Sajjad Hussain, MEP Project Manager

Sajjad Hussain

MEP Project Manager

Smart Climate Solution

Location
Pakistan - Lahore
Education
Bachelor's degree, B.Tech Honers (HVAC)
Experience
17 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 7 Months

MEP Project Manager at Smart Climate Solution
  • Pakistan - Lahore
  • My current job since March 2018

1- Successfully completed the execution of 1200 TR VRF System of an apartment building name is Nishat Apartments along with its ventilation, fresh air and exhaust air ducting.
2- Successfully completed the execution of 1000 TR VRF system of a shopping mall name is AMGOHC mall airport road along with its fresh air and exhaust air ducting.
3- Successfully completed the execution of 350 TE Dx AHU system of TCBP FMD (Training Center for biological production, foot mouth decease) Lab at UVAS university of veterinary and animal sciences Pattoki.
4- Now working at 5 No.s of execution projects of VRF system.
4-1. Style Textile Raiwind
4-2. Style Textile Manga
4-3. SAP P-III
4.4- SAP Cutting
4.5- SAP Knitting

HVAC Engineer at SIDE works
  • Pakistan - Lahore
  • January 2016 to August 2018

• HVAC System Design as per ANS/ASHRAE/IESNA/SMACNA Standards.
• Review the HVAC System Design as per LEED Requirements.
• Inspect the Execution of MEP Works on different projects according to LEED requirements.
• Study and prepare the LEED IEQ Credits documentation.
• Study and prepare the documentation for LEED EA Credits including Fundamental Commissioning, Enhance Commissioning, Fundamental Refrigerant Management, Enhance Refrigerant Management, Minimum Energy Performance, Optimize Energy Performance and Building Level Energy Metering.
• Fill out LEED forms and update its required data after preparing.
LEED Certified Projects:
1- British Council Library Lahore Pakistan.
(NC Gold Certified)
2- Citibank AWT Plaza Karachi Pakistan.
(NC Gold Certified)
3- Citibank Dolmen Horber Front Karachi.
(NC Gold Certified)
4- Sapphire Fibres Limited Denim Division. (NC Gold Certified)
5- Artistic AFGI K2 & K5 Karachi Pakistan
(O & M) Gold Certified.
6- World Bank Country Head Office Islamabad
Pakistan. (NC in process)
7- Sika Pakistan Ad-Mix Plant Lahore Pakistan. (NC Gold Certified)
8- NFL Corporate House Karachi Pakistan. (NC in process)
9- 11 West Apartment Lahore. (NC in process)
10- Interloop Socks Unit Faisalabad Pakistan.
(NC in Process)
11- Poineer Cement Head Office (Mega Tower) Lahore Pakistan. (NC in process)
12- IFC Office Islamabad Pakistan.
13- Chottani Industries Denim Unit 4 Karachi Pakistan. (NC in process)
14- Kassim Textile Karachi Pakistan. (NC in process)
15- Artistic Milliners 14 Karachi Pakistan.
(O & M in process)
16- Artistic Milliners 2 Karachi Pakistan.
(O & M in process)
Designed Projects:
• Sika Pakistan Ad-Mix Plant
• Arco Plastic Pakistan Sunder Industrial Estate.
• Harappa Solar Private Limited Pakistan.
• Asjad House
• Asad Ullah House

HVAC Engineer at Building Services Consultants
  • Pakistan - Lahore
  • January 2013 to December 2015

Key Responsibilities:

• Heating and Cooling Load Calculations of Project Building by Using HAP (Hourly Analysis Program)
• Prepare the complete HVAC drawings
• Prepare the complete tender documents
• Prepare the BOQ documents.
• Supervise the tender activities including tender floating to market and bidding activities etc…
• Supervise the HVAC execution works and resolve the technical issue in design side.

Design following projects during this period.

• MCB Bank Main Boulevard Gulberg.

• Partially design of Pakistan Institute of Space Technology Islamabad.

• FPCCI Building Islamabad.

HVAC Site Eningeer at Climate Control
  • Pakistan - Lahore
  • March 2012 to December 2012

Responsibilities:

• Responsible to obtain execution of following HVAC works for 1800 tons capacity compression system.

