Sarif Uddin أحمد, Senior Inspection Engineer (E&I).

Sarif Uddin أحمد

Senior Inspection Engineer (E&I).

SADARA Petrochemical Company

البلد
المملكة العربية السعودية - الشرقية
التعليم
بكالوريوس, Electrical
الخبرات
26 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 4 أشهر

Senior Inspection Engineer (E&I). في SADARA Petrochemical Company
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ ديسمبر 2013

• Provide technical support to Project Management in resolving problems concerning inspection methods and procedures for completing work within the scope and intent of applicable codes and standards.
• Make design review for Electrical and Instrumentation disciplines.
• Participate in assessment group for Electrical and Instrumentation disciplines to assess the EPCCs compliance with SADARA & other applicable standards including scope of work.
• Keep current of the latest developments in inspection standards, codes, practices, procedures, methods and inspection equipment, and assure that all work is completed according to all applicable codes and standards.
• Review/evaluate contractor’s quality assurance/quality control systems, as necessary, and ensure Inspection Records (hard copy and electronic databases) are compiled and maintained.
• Perform root cause analysis, assessments, and recommend short and/or long-term remedies and issue NCR if required.
• Make frequent visits to construction sites to resolve inspection related problems, or appraise adequacy of inspection services provided.
• Ensure Implementation of SADARA Standards by all EPCs.
• Submit PQI inputs and weekly reports to Quality Unit Lead.
• Evaluate the performances of EPCs QA/QC Supervisors/Inspectors and report to Quality Unit Lead.
• Attend Weekly Quality meetings to discuss quality concerns with EPC & Subcontractors.
• Perform quality monitoring for all stages of construction and pre-commissioning up to final acceptance, to ensure compliance with applicable standards and project specifications as per SADARA Standards and other international Standards.
• Review of E & I documents and Splicer qualifications etc.
• Analysis of process improvement.
• Training of Saudi engineers to work as SADARA/Aramco inspectors.
• Review of E & I pre-commissioning activities.
• Inspection of all E & I equipment/Instruments (starting from receiving inspection to final Installation).
• Participate in Induction Trainings, Orientations, Workshops & Safety Training Programs and Meetings
• Provide Quality Assurance and Control Mechanisms to ensure that the project requirements have been complied with.
• Perform analysis of project quality and conduct focus assessments to identify and resolve site issues by providing possible solutions.
• Ensure Contractors compliance with Company's Mandatory Documents.
• Conduct pre-commissioning inspection for all E & I activities
• Audit / Review / witness of activities such as Instrument Calibration etc.
• Review, validate and/or Approve Project Quality documents and Contractor Quality control Personnel.
• Design review of equipment design specification and drawing as per relevant SADARA, IEC, NEC, IEEE, ISA, and API.
• Provide technical support to Projects Management Team (PMT)

Quality Team Leader/QC Supervisor في Saudi Aramco Total Refining and Petrochemical Company (SATORP)
  • المملكة العربية السعودية - الجبيل
  • نوفمبر 2010 إلى أكتوبر 2013

• Supervise all aspects of inspection disciplines and give work direction to all inspection personnel in the assigned groups while working as a Quality Team Leader.
• Provide technical support to Project Management in resolving problems concerning inspection methods and procedures for completing work within the scope and intent of applicable codes and standards.
• Help management to evaluate and ensure that adequately trained and certified personnel are available to meet the workload across the SATORP packages.
• Coordinate/Lead weekly communication meeting for all the Electrical, Instrumentation and Telecommunication Inspectors of all the SATORP packages.
• Make 60%, 90% design review for Electrical and Instrumentation disciplines.
• Participate in assessment group for Electrical and Instrumentation disciplines to assess the EPCCs compliance with JERES & other applicable standards including scope of work.
• Keep current of the latest developments in inspection standards, codes, practices, procedures, methods and inspection equipment, and assure that all work is completed according to all applicable codes and standards.
• Review/evaluate contractor’s quality assurance/quality control systems, as necessary, and ensure Inspection Records (hard copy and electronic databases) are compiled and maintained.
• Perform root cause analysis, assessments, and recommend short and/or long-term remedies and issue NCR if required.
• Make frequent visits to construction sites to resolve inspection related problems, or appraise adequacy of inspection services provided.
• Ensure Implementation of JERES Standards by all Inspectors
• Submit PQIs and weekly reports to Group Leader / Quality Advisor/ QA/QC Manager.
• Evaluate the performances of each Inspector and report to the management.
• Attend Weekly Unit Quality meetings discuss quality concerns with EPCC & Subcontractors.
• Arrange internal communication meetings and receive each Inspectors view and undertake new quality initiatives to improve performance of the unit.
• Perform quality monitoring for all stages of construction and pre-commissioning up to final acceptance, to ensure compliance with applicable standards and project specifications as per SATORP Standards and other international Standards.
• Review of E & I documents and Splicer qualifications etc.
• Analysis of process improvement.
• Training of Saudi engineers to work as SATORP/Aramco inspectors.
• Review of E & I pre-commissioning activities.
• Inspection of all E & I equipments/Instruments (starting from receiving inspection to final Installation).
• Conduct & Participate in Induction Trainings, Orientations, Workshops & Safety Training Programs and Meetings
• Provide Quality Assurance and Control Mechanisms to ensure that the project requirements have been complied with.
• Perform analysis of project quality and conduct focus assessments to identify and resolve site issues by providing possible solutions.
• Ensure Contractors compliance with Company's Mandatory Documents.
• Conduct pre-commissioning inspection for all E & I activities
• Audit / Review / witness of activities such as Instrument Calibration etc.
• Review, validate and/or Approve Project Quality documents and Contractor Quality control Personnel.
• Design review of equipment design specification and drawing as per relevant SATORP, IEC, NEC, IEEE, ISA, API and ARAMCO Standards.
• Provide technical support to Projects Management Team (PMT)

