Saeed Omar Al Bukai albukai, Project  Manager,

Saeed Omar Al Bukai albukai

Project Manager,

Arabtech Jardaneh

Location
Saudi Arabia - Jeddah
Education
Bachelor's degree, civil
Experience
24 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :24 years, 2 Months

Project Manager, at Arabtech Jardaneh
  • Saudi Arabia - Jeddah
  • My current job since August 2016

Mar 2020 to Date. Construction Manager, Client Sondos Real-estate.
Tahliya Gate Towers, with contract Value 863m SAR. Project consist of 34
building towers with over 2500 living flats, and all associated facilities and
landscaping.

Mar 2018 to Feb 2020. Project Manager, Client Abdulateef Jameel Land.
Bayt Alfan (Creative Hub in Jeddah) with contract value 65m SAR.
That will stand as Museum and exhibition center in Jeddah, with high class
finishing materials for all internal and external work.

Aug 2016 to Feb 2018 Construction Manager, Client Abdulateef Jameel Land.
J/One Vertical Complex in Jeddah with contract value 230m SAR, Which is
luxury residential compound.

QA/QC Manager at Al Bwardi Engineering Consultant
  • Saudi Arabia - Jeddah
  • February 2015 to August 2016

Site quality control manager with deputy project manager responsibilities.
For Alraidah Housing Complex south Abhor with contract value 1.86 B. SAR.
The project is residential buildings (74 buildings will provide 2560 departments)
of 6, 8 and 10 Stories, subsurface foundation (piles and raft) with more than 6400
piles, dia of 800 mm and 22 m depth.
• In addition to undertaking QA to improve deliverable quality, ensure and initiate a
series of ‘Quality Control’ (QC) techniques to be implemented.
• Eliminate any variances in the quality of the deliverable produced from the quality targets set
• Review the process monthly to ensure that weekly peer reviews are being formally undertaken
• Review and amend the contractor quality plan.

Infrastructure & Utilities Manager at Jeddah Economic Company
  • Saudi Arabia - Jeddah
  • April 2014 to February 2015

• Researching potential consultants, and management of tendering process, for the
appointment of Lead Engineer/ Infrastructure Consultant/ Architect
of Record for the Kilometer High Tower and associated 5.3m.sq.m. masterplan.
• Handle all data collection and leasing with major authorities and stakeholders.
• Consulted and built relationships with key stakeholders to improve planning and strategy development.
• Involved in the Memorandum of Understanding signed with Saudi Tabreed for the district cooling.
• Negotiating for the waste and trash vacuuming system with specialists.
• Involved in the negotiation with the Saudi Electrical Company for the project permanent connection, (SEC required One bulk station and 9 substations), as well for the temporary connection with Taqaa power provider, and we had MOU with them to supply the project with the power for 25 years till SEC take over.

Sr. Infrastructure Eng at PMDC, international Project Management and Development Consultancy
  • Saudi Arabia - Jeddah
  • October 2010 to January 2014

Feb 2011 to date Jeddah East Project, with project value 773 millions SAR to
execute immediate, temporary solutions for flood control in Jeddah, and to put the
strategically study and full master plane in Jeddah and five earth dams.
My Duty as Senior engineer, Client Representative, to follow the contractual
issues with all consultants and contractors involved in this project, prepare the
executive monthly reports and (RFP) Request For Proposal, time extensions, and
all variation orders, and attend the meeting with H.E Jeddah Mayor.

Oct 2010 to Feb 2011 Jeddah Waterfront, with project value 1.54 billion SAR to
develop Jeddah waterfront and four road connected to it (AlTahleiya, Falasteen,
Flood Canal and middle corniche) As project management company PMDC took
the scope of managing all JDURC Projects and the waterfront one of them.
My duty as Senior civil engineer, reviewing all consultants submitted
deliverables (drawings, technical specifications, materials submittal, BOQ and
other related infrastructure works) as well as design review, monitor the works
design consultant.

Assistant Resident Engineer at Dorsch Gruppe GMBH
  • United Arab Emirates - Abu Dhabi
  • October 2009 to October 2010

Upgrade for Western region sewerage network with contract value 75m Dhs, to enlarge the network in Madinat Zayed, Mirfa, Abu alabyad, Delma and Sila.
• Site manager and control all site activities and safety.
• Assure the client quality requirement.
• Implement the QA\QC plan at the project and develop the quality techniques.
• Perform and issue the monthly progress reports.

Technical Engineer at BESIX, Six Construct Ltd
  • United Arab Emirates - Abu Dhabi
  • December 2006 to October 2009

Oct 07 to Oct 09 FERRARI & RETAIL EXPERIENCE with contract value 1.1
billion Dhs, the Ferrari world is a huge steel structure (space frame), and 3 stories
in addition to two car parking buildings each 3 stories, one shopping mall (Yas
mall and 2 department store (IKEA & ACE). And the entry bridges and traffic
connection to the shopping mall and the car parks, with large scale of underground
networks, sewerage, storm, trash vacuum, district cooling, water supply, power
connection, and gas distribution

Dec 06 to Oct 07 Shahama Sadyat Freeway & Yas Island development with
contract value 2.5 billion Dhs, include 3 interchanges with 26 bridges and one
water crossing bridge and 4 underpass plus 16 Km of road and the infrastructure
along with it, so as to construct 2 marina with diaphragm wall and floating
pontoon for 160 yacht.

Senior Civil Inspector at MWH Montgomery Watson Harza
  • United Arab Emirates - Abu Dhabi
  • January 2003 to October 2006

Management of the construction of large sewerage, pumped and pressure pipeline projects

Site Engineer at SPC Syrian Petroleum Company
  • Syria
  • January 2002 to September 2002

project to construct a school belonging fro the company in addition to 3

building for workers families, the building consist of 4 stories and basement

with full central heating and air conditioning .
project of laying petrol pipe from Syrian desert oil field to Banyas

Petroleum refinery with length of about 100 Km, in my responsibility was

only 20 Km. with Dia 600 mm steel pipes.

Site Engineer at Algammal contracting group
  • Syria - Damascus
  • August 1999 to February 2002

one administrating building in Damascus city, consists of two blocks each block

has 13 stories and one basement. And a block for cinema hall with VIP terrace.

Sewerage network for the UNDOF in AlGolan area with big container
Septic tank and disposal filled. Using UPVc pipe Dia 160 mm - 200 mm
and perforated pipe for the disposal filled.


Ground Libra with weight limit up to 90 tons in duty free in Damascus airport

Education

Bachelor's degree, civil
  • at Damascus University
  • July 2001

Specialties & Skills

Engineering Analysis
Project Management
structural engineer
البرامج الهندسية
البرامج الحاسوبية المكتبية

Languages

Arabic
Expert
English
Expert
French
Intermediate

Memberships

Saudi Council of Engineers
  • عضو
  • June 2011

Training and Certifications

PMP (Training)
Training Institute:
Saudi Engineer Counsil
Date Attended:
March 2017
Duration:
35 hours
Diploma (Certificate)
Date Attended:
July 1999
Valid Until:
October 1999

Hobbies

  • swiming, reading, safari