Sabu  baby, Sr.HSEQ Manager

Sabu baby

Sr.HSEQ Manager

Air Energy

Location
Qatar - Doha
Education
Master's degree, Safety
Experience
28 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 9 Months

Sr.HSEQ Manager at Air Energy
  • Qatar - Doha
  • My current job since March 2023
SHES SYSTEMS LEAD at Qatargas
  • Qatar - Doha
  • March 2022 to March 2023
Sr. Manager at Manateq
  • Qatar - Doha
  • April 2019 to March 2022

OHSE and
Business Continuity
Qatar Economic Zone Authority - QEZ
Muhibbah Engineering Middle East LLC
Project brief; Qatar Economic Zone Authority - QEZ
Design, Construction and Erection of a Shiplift in form of Syncrolift or equivalent and Travel Lift with Ancillaries and all Associated
Works, and slip way in the marine basin Qatar Economic Zone QEZ adjacent to Hamad Port enhancing Qatar from sea access
through a dedicated canal. 380Ton capacity travel lift. 2800Ton capacity synchro lift. A 200 million Project.
Mar 2014 Apr 2019 Program Manager OHSE and Business Continuity
(Client Representative)
QPM (Qatar Project Management- a
Barwa Subsidiary)- PMC
Project brief; ISF/ Lekhwyia Qatar
The ISF - 20 billion Duhail Camp Development, the first development in Qatar targeted to achieve the QSAS Neighbourhood (4)
Stars Certification, is a large scale mixed-use project located in Doha.
Responsible to manage 5 consultants KEO (SC); DAR (SC); AEB (DC);CGC(FMM);ECG(DC) and 12 main contact package(CP)
contractors.

Sr. Manager at Doh
  • Qatar
  • October 2012 to March 2014

HSSE and Business Continuity Punjlloyd Ltd.

Sr. Manager at Selex Finmecchanica
  • Qatar - Doha
  • December 2010 to October 2012

and Business Development Selex Sistemi Integrati SpA, Hamad
Intl.Airport, Doha Qatar
Page 3 of 3
Project Brief; Hamad Intl. Airport Doha Qatar
15 billion USD Project that holds 93 million passengers per year, 360, 000 aircraft movements per year, 2 million tonnes of cargo,
built over 22 square kilometres of land, half of which is on reclaimed land, 138 check-in counters, 2 parallel runways located 2kms
apart. Interfaced Terminal Building stakeholder, Multi storey car parks, Taxiways and Aprons adjacent to the Terminal. ATC & Met
Equipment (with civil works) in ATC, PTC and other facilities spreads in 25 Sq Kms covering two 6Kms runways coordinating 27
main contractors HSE Team. Successfully assisted Company calibrating 4 localizers, 4glidepaths, PAPIs, Approach lights, DVOR,
VDF and other NVAID facilities.

Sr. Consultant at HSE Engr Dorsch Gruppe
  • United Arab Emirates
  • July 2010 to December 2010

Project brief; Mixed Use Project for ADNOC Ruwais, Abu Dhabi
The Ruwais Housing Complex, covering an area of 06 square kilo meters, is located 10 kilo meters away from the industrial plants.

Manager at HSE
  • United Arab Emirates
  • December 2007 to July 2010

(Client Representative)
HILL Intl - Salfo (JV), Corniche, Abu Dhabi
Project brief; International Capital Trading LLC (ICT) Nation Towers, Abu Dhabi, UAE
The $435 million high raise tower project consists of 2 towers 65+2 and 52+2 floors, connected with a skybridge at a height of 202.5
meters which connects floors 50 and 54. The skybridge was the highest in the world at its completion.
2
nd
Project brief; North / South Extension to Ras Abu Abboud Road. NDIA/00001/01

  • June 2007 to May 2009

Contract Price: QR 740, 000, 000.00

HSE Advisor at National Petroleum Construction Company
  • United Arab Emirates
  • November 2006 to December 2007
HSE Advisor at NSH Corporation
  • Qatar
  • June 2005 to October 2005

Project brief; Dolphin Project, Ras Laffan Industrial City, Qatar
The project mainly involves development of gas wells and installation of two platforms in Qatar's North Field;two multiphase sea
lines from the wellheads to the processing plant; gas processing and compression plant at Ras Laffan in Qatar; offshore pipeline
from Ras Laffan to Taweelah in the UAE; gas receiving facilities at Taweelah Adu Dhabi. The total costs of the project are $7 billion,
of which $3.5 billion are costs of the offshore pipeline.
Procedure implementation, Review and audit, Site visits and inspections. Investigation and prevention. Observing and eliminating
hazards.

HSE Advisor at LTL
  • India
  • September 2004 to May 2005

Project brief; Vasai East Development, Ulsoor, Bangalore
Medium scale civil housing project with all associated infrastructure development.
HSE Systems management. Inspection and monitoring. Risk Assessment and Review.

at Air Craft Safety
  • August 1989 to August 2004

Tasks brief; Various Indian Airforce Air Fields
I had been deployed in five sensitive operational Air bases during my 15 years of active service in The Indian Air Force. Made
myself full time active and engaged in the Air Field Safety and Technical surveillance of Indian Air Force bases for 15 continuous
years.
Multiple technical management tasking with Air Field Safety in to consideration

Education

Master's degree, Safety
  • at University of Greenwich
  • January 2018

courses: Memberships and Recognitions IOSH Chartered Fellow of IOSH - CFIOSH (189048) BCSP (ANSI) Safety Management Specialist – SMS (1119) ICRA Certificated Lead Auditor ISO 45001:

Specialties & Skills

Internal Audit
APPROACH
BUSINESS DEVELOPMENT
MICROSOFT WORKS
AIR FORCE
DOLPHIN
RECEIVING