Manage, cost and reporting throughout all project stages including tender, concept, design, construction and
Commissioning phases.
Monitor project scope and deliverable s including application of change management processes.
Plan and estimate resource requirements, analyzing task dependencies, and tracking project progress.
Project budgets, costs trends, expenditures, forecasts and cost analysis.
Manage the development, monitoring and controlling of the project schedule.
Project Completed : i) Working as a Resident Manager at Project “MAGNACON, BN-5, Sector-V, Saltlake City, Kolkata”, Client: Magnacon Electricals (India) Limited. ii) Working as a Resident Manager at Project “Industrial Unit Jamshedpur KCPT” at Kyocera CTC Precision Tools Pvt. Ltd. Part M-22, Phase Vll, , Adityapurlndustrial Area, , Gamharia-832108, Client: Kyocera CTC Precision Tools Pvt. Ltd. iii) Working as a Resident Manager at Project “ HRBC Super Speciality Hospital under BRGF” at Metiaburz, Kolkata, Client: HRBC.
Manage, cost and reporting throughout all project stages including tender, concept, design, construction and
Commissioning phases.
Monitor project scope and deliverables including application of change management processes.
Plan and estimate resource requirements, analyzing task dependencies, and tracking project progress.
Project budgets, costs trends, expenditures, forecasts and cost analysis.
Manage the development, monitoring and controlling of the project schedule.
Formulation and control of the project budget.
Critical path scheduling.
Provide timely and appropriate generation and distribution of project reports and information
To study the tender documents & drawings.To prepare the action plan in consultation with HOD.To conduct site investigation. To float the inquiries for bought out items. To be in touch with the Business Development Section for the clarifications required. Prepare Costing.
Implementation of the Management Information System, Business Plan, Master Budget Preparation.Profit and Loss analysis by means of MIS Report.
Manage, cost and reporting throughout all project stages including tender, concept, design, construction and
Commissioning phases.
Monitor project scope and deliverables including application of change management processes.
Plan and estimate resource requirements, analyzing task dependencies, and tracking project progress.
Project budgets, costs trends, expenditures, forecasts and cost analysis.
Manage the development, monitoring and controlling of the project schedule.
Formulation and control of the project budget.
Critical path scheduling.Provide timely and appropriate generation and distribution of project reports and information
Working as a Project Leader (Sr. Project Engineer) & Planning at Project “Commercial and Recreational Hub” at Durgapur, Client: BSHDL. To dealing with Client as well as contractors.Preparing master budget, Business Plan, MIS report.
Working as a Project Leader (Sr. Project Engineer) & Planning at Project “Surya Manson” at Topsia, Kolkata, Client: Surya Manson. To dealing with Client as well as contractors.Preparing master budget, Business Plan, MIS report.
Working as a Sr. Planning Engineer at Project “South City Garden” at TollygaungFanri, Kolkata, Client: South City Parivar. To Preparing master budget, Business Plan, MIS report. DPR Etc
Working as an Assistant Engineer in tendering department at sector V, SaltLake, Plot- Y-6, Kolkata.
Doing Rate Analysis, Estimating and Billing with Excel, Drawing with Autocad’05, Preparing Presentation with Power Point, Maya-6, 3D Studio Max-7 etc.
For Road, Railways, Bridges, Highways and Building etc.
World Bank Assisted Project, Construction Govt. Polytechnic at Nagaland, Kohima.
Construction of A.G. Staff Quarter.
I was working as a Sr. Engineer. Doing Rate Analysis, Estimating and Billing with Excel, Drawing with Autocad’02, Preparing Presentation with Power Point, Maya-6, 3D Studio Max-7 etc.
For Road, Bridges, Building etc., Supervision at Site.
Construction of Victoria Green’s Project at 385 Garia Main Road. I worked as a Site Engineer
Construction of Housing Project at 197 Andul Road. I worked as a Site Supervisor
Construction of Housing Project at 197 Andul Road at Howrah. I worked as a Site Supervisor
1st Class in Diploma in Civil Engineering
Passed in Higher Second Division in Science Stream.