SAMER HEBIESH, MEP Manager

SAMER HEBIESH

MEP Manager

ORASCOM Construction

Location
Egypt - Cairo
Education
Bachelor's degree, Engineering
Experience
25 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 6 Months

MEP Manager at ORASCOM Construction
  • Egypt - Cairo
  • My current job since November 2019

Bow and Arrow Building
Manual Shooting Building
Electronic Shooting Building
Consultant: Sabbour Consultancy
Description
Responsible about all electromechanically installation on site

Electrical Manager at ORASCOM Construction
  • Egypt - Hurghada
  • May 2019 to November 2019

Description
•Review design drawing.
•Preparing shop drawing for interior and Low current, L.V and M.V networks
•Site supervision.
•In charge of the installation of all Electrical installation on site.
•Review “Inspection and Test Plan” ITP and Method of statement before submitted to (SHAKER).
•In charge of Turn over the complete electric work to consultant (SHAKER).
•Coordinate between mechanical and electrical work.

Construction Manager at Orascom Construction Limited - Other Locations
  • Egypt - Damietta
  • July 2017 to May 2019

West Damietta Combined Cycle Add-On Power Plant.
Description
• Site supervision.
• In charge of the installation of all Electrical installation on site

Testing And Commissioning Manager at ORASCOM SAUDI Company
  • Saudi Arabia - Jeddah
  • July 2014 to June 2017

New King Abdul Aziz International Airport
Description
• Prepare testing and commissioning Plan.
• Prepare testing and commissioning MST (Method of Statement)
• Handover submittals of O&M Manual, Training Program, FAT test to Dar El-handasah for approval
• Plan and implement the procedure and methodology to carry out and review all functional performance tests, critical system checks, and Integrated system test with staff and recommends way forward to the team.
• Coordinate the Testing and Commissioning at site, conduct and record all meetings to address any technical issues.
• Prepare any modification and/or additions to the “Inspection and Test Plan” ITP
• Prepare Non-Conformance Reports (NCR’s) and Corrective Action Report (CAR)
• Prepare internal auditing program including follow-up audits and schedule of audits.
• Provide on-site quality control inspection staff in order to ensure that work can be implemented on a continuous basis within strict compliance of clients “Dar El-handasah” quality requirements.

Chief quality control (Electrical) at ORASCOM SAUDI Company
  • Saudi Arabia - Jeddah
  • October 2012 to June 2014

New King Abdul Aziz International Airport
Project Facilities
• Medium & Low Voltage Networks - MV Network - Distribution Network Plan (included MV Switchgear and transformer. L.V switchgear, MCC and Panel)
• Outdoor Lighting Installation
• Utility Tunnels
• Arterial 4, Tunnel 1 and Arterial 1, Tunnels 2 & 3
• Nursery Facility
• Airside/ Landside Gatehouse Facilities
• Grey Water and Irrigation Networks
• Sewage Collection System Including Pumping Facilities
• Chilled water piping system
Description
• In charge of the installation of all Electrical installation on site
• Review the electric shop drawing
• In charge of Turn over the complete electric work to consultant (Dar El-handasah)
• Coordinate the mechanical and electrical work between consultants and sites
• Intend all meeting related to electrical and mechanical work
• Preparing MST Method of statement, ITP Inspection test Plan and Material submittal (MTS)

Head of Electromechanical sector at Orascom Housing Communities company
  • Egypt - Cairo
  • January 2011 to October 2012

Project Facilities
 Harem City Project (60 thousands flat compound)
 Harem Life Project (20 thousands flat compound)
 Qena Garden Project (5 thousands flat compound)
Description
 Review design drawing and shop drawing for all Low current, L.V and M.V networks
 Follow up the electric design with electric consultants
 Follow up the mechanical work with mechanical consultants.
 Attend all Electrical and mechanical meeting to solve the site problems
 Coordinate the mechanical and electrical work between consultants and sites
 Follow up the task work for electrical and mechanical engineers in electromechanical department