Quality Supervisor (SAP # 70011709) في Saudi ARAMCO Inspection Department (SA-PID)
  • المملكة العربية السعودية - الشرقية
  • سبتمبر 2009 إلى أكتوبر 2010

• Supervise all aspects of inspection disciplines and give work direction to all inspection personnel in the assigned groups.
• Provide technical support to Project Management in resolving problems concerning inspection methods and procedures for completing work within the scope and intent of applicable codes and standards.
• Ensure adequately trained and certified personnel are available to meet the workload.
• Keep current of the latest developments in inspection standards, codes, practices, procedures, methods and inspection equipment, and assure that all work is completed according to all applicable codes and standards.
• Review/evaluate contractor’s quality assurance/quality control systems, as necessary, and ensure Inspection Records (hard copy and electronic databases) are compiled and maintained.
• Perform root cause analysis, assessments, and recommend short and/or long-term remedies.
• Make frequent visits to construction sites to resolve inspection related problems, or appraise adequacy of inspection services provided.
• Submit monthly PQIs for different Projects.
• Ensure Implementation of Quality Management Information System (QMIS) by all Inspectors
• Submit daily, weekly and monthly quality reports to Aramco Field Supervisor.
• Evaluate the performances of each Inspector and report to the management.
• Initiate Training for newly hired Saudi and Non-Saudi Inspectors.
• Attend Weekly Unit meetings and prepare the MOM and advise the Inspector about the requirement of the management.
• Arrange internal communication meetings and receive each Inspectors view and undertake new quality initiatives to improve performance of the unit.
• Arrange logistics for the inspectors i.e. Aramco Id., Vehicle Sticker, Temporary access etc.

Senior Inspection Engineer (E&I) في Saudi ARAMCO Inspection Department (SA-PID)
  • المملكة العربية السعودية - الشرقية
  • فبراير 2006 إلى أغسطس 2009

• Quality monitoring for all stages of construction and pre-commissioning up to final acceptance, to ensure compliance with applicable standards and project specifications as per Saudi Aramco Engineering Standards and other international Standards.
• Focused assessment of Field works.
• Review of E & I documents and Splicer qualifications.
• Analysis of project quality and preparation of project quality index across jobs / projects
• Analysis of inspector’s pro-activeness related to quality and preparation of violation prevention index across jobs /inspection sections.
• Analysis of process improvement.
• Training of Saudi engineers to work as Aramco inspectors.
• Inspection and review of E & I pre-commissioning activities.
• Monitoring of Instrument loop check activities.
• Inspection of all E & I equipments/Instruments (starting from receiving inspection to final Installation).
• Conduct & Participate in Induction Trainings, Orientations, Workshops & Safety Training Programs and Meetings
• Provide Quality Assurance and Control Mechanisms to ensure that the project requirements have been complied with.
• Conducts focus assessments to identify and resolve site issues by providing possible solutions.
• Ensure Contractors compliance with Company's Mandatory Documents.
• Conduct Installation & Pre-commissioning Inspection for all E & I activities.
• Audit / Review / Witness of activities such as Instrument Calibration etc.
• Review, validate and/or Approve Project and contractor Quality documents and Contractor Quality control Personnel.
• Design review of equipment design specification and drawing as per relevant NEC, IEC. IEEE, ISA, API & ARAMCO Standards.
• Provide technical support on Construction Projects through performance of direct Point-Inspections in the Field.etc.

