Health And Safety Manager
Gama construction
مجموع سنوات الخبرة :20 years, 10 أشهر
Project: ( 1) The Project For Improvement Of The Zai Water Supply System Installing water recycling pumps from the
Zay Allan intake area to the Zay Allan pumping station and installing a chlorine station
Installation of 15 water circulation pumps
Zay Allan towing area to the Zay Allan lifting station and an addition to installing the chlorine station
Enhanced operational capacity and energy efficiency of the 5 pumping stations on the water supply
Fixed funds for approximately 1.7 million people in Amman by financing the reconstruction of pumping stations
Project: (2)
Replaced 20 water pumps that had reached the end of theirservice life with advanced pumps
Energy saving, and installing a fifth pump in every 5 stationsto ensure sustainability
The system...to provide watersuppliesto supply the capital, Amman, with a capacity of 100 thousand cubic meters
per day, 38 million cubic meters per year of pure drinking watersystem
The plant consists of a water treatment plant and five pumping stations, each with 4
Pumps and 4 associatedmotors, and a pipeline transmission system, thatstation
Itis one of the importantstations where wateris treated in the traditional way
Through sedimentation and filtration, to produce high-quality water conforming to the Jordanian standard
For drinking water, itissupplied from the springs of Wadi Ma'in al-Zara al-Mujib.
implementing the high-speed bus project between the cities of Amman and Zarqa, the fourth phase, reimplementing the water and sanitation network, building metal bridges, tunnels, bus stops, road lighting, and
Project: King Salman Park, Riyadh, area of 1, 200 Acres
the description : Installing sewage networks, distributing water pipes, and installing water valves and covers for flood and
rainwater manholes. And internal and external pipe networks. Implementing a purification station that discharges and suctions
wastewater.
Implementation of the Campbell Tri-Living Towerfor residential apartments in the Abdali area,
which includes 1, 250 residential units vertically on an area of 40 Acres. It contains health facilities, entertainment
.services, restaurants, parking lots, and many recreationalservices And installing a sewage network
implementation of the Rotana Hotel Tower for Hotel Apartmentsin the Abdali area, which includes
488 hotel units vertically on an area of 22 Acres, containing health facilities, entertainmentservices, restaurants, parking lots,
and many entertainment service
Installing a sewage network in the Yanbu region of Saudi Arabia
the description : Detecting and treating leaks, establishing home connections, replacing water and sewage networks, distributing
drinking water, and establishing pumping and treatment stations and central reservoirs.
Supply and installation of mobile diesel pumps for sewage stations in the Eastern Province, in addition to establishing a
pumping station (PSC) on the water carrier line, establishing a collection tank and a distribution station in the east of Yanbu city.
مهندس بيئة وصرف صحي