Electrician
kharafinational
Total years of experience :19 years, 4 Months
Knowledge of DGA (Dissolved Gas Analyzer) test
Knowledge of Transformer Oil Tan Delta test.
Knowledge of Transformer Oil Dielectric Breakdown Voltage test.
Knowledge of Moisture Content Analyzing of Transformer Oil.
Knowledge of Digital Weighing test.
Generate requisition for materials, services and equipment in phases as per works progress requirement.
Expedite materials or service requirement with purchase section.
Ensure that the Project Quality Requirements are properly identified, implemented and documented.
Provide construction data inputs for the establishment of project schedules and construction cost estimates.
Troubleshot and repaired light and power systems.
Maintained and operated emergency generators
Check and verify materials used in the construction are in accordance with given specification.
Ensure work progresses are in accordance with Loss prevention & control department’s procedure with respect to work permit and safety precaution.
Operations of 11/.433kv sub-station (HV/LV distribution section).
The load and voltage control of incomer transformers and feeders.
Ensuring the relay operations, indications etc.
Maintenance of Power transformers and Distribution Transformers
Operation & Maintenance of 11KVCircuit Breakers (OCB &VCB)
Maintenance & testing of over current, Earth fault relays & pilot wire protection relays.
Transformer oil filtration & Testing of Dielectric strength (BDV)
Erection & Commissioning of 11/.433 kv substations.
Cable laying & terminations under taken up to 300 Sqmm
Maintenance of Battery & battery chargers
EXPERIENCE IN KUWAIT: From To Relevant Technical, Management Experience & Occupation Project Names
May, 2008 June, 2009
Doosan Heavy Industries & Construction LTD.
MEW Project
Water Treatment Plant
Project No. 8
Subaiya
April, 2010 Till Continue
Kharafi National Company
MEW Project
11/0.433 kV Ring-Main Substation Maintenance
Project No. 1641
Fahaheel
CURRENTLY WORKING EXPERIENCE
➢ Knowledge of DGA (Dissolved Gas Analyzer) test
➢ Knowledge of Transformer Oil Tan Delta test.
➢ Knowledge of Transformer Oil Dielectric Breakdown Voltage test.
➢ Knowledge of Moisture Content Analyzing of Transformer Oil.
➢ Knowledge of Digital Weighing test.
➢ Generate requisition for materials, services and equipment in phases as per works progress requirement.
➢ Expedite materials or service requirement with purchase section.
➢ Ensure that the Project Quality Requirements are properly identified, implemented and documented.
➢ Provide construction data inputs for the establishment of project schedules and construction cost estimates.
➢ Troubleshot and repaired light and power systems.
➢ Maintained and operated emergency generators
➢ Check and verify materials used in the construction are in accordance with given specification.
➢ Ensure work progresses are in accordance with Loss prevention & control department's procedure with respect to work permit and safety precaution.
➢ Operations of 11/.433kv sub-station (HV/LV distribution section)
➢ The load and voltage control of incomer transformers and feeders.
➢ Ensuring the relay operations, indications etc.
➢ Maintenance of Power transformers and Distribution Transformers
➢ Operation & Maintenance of 11KVCircuit Breakers (OCB &VCB)
➢ Maintenance & testing of over current, Earth fault relays & pilot wire protection relays.
➢ Transformer oil filtration & Testing of Dielectric strength (BDV)
➢ Erection & Commissioning of 11/.433 kv substations.
➢ Cable laying & terminations under taken up to 300 Sqmm
➢ Maintenance of Battery & battery chargers
Maintenance of power transformers and distribution transformers(11kv/440v) with their related switchgears
Over hauling of LT motors
Maintenance of Battery Bank
Troubleshooting of plant street lighting circuit and replacing
Troubleshooting of motor operated valve
Control panel wiring and D.B. assembly
Able to read drawing and understand it
Industrial conduct wiring
Cable gland and end termination LT cable up to 240sqmm
Termination of MCC power cable and control cable
Lightning fitting, installation and troubleshooting their circuits
Daily routine check instruments and chart change.
February, 2004 May, 2005 Mahatech Civil & Contracting Company BRC Project- SD11
➢ Maintenance of power transformers and distribution transformers (11kv/440v) with their related switchgears
➢ Over hauling of LT motors
➢ Maintenance of Battery Bank
➢ Troubleshooting of plant street lighting circuit and replacing
➢ Troubleshooting of motor operated valve
➢ Control panel wiring and D.B. assembly
➢ Able to read drawing and understand it
➢ Industrial conduct wiring
➢ Cable gland and end termination LT cable up to 240sqmm
➢ Termination of MCC power cable and control cable
➢ Lightning fitting, installation and troubleshooting their circuits
➢ Daily routine check instruments and chart change.