Safiueddin Abdulhady Elsayed Mohamed Safiueddin, senior structural engineer

Safiueddin Abdulhady Elsayed Mohamed Safiueddin

senior structural engineer

SAUDI OGER LTD

Lieu
Arabie Saoudite - Riyad
Éducation
Master, civil engineering -structural department
Expérience
28 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :28 years, 9 Mois

senior structural engineer à SAUDI OGER LTD
  • Arabie Saoudite - Jeddah
  • avril 2008 à janvier 2017

Leading a technical team, to manage all activities related to the construction documents and to facilitate the work on site.
The work includes also coordination with the international consultants, reviewing shop drawings, materials submittals and following the site needs and progress

1-Reviewing all the design and shop drawings of reinforced concrete and steel structure

2-Technical support for solving all site problems during construction phase for both of steel structure and reinforced concrete.

3-Check all the fabricated (dimensions - numbering) items in the factory before dispatching to site and reviewing the quantities with the material order.

4 -Achieve the structural studying of as built existing building to modify the building usage and MEP requirements and prepare the design drawings and calculation sheet for the modified elements.

5- prepare method statements for applying different methods to repair reinforced concrete such as (flat slabs - columns - beams).
6-Prepare design drawings and structure calculation sheets to assure the safety of building after completing the renovation activities.
7- leading team members to prepare BOQ of KAP-01 of MOI of Saudi kingdom and required drawings of poly lines to facilitate Quantity surveying

area construction manager à SIAC
  • Egypte - Le Caire
  • mai 2007 à mars 2008

Responsibility: construction manager (B) - area manager \nMain activities : Construction of phase (І) of Southern Vally cement Factory at Beni Swif -upper Egypt, which contain cement mill, 3 cement silos with total height 60 ms, clinker silos, packing plant building and Electrical Substation generation buildings, belt conveyor, . Position: Area manager with responsibility of construction, management, cost analysis, time schedule, and shop drawings details, prepare of bar bending scheduale

site engineer - project engineer -project manager - projects manager à EGYCO - ElNasr for Building & construction
  • Egypte
  • mai 1988 à avril 2007

Projects
1- Period from (May 2006 to April 2007)
projects manager of Sewage projects of northern villages of Tanta -Gharbeia - EGYPT.
2- Period from (June 2005 to May 2006)
project manager of The trial project for Egyptian village (Fesha Sleem - Tanta Gharbeia -Egypt).
3-Peiod from (Sep. 1998 to May 2005)
project manager of Ganzour sewage project: the project consists of
a- sewage treatment plant consists of inlet structure, grit removal, Aeration tank, settling tanks including raft foundation under deep well dewatering system, concentration tank, chlorine tank, drying beds, pipe connection between the units of plant, internal pump station, bypass and drainage lines, channels, and piping connection between tanks, all protection against leakage of water.
b- Two lift pump stations.
c- Ductile iron forced pipes 300 mm &500 mm.
4-Period from (Dec. 1994 to Aug.1998)
Consultant supervisor Resident engineer: Consultant Company (Gulf Group for consulting engineering) - Damam - Eastern area - Saudi Arabia Al-Hasa sewage plant, lift stations and main forced pipes: the main plant consists of inlet structure, grit removal, 4 Aeration tank, 8 settling tanks and their foundation, sludge pump station, internal pump station, dewatering building, polymer building, administration building, drainage line, piping net connection between tanks, chlorine tank and drying beds. the job responsibility including supervising of Earth moving, construction of the previous structure, all protection against leakage and chemical attack, piping connection between tanks. the aeration tanks were designed including expansion and contraction Joint, but settling tank were designed including construction joint.
5-Period from (May. 1994 to Dec.1994)
project Manager of sewer network pipelines in Queessna -Menufyia-EGYPT
a- Four lift pump stations
b- Ductile iron forced pipes 300 mm & 500 mm
c- sewer pipe lines and manholes of 42 km for different diameter (175 - 900) mm
5-Period from (June. 1993 to April.1994)
project Manager of Sheben El koom sewage project, . Contractor Company: Construction and remolded of forced pipe line and sanitary infrastructural. Concrete Repair for lift station No: 4 and its super structure building. Concrete floor slab for internal roads and facilities.
6- Period Oct. 1992 - May 1993
Resident Site Engineer: (ELNSR for building and constructions) - El-Gabal El-Asfar sewage plant:
7- Period May 1991 - Oct. 1992.
project Manager of sewage plants of Queessna -Menufyia-EGYPT
a- Earth moving.
b- The fence of the plant consists of reinforced concrete Retaining wall up to 7ms height and masonry wall,
c- sewage treatment plant(10000 m3) consists of inlet structure, grit removal, Aeration tank, settling tanks including raft foundation under deep well dewatering system, concentration tank, chlorine tank, drying beds, pipe connection between the units of plant, internal pump station, by-pass and drainage lines, channels, and piping connection between tanks, all protection against leakage of water.
8-Period April 1991 - may 1991
Site engineer: (ELNSR for building and constructions)Sheben El-koum sewer lines net
9- Period Dec. 1990 - April 1991.
Site Engineer: (ELNSR for building and constructions) - El-Gabal El-Asfar sewage plant: preparing the site, apply leveling of site, remove the old building and build the offices and required utilities(patch plant, bridges to facilitate access to site .
10- Period May 1988 - Dec. 1990.
site engineer at Sheben El koum sewage project, : (ELNSR for building and constructions)
Sheben El-koum sewage plant : fence of the project consists of brick wall with repeated unit 13.25 ms, Earth moving, supervising and Construction of inlet structure, grit removal, 4 primary settling tanks and their distributor unit, 4 high trickling tank and their distributor unit, 2 concentration tanks, drying beds, and the internal roads .