Electrical Project Engineer at NGI Nassar Group International Afghanistan for Contracting
  • Afghanistan
  • August 2009 to December 2010

Project Facilities
ANA GARRISON Paktika, Khair Kot, Afghanistan (U.S. Army Corps of engineer’s) Afghani and US army Camp
Description
•Prepare shop drawing for 12 MVA Diesel Power Plant and supervise on installation for each parts of it
•Prepare shop drawing for waste water treatment and follow up the installation on site
•Review all the electrical material Submittal before sent it to Client (U.S. Army Corps of engineer’s) then follow it until get approval
•Attend all meeting with U.S. Army Corps of engineer’s
•Follow up the interior electrical installation on more than 150 buildings
•Prepare shop drawing for all low voltage network including base of transformers
•Follow up the installation of low voltage networks, transformers and medium voltage network including M.V cable splice and termination to transformer and switchgear.

Electrical Project Engineer at Louis Berger Group-Black& Veatch JV
  • Afghanistan
  • August 2008 to August 2009

project was controlling the entire substation and power station for all over Afghanistan to gather by using SCADA system and adding reactive power compensation to improve the High voltage network
•Visiting most of Afghanistan substation and power station to collect the required data for SCADA system
•Visit and review most of the high voltage transmission line to decide adding OPC (optical fiber cable)
•Preparing all the related document for RFP (Request for proposal)
•Review all the related document for RFP (Request for proposal)
•Evaluate Bid
•Prepare the work Schedule
•Review the contractor Schedule

Electrical Project Engineer at Archirodon Construction (Overseas) CO.S.A
  • Egypt - Damietta
  • July 2007 to August 2008

Project Facilities
New Container Termination, Damietta Port, Egypt
Description
•Attended all the meeting with owner Kuwait United Development DMJM HARRIS/AECOM
•Review design drawing for all the M.V network for 15KVA terminal Crane
•Review design drawing for all L.V network and building.
•Prepare work shop drawing for M.V, L.V and L.C
•Review the Electric material Submittal and follow it until get approval from consultant
•Follow up installation work on site

Electrical Project Engineer at Shaw International, Ltd
  • Afghanistan
  • December 2006 to July 2007

Project Facilities
(JAF) Joint Aviation Facility, Hangar and parking apron in Kabul-Afghanistan
Description
•Attended all the meeting with U.S. Army Corps of Engineers, Afghanistan Engineer District
•Prepare shop drawing for 3.75 MVA Diesel Power Plant and supervise on installation for each parts of it
•Prepare AC and DC system shop drawing for aircraft maintenance hanger
•Prepare all the submital for AC and DC equipment for aircraft maintenance hangar, then follow up until get approval from U.S. Army Corps of Engineers
•Follow up all the installation on site
•Install all the earthing bit for aircraft in apron
•Turn over the Power plant, aircraft hangar and apron area to U.S. Army Corps of Engineers, Afghanistan Engineer District

Senior Electrical Engineer at Contrack International Inc.
  • Afghanistan
  • April 2005 to December 2006

Project Facilities
•Ana Regional Brigade in Heart-Afghanistan
•Ana Regional Brigade Facilities in Lashkar Gah-Afghanistan
Description
•Prepare shop drawing for 5 MVA Diesel Power Plant and supervise on installation for each parts of it
•Installed a 15KV overhead transmission line
•Attend all meeting with U.S. Army Corps of engineer’s
•Follow up the interior electrical installation on more than 150 buildings
•Prepare shop drawing for all low voltage network including oil transformers
•Follow up the installation of low voltage networks and transformers
•Follow up installation of medium voltage network including M.V cable splice and termination to transformer and switchgear.
•Prepare AS-Built Drawing.

