Project Engineer/Senior Planning Engineer
WorleyParsons-Arabian Industries JV
Total years of experience :19 years, 4 Months
Handling the south Oman tank maintenance jobs from the planning stage to close out stage. Taking care of the responsibilities of project engineer from Initial preparation of scope, budget for the work, and estimated forecast of the value of work done. Preparation of schedule, planning packages to take the maintenance jobs. Analysis of the work progress and lead the team to achieve the target. Involving in lean model to achieve optimization in cost and efficiency of work. Identify and evaluate the options of strategy, methods. Critical path analysis, variance & delay analysis of schedules and work programs.
Achievements: - Safe and successful completion of 2017 do ability, completion of 15 tanks maintenance. Development of lean and SOP for the tank maintenance works.
Integrated Planning Engineer, BG India, Mumbai, India (Shell)
Developed Asset 8 Year plan, 3 year & 90 Day to support the business and functional heads. Closely associated with Department heads, planners for preparing, consolidating long term functional plan in line to the business plan and integration of the same for effective safety and productivity. Data analysis to production engineer for accurate production forecasting. Working as Asset shutdown planner to support the shutdown management inline with OSCAR process. Develop individual shutdown schedules, manpower histogram & do schedule risk analysis. Identifying the planning issues and flag in time, prioritize the activities and de conflicting of future plan to achieve cost reduction and highest accuracy for the projects, well Engineering & operation/maintenance jobs. KPI analysis and taking necessary action to improve the planning process. Conduct SIMOPS, risk assessment of the activities and Interface between project and operations to execute the job efficiently.
Manage 3 year, 90 Day and 6 Week Integrated Plans and the scheduling of activities. Facilitating the interface with the offshore facilities to develop the execution schedule for all offshore work and tracking its execution. Planning of major shutdowns, projects and long term strategy. Develop resource loaded project schedules and long term maintenance & asset Integrity plans in to an integrated plan to provide greater reflectivity to produce a joint arrangement of work for effective execution. Identify the risk and opportunities in operations, projects and shared resources. Ensuring the maturing the activities in to different plan horizons. Measure the KPI of integrated plan and analyze how the individual functions performed, generation of monthly reports. Support the asset shutdowns by creating the schedules, reviews, challenge session.
Senior Planning Engineer, WorleyParson-Arabian Industries Ltd, Muscat, Oman. PDO Engineering and Maintenance Contract at Nimr location
Work with site manager and see that development is taking place in the most suitable method and sequence of construction operations are going on perfectly in scheduled projects. Plan and supervise the entire program of work and must foresee a contract's demands in terms of work force, materials, equipment and technical challenges. Lead the Project Team for schedule performance, manage contractor invoices and measure the projects and maintenance performance. Performed as shutdown coordinator for the projects and maintenance and represented organization in different challenge session
Achievement: - Completed multidiscipline projects, maintenance jobs and shutdown works. Directly handled the resources at site level.
Support the project manager in preparation of schedules, identify key project areas, critical path and delay analysis techniques. Co-ordinate with project team to resolve the technical and commercial proposals. Manage project resources, materials as per the business objective. Pivotal in developing the E-Pipe book, the online system for maintaining Project quality inspection documentation system. Central role in handing over the system from project team to operations and work with different audit group. Developing and maintaining Communication and Correspondence management from different stake holders.
Achievement: - Accomplished the 400 Km pipeline work and 8 main line valve station from initial survey to commissioning with more than 2.5 million man hours. Completion of punch points and handing over the system to operations team
Planning Engineer, PunjLloyd Ltd, Jamnagar & Bharuch, Gujarat, India. Construction of Essar Crude Oil Terminal Project & Petronet LNG Terminal
Preparing the schedule, monitor the project progress and assist the construction manager to complete the activities within time in the right way. Identify the key resources, dates, targets and figure out the best and most efficient way to complete the project. Liaison with contractors and client for the monthly invoice, cash flow and contract management for smooth execution. Synchronize between engineering and construction team for the distribution of accurate deliverables in correct time. Established the material reconciliation strategy and successfully executed in enhanced way.
Achievement: - Successfully completed and handed over the 10 no. crude oil tanks as per the baseline. Efficiently managed the site location with more than 0.7 million man hours.