Senior Surveyor Engineer
Dar Al-handasah ( Shair and Partners )
Total years of experience :13 years, 2 Months
Responsibilities
Participated in the confirmation of all details, sections of buildings and civil works, coordination with the Contractor to reduce problems in the work, preparation / review of drawings of survey work, verification of stakeout and monitoring of the positioning of all structures; monitoring of topographic measurements, resolution of issues related to the definition of perimeters and staking of foundations, monitoring of soil formations, verification of alignments and accurate leveling, verification of the location of infrastructure networks; etc., for the following projects:
- Integrated Infrastructure Project of Caxito - 1st Phase, Angola. Project execution, tender documents and inspection of the construction of all infrastructures related to the Via de Cintura do Caxito, including drainage of rainwater.
- Electrification Works and 30, 000 Domestic Connections in the City of Huambo, Angola. Project review and supervision of the construction of 15 km of 60 kV lines of single and double circuits, including two new 60 kV / 30 kV and one 60 kV / 15 kV substations and expansion of an existing substation of 60 kV / 15 kV, in addition to 40 km of 30 kV and 15 kV distribution lines, 100 compact and pole mounted MT / BT distribution substations, 100 km of BT overhead lines, 30, 000 final service links and road lighting systems.
- 400 kV Lauca - Huambo Transmission Line and Associated Substation, Angola. Project revision and approval and supervision of the supply and installation work of the Lauco-Waco Kungo transmission lines of 400 kV single circuit with 3 conductors per phase (202 km) and single circuit Waco Kungo-Belém do Dango with 3 conductors per phase (196 km); and the substations of Waco Kungo 400/220, Belém do Dango 400/220/60 kV and Laúca 400kV, including testimony of acceptance tests of the manufacturer, final tests and commissioning of the systems and delivery of the Project to the Owner of the Work.
- Construction of the Associated Lines of the Soyo Combined Cycle Power Plant, Region of Luanda, Angola. Review and approval of construction design and supervision for the supply and installation of 315 km of 400 kV, 220 kV and 60 kV transmission lines in addition to the expansion of the 400 kV / 220 kV / 60 kV Viana substations, construction of three conventional 60 kV / 30 kV substations in Catete, Bom Jesus and ZEE.
-Zango Housing and Infrastructure Project, Angola. Inspection of the contract for the construction of all utilities infrastructure on 500 ha land, including a waste water treatment plant.
. I worked on the development project for the City - Yacht Club Building, Zaituna Bay, in Beirut. The scope covered several concrete works and finishes. Responsible for the preparation of material orders and quantity maps, monitoring the execution of survey activities, monitoring the execution of final screens, controlling quantities, and performing surveying activities
• Field and Quantity Surveyor Engineer in “Upgrading of Hazmieh Saofar International Road Section-3”
• Field surveyor Engineer in “Beautification of Bhamdoun Old Road”
project about “Lebanese Coastal Vulnerability Assessment using G.I.S.” N.B: The Final Project was done in common with “Directorate Geographic Affairs”(D.A.G.)