project manager
Dai Lin Ltd
مجموع سنوات الخبرة :31 years, 4 أشهر
Coordinate sales and design as preparation for the fabrication
Monitor and program the design work
Find subcontractor and material supplier and prepare the contract basic
Program the fabrication and third part manufacturing following the
design and the site schedule
Arrange the site team and equipment and prepare the method statement
of the installation
Take place in site meetings and coordination meetings
Maintain the budget incl. the variation documentation
Control the program
Arrange and monitor the documentation of the project incl. ISO
Arrange the site setting out incl. the temporary site office and site workshop
Select suitable equipment and arrange the maintenance
Train the installation worker before and on the job
Arrange the transportation inlc. loading and storage
Supervise the installation
Manage subcontractor
Maintain site documentation (daily report, material list, site progress report)
Preparation, documentation and valuation of site variation
SITE MANAGER
Supervise the installation
Manage subcontractor
Maintain site documentation (daily report, material list, site progress report)
Preparation, documentation and valuation of site variation
Supervise the installation
Maintain site documentation (daily report, material list, site progress report)
civil engineering of mainteance work of production facilities
first company in my carreer where i learned the basic for steel and glass construction/ after my training of 3 years i worked as a technical mostly in the design and project department where I
-analyze the site basics
- Prepare standard section and details
- choose materials, fabrication- and installation method following the design
- Arrange and monitor the draftsmen work
- Prepare all the material list and site inspection requirements
- Arrange and monitor proper documentation
Coordinate design and the operation scheduling
- Arrange and monitor the preparation of the “as build drawings”
- coordinate the design, fabrication and installation work
first company in my carreer where i learned the basic for steel and glass construction/ after my training of 3 years i worked as a technical mostly in the design and project department where I
-analyze the site basics
- Prepare standard section and details
- choose materials, fabrication- and installation method following the design
- Arrange and monitor the draftsmen work
- Prepare all the material list and site inspection requirements
- Arrange and monitor proper documentation
Coordinate design and the operation scheduling
- Arrange and monitor the preparation of the “as build drawings”
- coordinate the design, fabrication and installation work