lead Auditor
Total years of experience :57 years, 9 Months
QMS 9001:2008, for Public sector (Ministries of - Interior, Finance,
Labour, Commerce, CIO, BDF Hospital, Technical Lab of Royal Naval
Force, Justice, Civil Defense & GOYS).
* QMS Audit 9001:2008, for private Sector ( Alba, YBA Kanno, Bapco &
Nass Group).
looking after daily inspections and reviewing
issued inspection reports and give approval plus direct involvement in
inspection.
Major Clients under my responsibility
1- Aluminum Bahrain Company (Alba)
2- Arab Shipping
Supervising activities of surveyors by direct & indirect methods.
Performs.
* supervisory duties and maintains company standards at the level
* established by management for the position
* Reviewing incoming project / Training requests daily with Operation.
* Manager and send proposals and schedules work on a daily basis.
* Reporting top management, complete details on day to day jobs.
* Executing various quality control related works of projects. Anticipating
* problems & giving solutions to other surveyors to overcome them.
* Working with Projects, operating staff and other Company personnel, as
necessary on work carried out by contractors on operational facilities.
* Estimating job requirement, preparing field instructions to complete the
job in a scheduled time period.
* Having long experience in the field of quality & training, capable of
taking
* Conducting in-house awareness frequently for surveyors.
* Coordinating with other branch offices for worldwide inspections.
* Preparing yearly Budget & forecasts. Analyzing periodically based on
Performances. Preparing monthly statements to managements.
* Taking initiation in marketing, maintaining continues flow of jobs to the
surveyors.
* Invoicing, delivery & follow ups for payments by clients.
* Follow up on frequent basis with client to know any slack in services
Provided, thereby enhancing the quality of service.
Conducting Technical training of Riggers, crane
operators, forklift operators, hiab operators, tower crane operators &
mobile crane operators.
assigned to HHI (
assigned to USCO industry for statutory
inspection of lifting / pressure equipment.
assigned to GIIC line 2 project for statutory
inspection of lifting / pressure equipment.
assigned to GARMCO for statutory inspection
of overhead cranes, Boiler, pressure vessels and loose lifting gears.
looking after
assigned for ASRY & GIIC as approved
assigned to Al Ezzel power plant project for
statutory inspection of lifting equipment and Boiler HRSG (heat
recovery steam generation).
attended on site training in
assigned to C.I.C.C - Bapco expansion project
(Diesel Low Sulfur) for statutory inspection of mobile cranes, tower
crane, loose lifting gears, pressure vessels and overhead cranes.
assigned to WTC (world trade center) for
statutory inspection of tower cranes, elevating platform (cradle),
passenger / material lifts and loose lifting gears.
* Jan2006: promoted to senior surveyor in IVS section
in
assigned in IVS section as junior industrial
I was working under probation period in IVS
section (In-Service Verification Services), I was assisting the senior
surveyor in daily in section activities for lifting equipment and pressure
vessel.
Ramsis Engineering is one of the major Mechanical & Maintenance contractor in the
Kingdom basically they are specialized in design and manufacturing high / low
pressure vessels and heat exchanger as well as they are doing overhaul maintenance
of industries during outage and shutdown.
SAMER AWAD
Job Responsibilities were deputed to me in Ramsis Engineering
assigned to up date all
for Bachtel project
manufacturing 4 nos. Stack columns (chimney) for Alba power station
no. 4 (line 5). I was responsible of the following inspection activities :
- Inspection of received materials as per MDR as well as approved
ITP (inspection test plan).
- In process Inspection in line with the third party inspector.
SAMER AWAD
- Inspection of all welding joints and reviewing only NDT reports if
applicable.
- Checking the ovality of columns sections.
- Final & dimensional inspection in presence of the third party
inspector.
- Issue the final release note.
- Preparing the final dossier of the equipment with final dispatch list.
the company has assigned me as
assisting the inspection team in all activities as Visual /
Dimensional inspection of pressure vessel and heat exchanger during
manufacturing process and after completion according to approved
drawings, welding inspection according to applicable standard,
preparing the weld maps and preparing inspections reports according to
the approved procedures and standard.
I was under probation period in
courses: Welding Inspector (Certificate of Proficiency CSWIP 3.1) - TWI o