Senior Electrical Engineer at Setelcom
  • Egypt - Cairo
  • April 2004 to April 2005

Project Facilities
 Golden Pyramids Plaza Spinnesy’s Project in City Stars Egypt
 Health Club for Intercontinental Hotel Project
Description
 Attend all meeting with Spinnesy’s owner
 Follow up installation for LV system and Equipment erection
 Quantity surveying & As Built Execution
 Follow up the invoice

Electrical design Engineer at Integrated Consulting Group
  • Egypt - Cairo
  • September 2003 to March 2004

the interior (L.V&L.C)
•Design the Distribution panel
•Review the work shop drawing for approval
•Follow up the erection in site
•Follow up the invoice

Site Manager at SALO MHDA
  • Algeria - Algiers
  • January 2003 to June 2003

Project Facilities
 Overhead Transmission Line in Algeria (400KV)- Algeria
Description
 Attend all meeting with Enelpower (Italian Company)
 Lead two team, first team including 45 technician installation the overhead tower and second team 60 technician for pulling the overhead MV cables
 Take measuring for some missing parts and follow up the fabrication with specialized factory
 Supervise all the installation of tower and stringing of the conductor
 Supervise all the installation of O.P.G.W Wire

Electric Site Manager at MHDA General and Industrial Contracting
  • Egypt - Port Said
  • September 2001 to December 2002

TProject Facilities
 Sinai White Cement Factory (Workshop and Warehouse Buildings) in El Arish, Client was ASEC Arab Swiss Engineering Company
 Suez Gulf Power Plant (Substation Building) in Suez and Port Said Power Plant (Substation Building) in Port Said Client was EDF/ALSTOM France
 LEONI Wiring System (New Factory) in Nasr City, Cairo, Client was General Authority of Investment and Free Zones
 Cairo 500 KV Substation in Alex.Desert Road, Cairo-with client EDF/ALSTOM USA

Consulting Site Engineer at Art & Architecture for Consultant, Designer and Planning
  • Egypt - Sharm el Sheikh
  • October 2000 to September 2001

Project Facilities
 Sun-Mon-Star hotels Nabq Hotels Project in Sharm El Sheikh
Description
 Design review & correction for LV and MV
 Site supervision
 Shop drawing & As Built drawing review

Electric Site Engineer at Creation Group Supply and Installation
  • Egypt - Cairo
  • September 1998 to September 2000

Project Facilities
 Stock Exchange Building in Cairo- Clint
 Administrative Building of Suez Canal for Insurance in Mohandessin, Cairo
 Commercial & Administration Tawfikya Tower in Down Town, Cairo
 Medical Center of Arab Contractors Hospital in El-Gabal El-Akhdar, Cairo
 The Clint was Arab Company
Description
 Preparing Work Shop drawing
 Site supervision
 Quantity surveying & As Built Execution
 Equipment erection
 Follow up the invoice

Education

Bachelor's degree, Engineering
  • at Toronto Universityof Technical InstitutesEl Dour InstituteToronto University
  • May 2008

as an Electrical Engineer by the Saudi Council of Engineers.

Bachelor's degree, Engineering
  • at Toronto Universityof Technical InstitutesEl Dour InstituteToronto University
  • May 2008

as an Electrical Engineer by the Saudi Council of Engineers.

Bachelor's degree, Engineering
  • at Toronto Universityof Technical InstitutesEl Dour InstituteToronto University
  • May 2008

as an Electrical Engineer by the Saudi Council of Engineers.

Bachelor's degree, Engineering
  • at Toronto Universityof Technical InstitutesEl Dour InstituteToronto University
  • May 2008

as an Electrical Engineer by the Saudi Council of Engineers.

Bachelor's degree, Engineering
  • at Toronto Universityof Technical InstitutesEl Dour InstituteToronto University
  • May 2008

as an Electrical Engineer by the Saudi Council of Engineers.

Bachelor's degree, Engineering
  • at Toronto Universityof Technical InstitutesEl Dour InstituteToronto University
  • May 2008

as an Electrical Engineer by the Saudi Council of Engineers.

Specialties & Skills

Quantity Surveying
Factory
Administration
CONSULTING
CUSTOMER RELATIONS
ENGINEERING
GRAPHIC DESIGN
NETWORKING
SUPERVISORY SKILLS
CABLING
MECHANICAL

Languages

Arabic
Expert
English
Expert
Italian
Expert