Project H&S Engineer
Reclamation Project
Total years of experience :25 years, 5 Months
Monitoring and guiding Staff and contractors on day-to-day safety related activities.
Witness all the high risk activities briefing and provide input where necessary
Review all submitted risk assessment and work method of statement
Lead the Training Department for Marine, Land and Reclamation according to the law.
Delegation of HSE Personnel movement.
Advisor to Project Management and Contractor HSE Committee
Reason for Leaving - Assignment Completed - Contract Basis
• Lead by example and ensure that the Company’s HSE Policies and Procedure are implemented and adhere to in all phases of the work
• In liaison with other relevant HSE Groups within the Company, ensure that relevant corporate guidelines, procedure and systems are adhered to.
• Participate in developing and maintaining the HSE Management/Activity, Plan, HSE Strategies and other project documents necessary for the project HSE work processes.
• Play a central role in building and maintaining a strong HSE Commitment and Culture within the Lanxess Project/Operation and Commissioning Team.
• Participate in review and acceptance of JSA/Construction Method of Statement submittals.
• Initiate Safety Initiatives and Work processes.
• Application of Lanxess Formula X and Behavioural Safety Observations and reporting. Build a Culture for Proactive reporting at Work sites.
• Provide Project Director/Senior Construction Manager and Project Team Members with guidance within the field of Site HSE
Reason for Leaving - Assignment Completed after Mechanical Completion Handover.
Safely delivers the Project completion at the end of 2010 till first production in June 2011 with a significant achievement over 100 million hours worked without a single lost time injury (LTI) for both train and an overall LTI frequency of 0.04 LTI/million man-hours corresponding to about 1/10th of the industry average.
Review daily PTSW submission in Shift Control Room and guiding the effectiveness on the implementation to both trains.
Advisor to the CSU Operation team on HSE related matters to ensure flawless delivery and successful start-up.
Coordinate with the Management and Engineering team on HAZOP, HAZID and other safety study.
Involve in HSE panel review on CSU Safe Operating Procedure.
Safely completing 273 blow-packs for QSGTL HP/MP/LP Steam-blow Inspection as per SIOPE.
Chair the Pre-Incident Planning and Emergency Evacuation for the Operational Staff on Fire Safety Advisory matter with the On-Scene Commander.
Developing strategies to address identified areas of non-compliance with current regulations regarding process safety management;
Coordinating the activities of multi-disciplined teams for conducting process hazards analysis, participating in incident investigations, safety management systems review and upgrade;
Having experienced in commissioning of plant from construction stage until product to storage on HSE perspectives;
Leading the line, network, system walk down and handover packages before acceptance with Operation and Engineering Team and providing comment for any deviation;
Monitoring hydro testing and flushing of line work;
Supervising loading of trays and packing into columns;
Monitoring and advice Contractor personnel pertaining to HSE matter during catalyst change;
Being involved in chemical washing of lines and decontamination of vessels;
Reason for Leaving - Assignment Completed (Certificate of Appreciation Available)
Estate Civil, Building and Facilities Management) - AGST/AGSI
Successfully lead and guide the lifting and laying of the concrete ramp replacement to RO-RO ramp jetty.
Successfully solved (6 years stagnant issue) the underground chemical bottle washing laboratory leaking pipeline.
Delivering Shell 12 Life-Saving Rules transition from Cardinal Rules to all contractor and tenants within my area of custodian
Effectively implement, manage, control and issuing of all Permit-To-Work application and submission under my area of custodianship
Advisor to Departmental HSSE issues
Conduct, verified and approved gas freed vessels for entry;
Verification, guidance, control on Risk Assessment, Management, and Work Method of Statement
Carry out routine impromptu inspection on Facilities and building structural condition
Providing a feedback to Civil/Structural (Marine-Jetty, Pontoon, Submersible platform) in relating to HSSE issue.
Guide and advice maintenance contractor on work method/sequence.
Reason for Leaving - Relocated for Overseas Assignment (Testimonial Available
Coordinate all safety aspect at Site.
