Site Turnover - DFO Coordinator (including System Completion)
JGC Corporation
Total years of experience :26 years, 11 Months
- Coordinate the systems completion certification process for Barzan Onshore Project and ITR’s registration into TOMAS system. (TOMAS = JGC Turn Over MAnagement System)
- Elaborate and implement “Site DFO Procedure” for Barzan Project.
- Manage site certification team.
- Provide MAP’s and System’s completion reports to Turnover Manager.
- Organize together with Subcontractors and Client, the preparation and the review process of the project Fabrication Records Books (FRB’s) and System’s Mechanical Completion Package, as part of Site Documentation for Operation - (Site DFO).
- Perform external QA audits on SCTR’s
BARZAN Onshore Project, QATAR, Ras Laffan
- Lead of Documents & Standards Technical Team
- Organize the activity for remediation of technical documentation affected by revision control deficiencies.
- Perform QA internal audits
- Elaborate and implement “RasGas Facilities Documentation Management Manual”
- Coordinate the System's completion certification process for RGX2 & AKG2 Projects and ITR’s registration in WinPCS System.
- Elaborate “Job Data Book Review and Approval Procedure” for RGX2 & AKG2 Projects
- Manage site certification team.
- Provide MAP’s and System’s completion reports to Turnover Manager.
- Organize, together with Subcontractors and the Client, the preparation and the review of the Job Data Books (JDB’s) and System’s Mechanical Completion Package, as part of Site Documentation for Operation (Site DFO).
- Perform external QA audits on SCTR’s
Project: RasGas Onshore Expansion Phase 2 (RGX2 and AKG2) QATAR
- Monitor and coordinate with Client and CTJV Discipline Managers, the issuance, approval and the close-out of Specification Concession Requests (SCR’s). Initiate the revision of the Project Specification and ITP’s, when required.
- Monitor and coordinate the close-out process of Subcontractor's Technical Queries (TQ's) and coordinate the issuance of Field Design Changes (FDC's), when necessary.
Project: RasGas Onshore Expansion Phase 2 (RGX2 and AKG2) QATAR
- Coordinate activity of Document Control Centre;
- Implement CDMS and E-Cosmos software application;
- Elaborate Document Control Procedure and implement document’s review and approval process accordingly;
Project: RasGas Onshore Expansion Phase 2 (RGX2 and AKG2) QATAR
- Perform the calculus and Issue Mechanical Data Sheets for Static Equipment (FEED stage)-Storage Tanks-API 650/API620, Pressure Vessels-ASME VIII div.1/div2 or ISPESL VSR, Heat Exchangers-TEMA or API660
- Perform Technical Evaluation of Vendor’s Tenders & prepare Pre PO Evaluation Reports.
- Perform the review of the Vendor technical documentation (Storage Tanks, Pressure Vessels) after contract awarded.
Projects:
- SAN NAZZARO REFINERY - ENI - ITALY
- TARANTO REFINERY - ENI - ITALY
- MOHAMMEDIA REFINERY - SAMIR - MOROCCO
As Head of Mechanical Design Department:
- Supervise design activity for piping and static equipment
- Perform stress calculus for piping and static equipment (pressure vessels, storage tanks).
- Perform final verification for technical documentation for new designed equipment (pressure vessels and tanks).
- Perform final verification for technical documentation of plant arrangement and piping connections
- Coordinate the preparation of technical documentation for repairing and/or transforming of floating roof storage tanks in storage tanks with fixed roof and internal floating cover.(API650/API653)
As QA Coordinator:
- Implement and maintain the Quality Management System according ISO 9001
- Organize and manage the QA activities.
- Prepare the system quality procedures;
- Prepare and implement internal audit plan
- Perform internal audits.
- Act as Quality Management Representative
- Supervise design activity for weighing and metering equipment
- Perform stress calculus for steel structures of weighing bridges;
- Perform cinematic and dynamic calculus for mechanisms.
- Perform the final verification of mechanical and instrument technical documentation.
- Coordinate with Clients the repair activity of weighing systems, when required.
- Perform stress analysis and mechanical design for metallic structures of draft tubes and spiral chambers.
- Detail design for metallic structures of hydropower equipment
- Mechanical design for draft tubes, spiral chambers (hydro-power equipment)
- Mechanical Engineer for oilfield equipment.