Sabah Qureshi, Planning Enginner

Sabah Qureshi

Planning Enginner

Commodore Contracting Company

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Master, LLM Construction Law & Arbitration
Expérience
13 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 7 Mois

Planning Enginner à Commodore Contracting Company
  • Émirats Arabes Unis - Abu Dhabi
  • Je travaille ici depuis avril 2016

• Preparing construction Baseline for execution accordance with consultant and contractor mutual understanding.
• Update of Baseline & Recovery program and related reports e.g. Dashboard, Cost Control, KPI & Management etc.
• Monthly and weekly Progress Reports for submittal to consultants/clients.
• Weekly & Monthly Update of Work program and related Engineering Master logs.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Preparing Resource Histograms, expected Cash Flows and S-Curve.
• Communicating with the Project Manager and project all through the process and monitoring/reporting activities of Interior and Infrastructure.
• Coordinating with MEP Subcontractor for their Engineering logs.
• Preparing labor & non-labor Resource breakdown reflecting on activities under the light of BOQ for building other than Main Hospital Building. Preparing Resource Histograms, expected Cash Flows and S-Curve for building other than Main Hospital Building.

Planning Engineer à Daary General Contracting (Rays International)
  • Émirats Arabes Unis - Abu Dhabi
  • septembre 2014 à mars 2016

• Preparing Baseline Program in accordance with the contract documents, specs, Drawings & BOM/BOQ by using PRIMAVERA.
• Coordination with client and consultant for work progress and attend the meetings Project weekly/ monthly progress.
• Update of work program and progress related reports.
• Preparing Extension of Time (EOT) claims.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Preparing Resource Histograms, expected Cash Flows and S-Curve.
• Communicating with the Project Manager and project all through the process and monitoring/reporting activities of Interior and Infrastructure.
• Maintaining and documenting the Extension of Time (including variations) for each project and pre-warning the Operations Team and management for requirement of extension of time.
• Preparing Monthly and weekly Progress Reports for submittal to consultants/clients.
• Preparing Recovery Programs for approval by clients and consultants, With prior approval by the management.

Planning Engineer à Phoenix Timber Factory LLC
  • Émirats Arabes Unis - Abu Dhabi
  • novembre 2013 à août 2014

★ Developed the Baseline work Schedule for projects related to Joinery & Civil Works
★ Responsible for Progress Reporting, monitoring, and had highlighted any deviation from baseline program
★ Weekly Factory and Site visit for the collection of progress data
★ Prepared cost estimate evaluation for Bill of Quantities related to Joinery & Civil Works
★ Essential study of Drawings, contract and based on tender identified the desired product requirement
★ Follow up with raw material suppliers for rate and cost estimate till end product

Planning Engineer à Areenouf Group
  • Émirats Arabes Unis - Abu Dhabi
  • décembre 2012 à octobre 2013

• Planning & scheduling the project in accordance with the contract documents, specs, Drawings & BOM/BOQ’s by using PRIMAVERA.
• Coordination with client and contractor for work schedule and attend the meetings with related authorities for Project weekly/ monthly progress.
• Update of Baseline Program & KPI.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates. Look ahead work schedule with real time activities.
• Identifying alerts regarding work schedule.
• Preparing resource histograms and Cash Flow.
• Communicating with the Project Manager and the supervisors all through the process and monitoring/reporting activities of Interior/ Infrastructure for execution to handing over.
• Maintaining and documenting the Extension of Time. Maintaining the delay analysis & to ensure every issue is being recorded & addressed in Issue log.
• Alarming management and execution team about anticipated delays on any critical component of the project. Preparing Monthly Progress Reports for submittal to consultants or clients.
• Preparing Recovery Programs for approval by clients and consultants. Responsible for monitor the progress in the fit out / construction process and continuous checking with project schedule.

Planning Engineer à Al-Prince Engineers Ltd
  • Pakistan - Lahore
  • juillet 2011 à novembre 2012

• Preparing Baseline Program in accordance with the contract documents, specs, Drawings & BOM/BOQ by using PRIMAVERA & MS Project.
• Coordination with client and consultant for work progress and attend the meetings Project weekly/ monthly progress.
• Update of Baseline Program, KPI and Preparing resource histograms.
• Identifying applicable Work Breakdown Structure (WBS) and preparing their planning, Schedule along with their resources allocations including loading and leveling of resources, equipment, deployments, and their start and end dates.
• Look ahead work schedule with real time activities.
• Identifying alerts regarding work schedule.
• Coordination with client and consultant for timely completion of the activities and attend the meetings with related authorities for approvals.
• To monitor the progresses in the construction process and continuous checking this with the project schedule.
• Analyze the construction sites as well as the local environments to arrange proper logistics solutions and resources in order to execute the program.
• Coordinating filed activities regarding design changes and internal scheduling with consultants and project manager.
• Responsible for the daily progress report of the Civil, Mechanical & Electrical works and informed the Site Incharge, construction manager, consultants and clients.
• Supervision, checking of subcontractor’s bill and coordinating their on-field work.

Site Engineer à Ghulam Habib Co. Ltd
  • Pakistan - Peshawar
  • décembre 2010 à juin 2011

• Ensure Quality of work at site.
• Prepare the bar bending schedule.
• Preparation of concrete pouring slips.
• Complete Layout for Domestic Building Works.
• Responsible for all on-site buildings construction activities.
• Supervision and Execution of all kinds of Domestic Building Works.

Intern à Metecno Pakistan (Pvt) Ltd
  • Pakistan - Lahore
  • juillet 2009 à août 2009

• Checking of Bill of Quantities.
• P.E.B (Pre-Engineered Building).
• Worked in L.G.S (Light Gauge Structures) under the light of BS Code and ACI.
• Estimation of Quantities, Tensile and Chemical Properties of Nut Bolt Assembly.

Éducation

Master, LLM Construction Law & Arbitration
  • à The Robert Gordon University
  • juin 2022
Baccalauréat, Civil Engineering
  • à CECOS University of IT and Emerging Sciences
  • février 2011

Specialties & Skills

Earned Value Management
Planning
Primavera P6
Project Control
Civil Engineering
MS Office
MS Project 2010
Primavera
Planning
Engineering Management
Primavera 6
Planning Engineer

Langues

Arabe
Débutant
Hindi
Moyen
Urdu
Expert
Anglais
Expert

Adhésions

Project Management Institute
  • Member
  • October 2015

Formation et Diplômes

PMP (Formation)
Institut de formation:
Cambridge Educational Institute
Date de la formation:
September 2017