Area Superintendent
Almeer technical services Equate
Total years of experience :11 years, 3 Months
Co-coordinating and arranging all the Pre TA Requirement and Post TA activities for the contractors as per the Job Scope.
Preparation and monitoring of work schedule as per list of deliverables.
Reconciliation of Piping Material including field Measurement of worksHanding over of Spare & Surplus Material and Correlation with client.
Execution of projects right from conception stage till handing over in a professional and systematic manner.
We shall also prepare erection procedures for submission/approval to Customer and for implementations by sub-contractors for important activities.
In charge for Seawater internal and external repair works
Repairing of joints and surface inside and outside of pipe by using Lamination, Glass flakes and clock spring materials
Repairing of more than 500 lamination Joints.
Rahablitation and Replacement of seawater line approximately 1800meters length
Rehabilitation and Replacement of Seawater line
• In-charge for erection and site installation of piping of various materials (i.e., CS, AS, SS and RTRP lines).
• Review of GAD, P&ID and Piping isometric drawings
• Supervising and providing necessary technical support for contractors in equipment installation.
• Co-ordinate and providing necessary support for contractors in execution of hot-tapping activities.
• Co-coordinating with shop for piping fabrication and timely release spools for site installation.
• Review hydro test package and conducting walk-down inspection for all the completed construction activities.
• Execution of hydro-testing for all the piping and equipment’s.
• Monitoring sub-contractors progress and updating.
• Coordinating with field design team for field changes.
• Co-ordinate with KNPC operations in obtaining necessary approvals for construction activities in the operating units.
• Co-ordinate with all servicing division (i.e., Scaffolding, NDT, Inspection, Insulation, Blasting and Painting) for the timely completion of project activities
• Reviewing work procedure for Quality content.
• Review of ITP as per the working procedure.
• Reviewing and updating project requisition and other quality content.
• Following the inspection as per the standard like ASME, API, EN and countries codes which are applicable.
• Raising NCR wherever required as per quality requirement.
• Controlling processing or delivery of non-conforming product until the deficiency is corrected.
• Compiling Quality records and Quality plan required for As-built drawing
• Managing incoming, in process and final inspection.
• Organizing and conduction quality Awareness training for employees.
• Preparing test packages and MCP for walk down.
• Witnessing of pressure testing, holiday test and other kinds of as required.
• Participating with the Client activities as to ensure smooth flow of work.
• Working as a Piping execution engineer to expedite the piping execution, Prefabrication and Erection of Piping in Process.
• Following & studying of GAD's, Isometrics & P & ID's in the process Area.
• Preparation and monitoring of work schedule as per list of deliverables.
• Involvement of Painting, Insulation & Hydro testing of Piping Loops as per Standards, Pre-commissioning Activities of Pigging, Flushing of Piping Systems & Charging of Utilities.
• Reconciliation of Piping Material including field Measurement of works
Handing over of Spare & Surplus Material and Correlation with client.
• Execution of projects right from conception stage till handing over in a professional and systematic manner.
• Invoicing/sub-contractor invoice clearing.
• We shall also prepare erection procedures for submission/approval to Customer and for implementations by sub-contractors for important activities.
• Providing redesign solutions for the field problems or changes (mismatching) ensuring with the client regarding the same
• Ensuring implementation and adherence as per project specification and procedure.
• Responsible for monitoring piping construction and fabrication activities and ensuring quality.
• Witnessing all field tests including hydro test (HT).
• Involved in the preparation of work packages, job cards, work schedules, Manpower and equipment schedules.
• Piping Supervisor for KNPC Gas Plant Train -4 Project.
In-charge for Erection. Shop fabrication and Site installation of above and underground Piping of various materials and equipment’s, valves etc. (i.e., CS, AS, SS and RTRP lines).
• Review of GAD, P&ID and Piping isometric drawings and checking with respect to site condition.
• In charge of Sea Water Line, Firefighting Line, Cement lined pipes for LPG Train-4
• Supervising and providing necessary technical support for contractors in Piping equipment installation and providing necessary support for contractors in execution of hot-tapping activities.
• Coordinating with shop for piping fabrication and timely release spools for site installation, Following Blasting, Painting and Cement lining.
• In charge of cement Lining Pipe Repairing
• Review hydro test package and conducting walk-down inspection for all the completed Construction activities and hydro-testing for all the piping and equipment’s
• Coordinating with field design team for field changes and preparing as built drawing
• Co-ordinate with KNPC operations in obtaining necessary approvals for construction activities in operating units and with all servicing division (i.e., Scaffolding, NDT, Inspection, Insulation,
• Blasting and Painting for the timely completion of project activities
• Following safe practice as per clients requirement to maximize production with minimum risk Coordinate with other departments/sub-contractors such as the Electrical & Instrumentation to be able to incorporate relevant information that will affect the implementation of the project schedule.
Working as Piping Engineer//Mechanical Engineer.
• Execution of dome shaped Tanks and required piping System for re refining of lubrication oil.
• Assigned to QAQC team initially for preparing reports on Tank fabrication, Welding, Piping & Structures and at the same time taking care of Engineering Coordination & Construction.
• Prepare overall progress report for Piping, Structural & Mechanical works and reporting name to higher official.
• Planning, organizing and directing the technical aspects of all types of Tanks Construction and Piping works.
• Responsible for verification of all materials for plant drawings before it will be released for Construction.
• Coordinating & supervising construction and installation works in the area of Structural, Piping & Mechanical and modification of the existing facilities operated by contractor.
• Responsible in assuring all the pipe line systems in accordance to its specifications, correct routing of the pipe according to its isometric drawings & P&ID and all structural supports for all pipe line system packages.
• Prepared as built drawings for modification and obstructed pipe spools
• Evaluation and analysis of current project status and schedule based on progress
Update against the baseline schedule.
• Involved in the preparation of work packages, job cards, work schedules, Manpower and equipment schedules.
• Managed & maintained construction schedule regularly by affecting actual site progress and conditions.
• Carrying out Hydro-Test for the Tanks as well as Pipes, witnessed sand blasting and painting of the tanks
• Responsible for tie in Points location, Heat Exchangers, Vessels, Drums, Valves.
• Scheduling daily activities with Superior in co-ordination with Planning team
In accordance to achieve the required target with the effective workforce and updating the same to the department superiors.
• Ensuring Safety of the worker as well as equipment before start of the work.
Mechanical engineering