Operations Superintendent
Baker Hughes - Saudi Arabia
مجموع سنوات الخبرة :15 years, 6 أشهر
operations Superintendent for the LSTK South Ghawar Gas rigless operations project SAWCOD.
operations Superintendent for the LSTK South Ghawar Gas rigless operations project SAWCOD.
I prepared programs and budgets estimation for upcoming drilling campaign for onshore and offshore fields.
I prepared well intervention programs for jet pump installation, pump jack, velocity string, Sandstone reservoir acidizing, Barium sulfate scale removal operations, etc….
I worked as a completion/workover supervisor for all well interventions and artificial lift system installations ( Coil tubing jet pump installation, re-perforation, scale removal, hydraulic fracturing operation, post frack flow back and testing, linear sucker rod pump, convention beam pump installation, etc …)
I prepared AFEs and well cost estimations for work-over and well servicing operations.
I worked with finance to ensure that invoices logs and well cost tracker correlate.
Ensured MEDCO HSE policies and processes are complied with by service providers, including PPE requirements, Permit to Work, Energy Isolation, Confined Entry, Lifting Procedures, Incident Reporting, Job Safety Analysis (JSA), prejob safety meeting etc.
Performed the last beam pumps installation campaign (4 units installed and 10 units planned for next year) with zero LTIs.
Assigned as Drilling and well services Engineer in Karim Small Field to support local team during drilling, completion and well servicing operations.
Involved in Drilling, completions and well servicing programs in Karim Small field, more than 300 well service operations and 36 wells drilled in 2016 ( verticals, horizontals and deviated wells) . Two hoisting units and two drilling rigs hired to accomplish the work plan.
Involved with Production team for EOR equipment selection in KSF field (CSS, ESP, BP, PCP…) in harsh environment with high H2S concentration up to 20000 ppm.
All operations are performed according to Medco/ PDO HSSE standards and procedures (STOP, TRICK, SIMOPS, etcs….).
I worked with the Drilling Manager to prepare and execute drilling programs for Eight (8) 1500 meters vertical/ Deviated development onshore wells and one (1) 3200 meters deviated exploration offshore well.
I worked as a night drilling supervisor during the drilling campaign of last eights wells.
I worked as a completion/workover supervisor for all well interventions and artificial lift system installations ( Coil tubing jet pump installation, re-perforation, scale removal, hydraulic fracturing operation, post frack flow back and testing, linear sucker rod pump, convention beam pump installation, etc …)
I prepared AFEs and well cost estimations for completion, drilling and work-over operations.
I worked with finance to ensure that invoices logs and well cost tracker correlate.
I prepared, reviewed and completed the end of well reports.
I prepared and evaluated of drilling and completion tenders for both onshore and offshore projects (Jack up drilling rig, onshore drilling rig, drilling fluids, bits, Tubular, Coil tubing services…)
I prepared well intervention programs for jet pump installation, pump jack, velocity string, Sandstone reservoir acidizing, Barium sulfate scale removal operations, etc….
Ensured MEDCO HSE policies and processes are complied with by service providers, including PPE requirements, Permit to Work, Energy Isolation, Confined Entry, Lifting Procedures, Incident Reporting, Job Safety Analysis (JSA), prejob safety meeting etc.
Performed the last beam pumps installation campaign (4 units installed and 10 units planned for next year) with zero LTIs.
I assisted the Drilling superintendent to prepare and execute drilling programs for five (5) 2700 meters horizontal wells with 1000 meters horizontal legs, Eight (8) 1500 meters vertical/ Deviated development wells and two (2) 1500 meters exploration vertical wells.
I prepared AFEs and well cost estimations for completion, drilling and work-over operations.
I worked with finance to ensure that invoices logs and well cost tracker correlate.
I prepared, reviewed and completed the end of well reports.
I am involved in the preparation and the evaluation of drilling and completion tenders (drilling rig, drilling fluids, bits, tubular, Coil tubing services, Thru tubing services, Hydraulic fracturing and multistage completion systems …)
I prepared well intervention programs for jet pump installation, pump jack, velocity string and sand clean out operations.
I prepared completion programs for multistage hydraulic fracturing jobs with milling and sand clean out operations.
I prepared work-over programs for old wells. Those work-overs include stimulation jobs, pulling old completion and replace it by new string, remedial cement jobs, fixing corroded production string, etc...
I assisted the company-man to prepare daily drilling reports, daily cost reports and plan of actions during the execution of two (2) 4500 m vertical exploration wells and two (2) 2500 m vertical development wells. As a night company-man, I witnessed and learned extensively from the ongoing drilling, completion and well testing operations.
I assisted the head production engineer to prepare work-over operations. I have a small experience in design, installation and performance monitoring of ESPs.
I assisted all operations in the production facility; modification of process installations, adding new gas compressor and Electrical generators, well flow-line modifications, etc …
I prepared design for solar thermal & photovoltaic installation for domestics & industrial applications (Hotels, houses, factories, etc.)
I prepared design for solar thermal & photovoltaic installation for domestics & industrial applications (Hotels, houses, factories, etc.).
I presented company products and support the commercial representatives to convince clients.
I prepared design for solar thermal & photovoltaic installation for domestics & industrial applications (Hotels, houses, factories, etc.)
I mentored and trained solar technicians for many installed systems.
I prepared training programs and standards for energy saving for hotels and factories.
petroleum engineering diploma
energy engineering bachelor degree