Bukom Refinery and Modification Project
Head and lead the Project HSE team
Assign area of responsibility to individual HSE Supervisor/Coordinator
Resolving any dispute on HSE matter within the project team
Implementation of HSE Standard in correlation to Shell HSSE Rules and Regulations
Organizing monthly Safety Promotion for Project HSE
Control and guiding the Safe Work practices during boring of non-displacement pile
Minimizing Noise Exposure during phase of work activities
Guiding the Project team on Risk Assessment and Work Method of Statement
Trained and guide workers on usage of 4 in 1 portable H2S detector
Control and educate Piling Rig operator on Safe Work procedure
Provide overall direction to the Engineering and Procurement team to meet the safe working standards.
Ensure Engineering and Procurement is in accordance with Operations and the statutory requirements.
Responsible for monitoring and controlling contractor’s work force and productivity levels to meet budget and schedule requirements safely.
Sembawang Marine - ERHA FPSO Conversion Project
Scope of Work : Administrate safe work practices and conduct workforce safety training
Client : Sembawang Marine Offshore and Engineering
Petrochemical Corporation of Singapore - Maintenance
Scope of Work : Administrate safe work practices, conduct workforce safety training and
acting as an advisor pertaining to Job Safety Analysis on Critical Work Method
Client : Petrochemical Corporation of Singapore
ExxonMobil Refinery - Boiler and Control System Modernization Project (FWEPL)
Scope of Work : Administrate safe work practices and workforce safety training
Client
Coordinate and liaise with owner representatives on safety administration and operation. Setting up and maintaining the Safety Management System-VSCC.
Representing the Company in VSCC meeting and PTW Coordination
Impromptu inspection to all activities onboard of vessel.
To manage all the activities pertaining to the usage of high risk work.
Reason for Leaving - Project Completed
Head the HSE department on all the general and specific site activities.
Preparation of all necessary documentation, which is required by the statute on the safe work practices.
Act as an advisor in preparation of high-risk activities for the project team.
Coordinate and liaise with owner representatives on Safety related matters.
Control and Manage all the Field HSE Personnel delegated in the project.
Reason for Leaving - Project Completed (Testimonial Available
Maintenance
Lead the HSE department.
Preparation of all necessary documentation, which is required by the statute on the safe work practices.
Act as an advisor in preparation of high-risk activities during Shut-Down Maintenance.
Setting up and maintaining the Safety Management System for SCC.
Lead and conduct daily site safety inspection.
Controlling all the company work activities during shutdown maintenance that is related to Safety issues,
Control and Manage all the Field HSE Personnel delegated in the project
Reason for Leaving
Daily inspection and monitoring of all the contractor activities.
Assisting the OMT on JSA endorsement for Contractor PTW application
Lead a group of Contractor Supervisor and HSE Personnel on HSE Inspection,
Daily compilation of the entire unit permits application system.
Assist the operation in delivering a Safe Startup.
Reason for Leaving - Plant System Start-up completed
Coordination with site personnel on the daily execution
Coordinate and liaise with owner representatives on daily work execution
Conducting a daily TSTI to all site personnel before executing task in the fields
Supervision of contractors work on Architectural finishing (Major in Furniture Installation)
Submission of explanatory statement on deviation report issue
Act as a Fire Warden during fire drill exercise
Reason for Leaving
Assist the Project Manager in daily task execution.
Liaised and coordinate with resident contractor
Control and Monitor sub-contractor and supplier work and delivery schedule.
Supervision of steel and formwork fabrication, installation and concreting of pipe support, sleepers, and other structural items.
Assisting the General Manager in day to day site operation
Clearing stripped formwork from every building level
Managing 10 General workers in daily task execution
Allocating/arrangement of Site logistic.
Reason for Leaving - Project Completed
Execution of task relating to inspection of precast concrete component. (E.g. Façade Wall, Gable End Wall, Canopy, Sun breaker, RC Chute etc.)
Responsibilities include quality assurance on product quality and standards are maintained and achievable.
Pre-inspection on structural and architectural component layout as per drawing and specification.
Monitoring and supervision during the concreting process.
Final inspection on the finishing of the precast component before deliver to site.
Reason for Leaving - Plant Close-down
Assisting the Lieutenant in supervising all the National Servicemen at Worksite.
Construction Brigade
General Construction Work
Supervised Field Training
In-Centre Training - Multi Trade -