QA/ QC Manager / QA/QC Engineer في Carlo Gavazzi Arabia Co.Ltd
  • المملكة العربية السعودية
  • أبريل 2003 إلى أبريل 2005

Key Deliverables:
• Regularly report to the corporate QA/QC Manager about the project QA/QC activities.
• Prepare Project Quality Plan, Quality Control Procedures, Method statements, Inspection and Test Plan (ITP) in accordance with latest Industrial Standards such as NEC, IES, BS, IEEE, ASTE, Saudi ARAMCO Standards and SAEP-1023 & ISO-900.
• Review of QA/QC documents associated with Quality Records, Test Records, and Pre-commissioning & Commissioning
• Arranging of Material Receiving Inspection, Factory Acceptance Test for Equipment Purchased,
• Preparing of Material Receiving Report/ Material Damage Report and Quarantine the Rejected Material from Site,
• Perform Quality internal and supplier Audit to ensure that the QMS requirements are understood and implemented throughout the entire duration of the Project.
• Arrange 3rd Party Audit for 15% and 60% of the project completion phases.
• Made frequent visits to the construction sites to resolve inspection related problems, or appraise adequacy of inspection services provided.
• Ensure that all the Quality personnel are suitably trained and conversant with Quality Management System.
• Ensure that all the Quality personnel are well conversant with their area of Inspection speciality.
• Preparing of QA/QC documents prior to signing off Mechanical Completion Certificate (MCC) and prior to handover of equipment
• Supervise the submission of As-Built and QC documentation upon completion of the processes / project.

Electrical Engineer / QA/QC Engineer (Electrical) في Saleh Saleh Al-Hareth
  • المملكة العربية السعودية - الخبر
  • فبراير 1999 إلى مارس 2002

Key Deliverables:
• Inter Disciplinary Checks for Engineering Drawings, Specifications & Methodology
• Procurement (Requisition to approval) of project materials
• Reviewing and checking subcontractors’ documents, specifications and technical submittals.
• Supervision of Subcontractor’s works, review and checks related to technical submittals, drawings and procedures and schedule compliance.
• Erection, pre-commissioning and commissioning of. 13.8 KV Substations, consisting of 13.8 KV MV switchgears, C&R panel, DC & AC UPS and MCCs.
• Responsible for design, engineering, procurement and construction work carried out for different Projects.
• Technical bid evaluations of HV and LV switchgears which included 22MVA transformers, 13.8Kv Switchgear, 3000A LV Main Distribution Boards, Panel Boards, LV and HV cables and associated accessories
• Design and development of 13.8 kV substations.
• Laying of approximately 60 KM of HV cables and 150 KM of LV cables.
• Supervision of Subcontractors’ electrical works, review and checks related to technical submittals, drawings and procedures and schedule compliance.
• Responsible for installation, pre-commissioning, commissioning and testing of all the substations equipment
• Preparation of pre-commissioning & commissioning checklists and punchlists upon inspection for ensuring scope compliance.
• Installation and Commissioning of 1750 KVA DG Generators.
• Preparation of MOM, Daily, Weekly and Monthly Progress Reports.
• Helping the project coordinator with day-to-day correspondence with the client and subcontractors at the site.
• Implementation of Document Control Procedure at the site office.
• Interfacing between the Clients and the Subcontractors to solve the day-to-day site issues.

Electrical Engineer في North Eastern Electric Power Corporation Limited (NEEPCO
  • الهند
  • مارس 1996 إلى فبراير 1999

Key Deliverables:
• Report to the Executive Engineer about day to day activities Related to maintenance,
• Planned Shutdown Schedule for Contractors for the Expansion of Existing Facilities
• Witness Testing and Commissioning activities and Report Deficiencies to the Executive Engineer and advice remedies,
• Attend Routine Maintenance works
• Attend Trouble Shooting activities
• Requisitioned Materials for Maintenance,
• Planned Preventive Maintenance Schedule and Maintain Inspection Log etc.

Equipment / Activities Involved:
• 11 kV Generators, 50 MVA Power Transformers
• Maintenance of 220 kV Switchyard, 220 kV Isolators, 220 kV SF6 Circuit Breakers
• 6.6 kV & 415 V Switchgears, Control and Relay Panels,
• Battery Bank & Battery Charger, Utility services,
• Motor Control Centre, Lighting Systems
• Lightning Arresters and Grounding Systems etc.

الخلفية التعليمية

بكالوريوس, Electrical
  • في Assam Engineering College, Gauhati University, Assam
  • مايو 1996

Specialties & Skills

Quality Inspection
Quality Assurance
Management
ISO Auditor
General Construction
Construction and Maintenance of Power Plant, Substation, Oil and Gas sector Expert More than 5 years

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس
العربية
مبتدئ
الهندية
متمرّس

العضويات

IRCA
  • Certified Lead Auditor in QMS ISO 9001:2000
  • August 2008
IRCA.
  • Certified Lead Auditor in EMS ISO 14001:2004
  • July 2008
IRCA
  • Certified Lead Auditor in BS OHSAS 18001:2007
  • July 2008
International Register of Certificated Auditors (IRCA)
  • QMS 2008 Lead Auditor # 1198104 Valid till Sep. 2015
  • September 2010

التدريب و الشهادات

CPR, AED, and first aid training programe (تدريب)
معهد التدريب:
Future Specialist Center for Health Training
تاريخ الدورة:
May 2014
المدة:
16 ساعة
8 Life Critical Trainings for PMT at SADARA (تدريب)
معهد التدريب:
SADARA Traning Department
تاريخ الدورة:
February 2014
المدة:
40 ساعة

الهوايات

  • Resolving problems, Learning, knowledge sharing, reading
    Received Letter of Appreciation from most of the previous projects.