sajimon kabeer,

sajimon kabeer

KTC International LLC

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Civil Engineering
Experience
26 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 5 Months

at KTC International LLC
  • United Arab Emirates
  • My current job since January 2015
Cad Draughtsman at KTC International
  • United Arab Emirates
  • My current job since January 2015
Consultant at De Leuw Cather International Ltd
  • United Arab Emirates
  • to February 2016

Contract No - 2014 Project: Internal Roads At The New Garbage Dump in Zafra And Solid
Waste Management Center
Client

Consulting Engineers at Lahmeyer International GmbH.
  • Germany
  • January 2006 to January 2015
Cad Draughtsman at Lahmeyer International GmbH
  • United Arab Emirates
  • January 2006 to January 2015

400kV OHL New Ruwais Grid Station to New Bab Grid Station Contract N12037 (KEC)
* 400/220/33kV Grid Station at Mirfa for IWPP Integration Contract N12304 (SIEMENS)
* 400kV OHL Works For SHAMKHA Grid Station Contract N7150 (ETA)
* New 400/132/33kV Grid Station at SHAMKHA Contract N7110 (SIEMENS)
* New 400/132/33kV Grid Station at MAHAWI Contract N6462A (SIEMENS)
* New 400/220kV Grid Station at RUWAIS Contract N7680 (HYUNDAI)
* Interconnection of ADCO/TRANSCO Power Networks 220kV GIS Extension at BAB Contract N7263
(SIEMENS)
* Supply and installation of 132/11kV substation in M12 Contract N7204.1A (ETA)
* Supply and installation of 132/11kV Sub Station in Presidential Palace Contract N7204.1D (ETA)
* Supply and installation of 132/22kV Sub Station in Al Falah Development. N7204.1E (ETA)
* Mafraq Workers City 220/33kV Mobile Substations N5812.2A Contract N5812.2A (Larsen & Toubro)
* New 400/132kV GIS AJMAN Grid Station Contract N6449 (ALSTOM GRID)
* ADNOC New Corporate Headquarters. Construction of Underground Car Park. Rerouting of Existing 132kV
Cable Circuits Contract N5961 (ARABTEC)
* New 220/33kV Grid Station at Ghantoot, Contact N2107
* New 400/132kV Grid Station at Bahia, Contract N-4611/A (TOSHIBA)
* Protection and Telecommunication for the 400kV Interconnection between TRANSCO TANE Substation and
EMAL Smelter complex Contract N12354 (SIEMENS)
* 400/132kV Grid Station at Reem Island, Contract N-4218 (ABB)
* Electrical Standards Drawings For Sultanate of OMAN
* 400/220 kV Grid Station at Medina Zayed, Contract N-2256T(TOSHIBA).
* Power Network Development works for Industrial city of Abu Dhabi (ICAD), Emirates Iron and Steel Factory
(EISF) and Private Emirates Steel New 220kV Substation Contract N4609 SIEMENS and Electro Mechanical
Consortium.
* Modification of 220kV GIS at Madinat Zayed Grid Station for SOLAR Plant Integration Contract N7056
(TOSHIBA)
* Power Network Development Works for YAS ISLAND 132/22kV Substation at YAS ISLAND Contract
N5797 (SIEMENS)
* REEM ISLAND Development 22kV Electrical Network for BUNYA.
* Three (3) New 132/22kV Primary Substations at AL Reem Island and Associated 132kV cable connections at Al
Reem Island Contract N4914 (ABB)
* Replacement of Distance protection relays/ BB&ABF with numerical relays for 132kV Substations Contract
N6325 (REMCON)
* New 400/132/22kV Grid Station at Al Reem Island Contract N4218.1 (ABB)
* New 11 Nos. 33/11kV Primary substations and Modification of Existing substations in the Easter Region of

Cad Draughtsman at Abu Dhabi General Transport Co. (G.T.C)
  • United Arab Emirates
  • January 2002 to January 2006

Valued for the following projects.
* Contract No - 987/1 Project: Breakwater Developments - Stage 2
Client

at General Transport Co. (G.T.C)
  • United Arab Emirates
  • January 2002 to January 2006
Project
  • to January 2005

Utility Relocations in Plot 104,

Draughtsman at New India Constructions
  • India
  • January 1997 to January 2001

as Site survey, Preparation of Layout, Set-outs for buildings, villas,
Draughtsman for civil works.
* Designing of Fencing, Gates, Compound walls, Ventilators and Wooden Flush
Doors for various private and puplic buildings.

Head at New India Constructions
  • India
  • January 1997 to January 2001

Major projects handled/under executions are: -
For Road works Prepare of as built drawing, shop drawing and sewer Line, Water Line, & Grading
Plan, Alignment drawing, Pavement marking & Signs Details Traffic Control Detail, Service
Reservation & Installation of 11kv & 33kv Overhead Transmission Lines, Underground Power &
Pilot Cables, Substation & Switchgears including Foundation of Street Lighting Preparing CCTC
Plan, fire Alarm. Preparing to As-Built Drawing in according to ADWEA ADDC GIS Standard
Procedure etc Ducts Plan Surface Finish, Seawall Railing, Median Railing, Stair Handrail, Layout
Plan, Typical Plan Elevation, Section & Details earth works, consultant and departments to approved
for drawing traffic signal layout plan details drawings & installation
Preparation of Tag list documents of all Utilities according to the instruction and Final rearrangement
of As built as per engineering procedure standards. Maintaining shop drawing logs, As built logs &
hard copy filling.
Tender Drawings for Grid Station, Substation & Overhead Transmission Lines, Layout & Sections
Elevation and Single line diagram, Cable route drawing Schematic diagram drawings works, Street
lighting & Road Works Construction, and Utility Relocation Preparing shop drawing and As Built
Drawings for 11kV & 33kV Cable & Over

Consultant at Al Torath Engineers
  • United Arab Emirates
  • January 2001 to January 2001
  • United Arab Emirates
  • to January 2001
Consultant at De Leuw Cather International Ltd
  • United Arab Emirates
  • to
Consultant at De Leuw Cather International Ltd
  • to
Cad Draughtsman at M/s. KTC INTERNATIONAL LLC
  • United Arab Emirates
  • to
Consultant at Dar AL-Handasah Consultants
  • Saudi Arabia
  • to
Consultant at Dar AL-Handasah Consultants
  • Saudi Arabia
  • to
Project at Construction of ground water control system @ jumeirah park
  • to
Consultant at Associated Consulting Engineers Int'l
  • to
Project at Palm jumeirah infrastructure for
  • to

, pjcrc35, pjcrc38 and pjtrh04

Project at Nakheel
  • United Arab Emirates
  • to

Supply & installation of way finding signage at JVC, JP & JVT
Client :

Education

Bachelor's degree, Civil Engineering
  • at Institute of engineering
  • September 2018

in

Specialties & Skills

CABLEADO
MICROSOFT WORKS
CUSTOMER RELATIONS
INGRES ABF
MECHANICAL
NETWORKING
SIEMENS NIXDORF HARDWARE
TELECOMMUNICATIONS
TOSHIBA

Languages

English
Expert
Hindi
Expert