Total Years of Experience: 10 Years, 9 Months
September 2018
To Present
Construction Manager
at Cengiz General Constructions of Buildings Roads Bridges and Sewerage S.P.C.
Location :
Kuwait - Al Farawaniyah
Managing all Maintenance civil and architectural works including Flooring, wall Partition, Glazing, Doors, Ceiling and Furnitures at Terminal 4 Kuwait airport which is handling 6 million passengers per year.
•Supporting Head office with more than 5 project Tender documentations, Estimation, Drafting and Planning.
•Supporting Client in improvement and Development of Airport Building.
•Prepared Complete Monthly reports, Inventory tracking, Follow up Liability with Sub contractors.
•Monitoring Airport stake holders Activities and keep Project records.
•Prepared Detail study of Airport Development according to Passenger strength increased in a year.
•Used critical thinking to break down problems, evaluate solutions and make decisions.
•Supporting Head office with more than 5 project Tender documentations, Estimation, Drafting and Planning.
•Supporting Client in improvement and Development of Airport Building.
•Prepared Complete Monthly reports, Inventory tracking, Follow up Liability with Sub contractors.
•Monitoring Airport stake holders Activities and keep Project records.
•Prepared Detail study of Airport Development according to Passenger strength increased in a year.
•Used critical thinking to break down problems, evaluate solutions and make decisions.
September 2017
To September 2018
Site Engineer
at Cengiz General Constructions of Buildings Roads Bridges and Sewerage S.P.C.
Location :
Kuwait - Al Farawaniyah
Site in Charge of Terminal Building and other support building like Ancillary building and Satellite building.
•Execution of Reinforced concrete structure from foundation to top roof with all floor level according to drawing specification and Quality control.
•Prepared Daily labor report, BOQ and Steel Bar Bending Schedule.
•Communicate with Consultant for approval and Process of Bill.
•Prepared Required Documentation in order to handover project to Client.
•Execution of Reinforced concrete structure from foundation to top roof with all floor level according to drawing specification and Quality control.
•Prepared Daily labor report, BOQ and Steel Bar Bending Schedule.
•Communicate with Consultant for approval and Process of Bill.
•Prepared Required Documentation in order to handover project to Client.
June 2015
To September 2017
Quantity Surveyor
at Ministry of Public Works
Location :
Kuwait - Janub as Surrah
Developed Detail Estimation of Public Projects like Drainage and Stormwater networks of various Governorate of Kuwait.
•Prepare Memo for various contractors according to Project design and Estimation and BOQ.
•Approval of Various Sub Contractor Progress Payment Reports.
•Prepare Memo for various contractors according to Project design and Estimation and BOQ.
•Approval of Various Sub Contractor Progress Payment Reports.
June 2014
To May 2015
Graduate Engineer Trainee
at URC Private Ltd
Location :
India - Chennai
Execute the Project according to Design and Drawing Specification.
•Do Review the drawing for if any Revised methodology required.
•Regulate Sub contracts in order to maintain timeline and quality.
•Do Review the drawing for if any Revised methodology required.
•Regulate Sub contracts in order to maintain timeline and quality.
June 2013
To May 2014
Quantity Surveyor
at Dural Engineering and Constructions
Location :
India - Erode
Assist Cost estimation of Residential Buildings.
•Arrange Sub contracts and Procurements according to Project requirements within budget and Construction time limit.
•Arrange Sub contracts and Procurements according to Project requirements within budget and Construction time limit.