Éducation

Master, civil engineering -structural department
  • à Faculty of Engineering -Menoufiya University, Egypt, 2005.
  • mars 2005

M.Sc. thesis supervised by: Prof. Dr. Abdul-Fattah Yousef (Professors of Geotechnical Engineering-Faculty of Engineering-Menufyia University) and Dr. Basuony El-Garhy (Associated Professors of Geotechnical Engineering-Faculty of Engineering- Menufyia University). • During my work towards my M.Sc. Degree from October 1998 to 2005, I passed successfully seven graduate courses (Advanced Steel structure, theory of plasticity, Finite element analysis, advanced testing of products and Structures, Special reinforced concrete structures, Underground structures, and Advanced Soil mechanics. • I carried out a thesis entitled “Settlement Analysis of Free-Standing Piled Raft Foundations".

Baccalauréat, Civil Engineering
  • à Engineering College-Alexandria UNI.
  • juin 1985

i have general civil engineering from Alexandria university and the project in marine port engineering .

Specialties & Skills

Construction Methods
Engineering Drawings
Construction Drawings
On site Support
Civil Engineering
construction and site managements
TEKLA -Structural detailing program

Langues

Anglais
Moyen
Arabe
Expert

Adhésions

EGYPTIAN Engineering syndicate of Civil Engineers
  • • Member of EGYPTIAN Engineering syndicate of Civil Engineers
  • July 1985
SAUDI COUNCIL OF ENGINEERING
  • 114802 - Consultant
  • February 2013

Formation et Diplômes

Diploma of Buissness Adminstraiton , Faculty of commerce, Tanta University, Egypt, 2006. (Certificat)
Date de la formation:
September 2006
Valide jusqu'à:
September 2020
CONTRACT MANAGEMENT - FIDIC (Formation)
Institut de formation:
HRPCentre- Human Resource Professional Training Centre
Date de la formation:
January 2016
Durée:
30 heures
Training Program of LEED MODULE (Formation)
Institut de formation:
Saudi Oger -Centeral Region
Date de la formation:
November 2014
Durée:
8 heures
SCAFOLDING SAFETY COURSE 29 CFR 1926.450 OSHA (Formation)
Institut de formation:
SIAC -INdusterial Construction &Engineering
Date de la formation:
December 2007
Durée:
8 heures
Tekla Structure -V15.00 (Formation)
Institut de formation:
Advnced Training
Date de la formation:
December 2009
Durée:
42 heures
\Tekla structure -V15.00 Steel Basic Training (Formation)
Institut de formation:
Tekla
Date de la formation:
November 2009
Durée:
42 heures
Ready to PMP exam (Certificat)
Date de la formation:
January 2010
Valide jusqu'à:
March 2010

Loisirs

  • Reading :travelling