coal fired power plant Tanjung bin-4 Johor Malaysia for 11 months as a Engineer in Planning and Project Control.
 Handling the project viz
• Plan and prepare the schedule in MSP, time to time updating of the program. Moreover, Ensure that all concern persons are aware of the schedule.
• To work out the resource requirement to fulfill the schedule prepared i.e. Manpower, Material, and Equipment.
• Preparing the safe lifting plan using AutoCAD for lifting the heavy equipments and make sure about lifting procedures, Risk assessments, safety analysis, Load chart, Load testing, certification of the crane & other lifting equipments, tool box talk and permit for work from client.
• Prepare the required presentation to regulatory organization.
• Analyze the gap between planned v/s achieved.
• To assist the project manager in monitoring of work plans, resource utilization productivity studies etc.
• Preparation of daily, monthly, season ending report.
• Attending the meeting with client and report on the progress of the works in a daily basis. Ensure optimal utilization of all common tools and processes.
• Monitor all communications and provide efficient feedback for all processes.
• Coordinating and regulating various meeting such as project progress review meeting to Ensure project schedule is on track to meet deadlines.
• Developing and monitoring project cost forecast.
• To make the proper changes in project or contract when needed.
• Prepare and submit the month wise running bill and additional claim.
• Reconciliation of project materials.
• Prepare and submit the final bill and amendment.
• Follow up for the payment.

Shift Incharge at MCT Cards & Technology Pvt Ltd
  • India - Bengaluru
  • January 2009 to September 2011

A competent professional with 2 years 8 Months of experience.
•Handling the project viz
•Planning & schedule for production.
•Daily meeting with department wise concerned people like operator and team leaders to achieve.
•Preparing the documentation in chain system to easy to track the oversight.
•Monitoring planned vs achieved and taking the action against interruption.
•To guide the operators to maintain the tools and machineries, once in a week handover machineries to maintenance team.
•Proper planning as per client requirement.
•Approve the job after checking the alignment and data.
•Control the overtime and achieve the daily progress in normal hour to confer the more profit to the company.
•Reporting to the Floor manager in daily basis and confer the brief explanation of constrain and employee needs

Site Engineer at consolidated construction consortium limited
  • India
  • July 2008 to December 2008

A competent professional with 6 Months of experience.
•Handling the project viz
•Arrangement and preparation of the drawings and handover to contractor.
•Aware of contractor requirements of equipment’s like crane, hydra, forklift & material.
•Checking the safety procedures like Safe lifting plan, work permit and PPE
•Aware of the job schedule and pressurizing to increase the productivity.
•Fix and discussing with seniors about the problems like drawings modification and constraints
•Aware to avoid the manpower & equipment idle.
•Checking and clarifying the running bill of the contractor.
•Discussion and meeting with concern contractor engineer to solve the problems to achieve the schedule.

Education

Diploma, Mechanical Engineering
  • at Dr.T.M.A Pai Polytechnic Manipal
  • January 2008
Diploma, CAD in 2D
  • at Manipal Institute Of Computer Education
  • January 2007

courses: Designing In Auto Cad

Diploma, CAD in 3D
  • at Manipal Institute Of Computer Education
  • January 2007

courses: Designing In Auto Cad

Diploma, Project Planning & Management Using Ms Project
  • at CADD Centre
  • January 2007
High school or equivalent,
  • at St Lawrence Pre University College
  • January 2004
High school or equivalent,
  • at St.Lawrence Junior College
  • January 2002

Specialties & Skills

Planning
Project Coordination
Project Estimation
Billing
Scheduling
BILLING
CUSTOMER RELATIONS
DOCUMENTATION
ENGINEERING
FORKLIFT OPERATOR
PROGRESS
REPORTS
REQUIREMENTS

Languages

English
Expert
Hindi
Expert

Hobbies

  • Playing Cricket, Watching TV , Listening Music and surfing at internet