Program Manager at Motorola Solutions
  • Oman - Muscat
  • My current job since November 2017

Responsible for CapEx $400 Million Power transmission/ Generation, IT and Telecomm projects to provide new emergency call and response network in all over Oman. Projects involve establishing Network operation centers, Emergency resource management, Ground Based Network (IP/ MPLS), Transmission Backhaul, Computer aided dispatch, IP telephony and Tetra (Data & Voice) radio network. It also includes projects on integrating existing obsolete systems with the new systems.
• Collaborate to focus on priorities, defining investment requirements and the prioritization of projects. Also influence build vs Buy/ Outsource decisions. Collaborate with other organization to utilize the right tools for solutions delivery.
• Review documentation for bidding and oversee selection of third party vendors.
• Allocate resources based on the priorities, shifting as necessary to meet the needs of the business. Manage project resource loading and coordinated disciplines for the technical and project Deliverables.
• Instil an approach of setting and delivering on the goals for key metrics around performance, productivity, and customer satisfaction.
• Supervise generation of the preliminary plans, cost estimation, economic assessment, preparation of AFEs and ERs.
• Ensure application of standards to minimize variances and facilitate controlling the value, cost & time of the project.
• Develop application roadmaps to retire old technologies, while evaluating new enabling technologies with regards to mobile computing and cloud computing, as necessary, to support the evolving business.
• Review monthly reports showing the status of design, material procurement, construction, milestones, AFE (Authorisation for Expenditure) commitments, payments, charges, variances from standards, waivers and problems.
• Promote continual development of the team skills and hold the teams accountable for results.
• Recognize and reward commensurate with performance and provide appropriate succession planning.
• Coordinate changes in project scope, timing or costs and prepared documentation for client approval.

Project Manager/ Plant Services Manager – Sunrise at HUSKY ENERGY
  • Canada - Alberta
  • November 2012 to November 2017

As part of Husky Sunrise Phase1, managed sustaining and infrastructure projects including Automation, IT and Telecomm.

• Overall responsible for the Management of projects from cradle to grave, through different PDM (Project Delivery Module) phase and to identify KPI & VIP. Organized Gate review process for the approval of top management.
• Supported generation of preliminary plans, cost estimation, economic assessment, preparation of AFEs and ERs.
• Coordinated disciplines for the technical and project deliverables. Ensured documents met required Quality and the estimates have the required accuracy. Organized project Risk Assessment and Value Improvement Process.
• Managed staffing and resource loading of the project team, which varied over the time of the project.
• Oversaw application of standards to minimize variances and facilitated controlling value, cost & time of the project.
• Coordinated changes in project scope, timing or costs and prepared documentation for top management approval.
• Conducted post-completion project analysis to ensure project meet stakeholder needs and expectations.

Project Lead at Stantec Consulting
  • Canada - Alberta
  • February 2012 to October 2012

• Liaised with clients for the development of feasibility studies, scoping documents, framing documents, DBM, FEED and Detailed Engineering. Facilitated proper project execution through all project phase including Construction and C&SU. Also participated in Project close outs and post-project business evaluations.
• Coordinated disciplines for technical information. Facilitated key project review meetings including scope reviews, engineering design reviews, P&ID reviews, 3-D Model reviews, controls reviews, HAZOP, construction reviews, etc.
• Ensured accuracy and completeness of project documentation prior to issue and that codes & standards are being met.
• Coordinated procurement actions including vendor selection, defining equipment requirements, preparing and issuing RFQs, vendor bid evaluations and selection, and equipment purchases.
• Developed project man-hour & cost estimates and outlined project life cycle, engineering & construction schedules.
• Managed project cost control and customer status reporting.
• Coordinated submissions of regulatory applications to regulators and government bodies.

Lead Project Engineer (Field) at Baker Hughes
  • Canada - Alberta
  • February 2008 to February 2012

Involved in field inspections and engineering analysis of client pipeline data, I&C systems and Automation equipment.

• Liaised with clients to ascertain their requirements and convert these into technical specification.
• Developed detailed field schedules and coordinated engineering specialists for technical and project deliverables.
• Collaborate in the generation of the Preliminary Regulatory Plan at conceptual stage of the projects.
• Visited client project field sites for Job Risk Assessment, preparation mitigation plan for client approval.
• Maintained Risk Register and conducted RCA (Root Cause Analysis) for risks that actualized during the project.
• Issued critical field reports to clients indicating major anomaly requiring immediate action.
• Anticipated changes in project scope, timing or costs. Prepare documentation to obtain management approval.
• Provided post-completion project and quality reports for management review and approval.

Cost Engineer/ Project Coordinator at Mindset Technologies
  • Canada - Alberta
  • April 2005 to December 2007

The company was subcontractor of General Electric (GE-PII). The projects included Seismic Data Processing & Data Management and pipeline data analysis for GE Energy. The company was also involved in providing Data warehousing and setting up special data centers for GE.

• Analysed and forecasted costs. Developed schedule and cost data for monthly project reports.
• Created and managed detailed project information related to schedule, scope and cost for manager.
• Reported project cost and schedule status to management for internal reviews as well as for analysing cost variances and recommending corrective actions for projects.
• Ensured inspection reports were tailored to customer requirements and format.

Senior Engineering Manager at Pakistan Air Force
  • Pakistan - Islamabad
  • January 1990 to December 2005

Training and experience involved usage of Integrated Computer Systems, Telecommunications, Computer Networks, Electrical Solutions, Radar Systems and Automation equipment from major suppliers including Thales - Thomson CSF, Hughes, Rockwell, Siemens, Climax, Alcatel, Motorola, Nortel and Ericsson. During the service interacted with different vendors and carry out project feasibility studies, recommend most viable options based on operational and maintenance costs, technological factors and other relevant parameters. Also provided Quality Audit services including evaluating training, issuing Work Authorization Card (WAC) based on currency and proficiency of personnel on systems.

Held following appointment;
• Senior Engineering Manager
• Deputy Director Quality Assurance Program
• Senior Quality Auditor & Evaluator/ Engineer
• Senior Electrical Engineer
• Field Engineer

Education

Master's degree, MBA (Finance)
  • at Institute of Business Administration, Univeristy of The Punjab
  • June 2000
Master's degree, M.Sc. Computer Sciences
  • at The National College
  • June 1997

M.Sc. Computer Sciences

Bachelor's degree, B.E. Electrical Engineering
  • at College of Aeronautical Engineering, NED University of Science and Technology
  • December 1989

B.E. Electrical Engineering

Specialties & Skills

Risk Management Consulting
Root Cause Analysis
Quality Management Systems QMS
Primavera P6
Project Management
Industry standard equipment and technical expertise
Strong leadership, team building and decision making skills
Excellent planning and organizational skills
Expert Knowledge of business and management principles
Experience as a plant manager, with proven managerial skills
Quality, productivity, demand creation, inventory and stewardship processes
Highly motivated, results oriented, driven
Strong ability to be adaptable and flexible
Excellent interpersonal communication and listening ability
QMS ISO-9001

Languages

English
Expert
Urdu
Expert

Memberships

Association of Professional Engineers and Geoscientists of Alberta
  • Professional Engineer, Membership # 142208
  • August 2008
International Society of Automation
  • as Professional Engineer, Membership # 33676379
  • January 2008
Pakistan Engineering Council
  • Professional Engineer, Membership # Aero/695
  • January 1990