Project Engineer
K.F. Corporation (Pvt) Limited
Total years of experience :30 years, 0 Months
1. K.F. Corporation (Pvt) Limited: November 1995 to date
Designation: Project Engineer
The following assignments were allotted which I successfully accomplished:
• Stringing, Welding, Lowering, Pigging, Testing and Commissioning of 7.5 Km. Pipeline dia.12" and 2.5 Km. Pipeline dia. 8" for Sui Southern Gas Company at PNAD colony and workshop, Maripur in accordance with API 1104
• Planning, execution, and monitoring of about 180 different jobs of piping dia. (½" to 30"), Renewal of air cooler shrouding & Rehabilitation of flare stack under Annual Shut-down in September, 1996 at Pakistan Refinery Limited.
• Asphalt Coating, Laying, Welding, Pigging, Testing and Hook-up of cross country pipelines dia. 12", 10" & 8" over extension of pile bridge at first sea channel crossing for PRL.
• Completed renovation of 180 ft. dia. Cone roof Furnace oil tank at National Refinery Limited, Keamari Terminal with the co-ordination of China Petroleum Engineering Construction Corporation.
• Stringing, Welding, Lowering, Pigging, Testing and Commissioning of 3 Km pipeline dia. 12" for Sui Southern Gas Company behind Karachi University in accordance with API 1104.
• Repairing of 160 ft. dia. Floating roof steel storage tank, and allied civil works at Pakistan Refinery Limited, Keamari Terminal in accordance with API 650 and
API 620 standards.
• Internal modification, Testing, Sandblasting and Painting of 700bbls skid mounted rectangular tanks (3 nos.) for Union Texas Pakistan Inc. at Khaskeli
field.
• Replacement of dia. 16" vapor line in Turnaround February 1998, at National Refinery Limited.
• Construction and Installation of HCL absorber vessel foundation and allied steel structural works at Pakistan Refinery Limited.
• Fabrication and Installation of Equipment, Machinery and Piping dia. 1" to 20" in Furnace oil filling gentry at Pakistan Refinery Ltd.
• Laying and commissioning of dia. 4" Raw water recovery pipeline with 22 nos. pumps at Pakistan Refinery Limited, Korangi.
• Renovate 10 Nos. Oil storage tanks during Annual contract for replacement of roof, bottom and structures partial / complete of tanks dia. up to 70 ft. at NRL,
Korangi.
• Completed 4 nos. rectangular skid mounted 40 ft. x 8 ft. x 10 ft oil storage tanks with all accessories for Pakistan Oilfields Limited at Rawalpindi.
• Repairing of 2 nos. 58 ft. dia. Kerosene oil storage tanks (SP-7 & SP-8) at NDP, Shell Pakistan Ltd., Keamari Installation.
• Traverse Survey, Geo-technical Soil Survey, Soil Resistivity survey, and complete Engineering design i/c Hydraulic analysis, Surge analysis and Stress analysis of 6" inch dia. Crude Oil Pipeline from Turkwal to Attock Refinery (56 Km) for Pakistan
Oilfields Limited, Rawalpindi.
• Fabrication of Galvanized Serrated Steel Grating 2" x 2" x 10 ft. long span as per McMaster P/N 60667T23 for Union Texas Pakistan Inc.at Badin.
• Construction of Waste Water Treatment Plant including Civil & Steel structure works and installation of various pumps and weirs plates and other equipment.
• Planning, execution, and monitoring Civil works of System Improvement of KESC Network, work included complete architectural / civil / structural design and construction of 3 new grid stations (at Mauripur, Old Town & West Wharf) and
additions in existing 4 grid stations (KDA Scheme No. 33, Baldia, Queens Road & Valika) - 220 / 132 kV GIS & 11 kV Switchgear Buildings), i/c Control Rooms, Auto / Power Transformer foundations (9 nos.), Cable Trenches, Capacitor Rooms,
Surge Arrestor / Cable Sealing End foundations, pile foundations, site infrastructure i/c, plant roads, boundary wall/ gates, site drainage, etc.
• Engineering coordination and services for a number of Power Grid Stations / Head office bldg. for KESC / Siemens Pakistan.
2. Shuja Uddin & Bros: June 1994 to Oct. 1995
Designation: Site Engineer
I accomplished the under mentioned project.
• Fabrication & Erection of steel storage tanks (60 ft. Dia. Floating roof & Fixed roof
100 ft. Dia.) and allied piping works at National Refinery Limited in accordance with
API, ANSI, AWS & ASME Standards.
• Construction of all allied Civil works of tanks like Tank pad, Sewerage works, Dyke
wall and Pipe sleepers etc.