1- GI sheet metal ducting according to ASHRAE/SMACNA standards.
2- MS seamless piping works according to ASHRAE standards.
3- Plumbing works/drain works.
4- Chiller commissioning.
5- Cooling Tower commissioning.

6- Air Handling Units commissioning.

7- Electrification of all HVAC system including Main DB for Plant Room.

Exercises for Improvement

I study and initiate the use of different tools by adopting listed below exercises. These exercises results an enhancement in productivity at individual and at branch level.

• Start regular training, advising and guidance support to technicians in order to enhance their ability.

• Initiate discussion sessions with workforce for regular motivation AND to share Ideas, experiences and problems.
• Creates and makes revisions to project schedules including assigning tasks.

HVAC Site Engineer at Glacier Engineers
  • Pakistan - Lahore
  • March 2007 to April 2011

Responsibilities:

• Responsible to manage scheduling, organizing, job assigning and dispatching field workforce.

• Responsible to prepare BOQ’s for different HVAC projects according to drawings and execute them according to ASHRAE standards.(American Society of Heating Refrigeration and Air-Conditioning Engineers)

• Arrange the technical teams for different HVAC projects and appoint them according to their technical

skills and capabilities.

• Responsible for completion of different HVAC projects in time and in cast.

• Responsible to obtain quality of work from labor through my instructions given to site supervisor.

• Responsible to pre-check work quality before final testing according to ASHRAE/SMACNA standards.

• Responsible for smooth project execution without disturbing other services by good and timely communication with consultant client and other contractors.
• Successful project handing over to client according to contract rules.

• Responsible to maintain quality standards by supervising assigned staff to project/jobs and inspecting job sites.

• Responsible to maintain customer satisfaction by investigating concerns, implementing corrective action, and communicating with customers and assigned staff.

• Responsible to manage the assigned project/jobs within the time and cost limit. And cost analyses for each project/job in order to increase gross profit margin.

• Responsible for all documentation/correspondence with customer, branch manager, personnel and other departments and/or sections.

• Responsible to conducts performance appraisals in concert with service supervisory personnel to recommend raises promotions, training, and disciplinary actions.

HVAC Site Engineer at Habib Ullah & Associates
  • Pakistan - Lahore
  • January 2006 to March 2007

Responsibilities:

• Responsible for smooth Operation and Maintenance of all HVAC system installed at site.

• Strong Command on O & M management according to ASHRAE Operation & Maintenance standards like ASHRAE 0 Guidelines & ASHRAE 32 etc... and carryout all operation maintenance works as per ANSI/ASHRAE/ACCA Standard (Practices for Inspection and Maintenance of Commercial Building HVAC Systems)


• Responsible for conducting operation on daily basis, and maintenance on yearly basis to achieve following benefits.

1- Save energy & water costs Compliance with Government Policies
2- Enhance building performance
3- Attain sustainability goals
4- Improved occupant comfort
5- Retain asset value
6- Achieve job satisfaction
7- Increase profitability
8- Add value to maintenance contracts
9- Win repeat business or extend contracts Better working relationships
10- New training opportunities

Education

Bachelor's degree, B.Tech Honers (HVAC)
  • at NCBA & E University Lahore Pakistan.
  • May 2017

I have qualified my B. Tech (Honors) in Refrigeration and Air Conditioning Technology from NCBA & E University LCU Campus Lahore Pakistan and obtain 3.19 CGPA.

Specialties & Skills

Micro Soft Office Word, Excel and Power Point
McQuay Pipe Sizing Software
McQuay Duct Sizing Software
HAP (Hourly Analysis Program) for Cooling Load Calculations
Autocad
Plain swift Quantity takeoff
Dialux Lighting Design

Languages

English
Intermediate
Urdu
Native Speaker
Punjabi
Native Speaker

Memberships

Pakistan HVAC & R Society
  • Lifetime Member
  • January 2013

Training and Certifications

Energy Audit Training (Training)
Training Institute:
Energy Audit Training
Date Attended:
March 2017
Duration:
240 hours
LEED AP BD+C Preparatory Course(20-21 August 2016) (Training)
Training Institute:
LEED AP BD+C Preparatory Course
Date Attended:
August 2017
Duration:
16 hours
Duct System Design (Dated 11th March, 2017) (Training)
Training Institute:
Duct System Design
Date Attended:
March 2017
Duration:
2 hours