Total Years of Experience: 23 Years, 9 Months
May 2019
To Present
Project Engineer
at Chinki Construction PVT LTD
Location :
India
Project Execution • Installation • Testing & Commissioning
SYNOPSIS
•Around 11 years of experience in Estimation, Execution, Testing & commissioning in MEP- Mechanical services.
•Also take involvement in design of interim systems.
•Proficient in managing Installation and maintenance operations.
•Familiar in system/ equipments as HVAC, Plumbing & sanitary, Fire fighting sprinkler and wet riser systems, Fire suppression systems, FCU, AHU, FAHU, Supply & Return Ducts, Fresh air, LPG, irrigation systems, Hot water generators, pumping systems, etc
•Quantity surveying, Quality control, Forecasting, Labour cost calculation.
•Always ready to work under pressure and to give the best output.
•Always take initiatives to improve the workmanship of labours and quality of works done.
CAREER SCAN
SYNOPSIS
•Around 11 years of experience in Estimation, Execution, Testing & commissioning in MEP- Mechanical services.
•Also take involvement in design of interim systems.
•Proficient in managing Installation and maintenance operations.
•Familiar in system/ equipments as HVAC, Plumbing & sanitary, Fire fighting sprinkler and wet riser systems, Fire suppression systems, FCU, AHU, FAHU, Supply & Return Ducts, Fresh air, LPG, irrigation systems, Hot water generators, pumping systems, etc
•Quantity surveying, Quality control, Forecasting, Labour cost calculation.
•Always ready to work under pressure and to give the best output.
•Always take initiatives to improve the workmanship of labours and quality of works done.
CAREER SCAN
December 2011
To March 2019
Project Engineer
at BILT Middle East LLC
Location :
United Arab Emirates
November 2017
To March 2019
at EQUIPMENTS & SYSTEMS FAMILIAR WITH
HOT & COLD WATER PIPING SYSTEMS.
•DRAINAGE U/G & H/L & STACKS
•SANITARY INSTALLATIONS.
•PUMPS (BOOSTER PUMPS, TRANSFER PUMPS, CIRCULATION & DOSING PUMP)
•VALVES & ACCESSORIES.
•FILTRATION (ACF, SAND FILTER, MULTIMEDIA FILTER) & SOFTENER
•HEAT EXCHANGER (PLATE, SHELL & TUBE)
•IRRIGATION SYSTEMS
•BMS INTERFACING WITH SYSTEM
HOT WATER GENERATION:
•HOT WATER BOILERS (WATER TUBE AND SMOKE TUBE TYPE)
•CALORIFIER, WATER HEATERS, HEAT PUMPS
•HYDRAULIC SEPARATOR
•CORROSION INHIBITOR
•EXHAUST/ CHIMNEY
•BMS & FIRE ALARM INTERFACING WITH SYSTEM
FIRE FIGHTING:
•FIRE PUMPS (DIESEL ENGINE, ELECTRICAL & JOCKEY)
•VALVES & HOSE REELS
•SPRINKLER AND WET RISER SYSTEM
•FIRE HYDRANT NETWORK
•BREECHING POINTS
•FIRE SUPPRESSION SYSTEMS (PRE-ACTION, DELUGE, FM200, ETC)
•FIRE ALARM SYSTEM (CAUSE AND EFFECTS)
HVAC:
•CHILLED WATER AND DUCTING NETWORK
•DAMPERS, PHE, VALVES,
•AIR HANDLING SYSTEMS (FAHU, AHU, FCU)
•BMS AND FIRE ALARM INTERFACING WITH SYSTEM
•DRAINAGE U/G & H/L & STACKS
•SANITARY INSTALLATIONS.
•PUMPS (BOOSTER PUMPS, TRANSFER PUMPS, CIRCULATION & DOSING PUMP)
•VALVES & ACCESSORIES.
•FILTRATION (ACF, SAND FILTER, MULTIMEDIA FILTER) & SOFTENER
•HEAT EXCHANGER (PLATE, SHELL & TUBE)
•IRRIGATION SYSTEMS
•BMS INTERFACING WITH SYSTEM
HOT WATER GENERATION:
•HOT WATER BOILERS (WATER TUBE AND SMOKE TUBE TYPE)
•CALORIFIER, WATER HEATERS, HEAT PUMPS
•HYDRAULIC SEPARATOR
•CORROSION INHIBITOR
•EXHAUST/ CHIMNEY
•BMS & FIRE ALARM INTERFACING WITH SYSTEM
FIRE FIGHTING:
•FIRE PUMPS (DIESEL ENGINE, ELECTRICAL & JOCKEY)
•VALVES & HOSE REELS
•SPRINKLER AND WET RISER SYSTEM
•FIRE HYDRANT NETWORK
•BREECHING POINTS
•FIRE SUPPRESSION SYSTEMS (PRE-ACTION, DELUGE, FM200, ETC)
•FIRE ALARM SYSTEM (CAUSE AND EFFECTS)
HVAC:
•CHILLED WATER AND DUCTING NETWORK
•DAMPERS, PHE, VALVES,
•AIR HANDLING SYSTEMS (FAHU, AHU, FCU)
•BMS AND FIRE ALARM INTERFACING WITH SYSTEM
March 2015
To June 2016
at Al Maktoum International Airpor
Location :
India
Cost of Project 135 Million Dirhams (AED) for MEP
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
PreviousProject Sky Cargo Project
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
PreviousProject Sky Cargo Project
April 2014
To February 2015
Cost of Project 88 Million Dirhams (AED) for MEP
Role was responsible for overall Infrastructure (external) piping under the scope of Plumbing and Fire Fighting.
Installation of services/Pipeline (soil, waste, storm, water supply & Fire Fighting) from government provided stub outs/provisions to run entirely along the whole cargo compound in a ring for pressurized systems with various tap outs from the compound & connecting Drains to provided government Manholes as per rule and regulations of the authority.
Previous Project 38-Villa & Retail Development
Role was responsible for overall Infrastructure (external) piping under the scope of Plumbing and Fire Fighting.
Installation of services/Pipeline (soil, waste, storm, water supply & Fire Fighting) from government provided stub outs/provisions to run entirely along the whole cargo compound in a ring for pressurized systems with various tap outs from the compound & connecting Drains to provided government Manholes as per rule and regulations of the authority.
Previous Project 38-Villa & Retail Development
December 2012
To March 2014
at AL WASL
Location :
India
Cost of Project 37 Million Dirhams (AED) for MEP
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
Previous Project HYATT RESIDENCY HOTEL & RESIDENTIAL APARTMENTS @ DUBAI HEALTHCARE CITY, DUBAI (
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
Previous Project HYATT RESIDENCY HOTEL & RESIDENTIAL APARTMENTS @ DUBAI HEALTHCARE CITY, DUBAI (
December 2011
To July 2012
at JW MARQUIS MARIOTT HOTEL
Location :
India
Cost of Project 300 Million Dirhams (AED) for MEP
Role Testing & commissioning of the Installed systems
Role Testing & commissioning of the Installed systems
December 2010
To August 2011
at HOTEL RED FOX
Location :
India
Cost of Project Rs. 1.5 Crore
Role looking over the Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units.
Role looking over the Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units.
April 2009
To August 2011
Mechanical Site Engineer
at Sakar India Pvt Ltd
Location :
India
May 2009
To November 2010
at HOTEL LEELA PALACE
Location :
India
Cost of Project Rs. 2.4 Crore
Role Looking over the Execution/Installation, T&C and Handing over of Hot water generator system overall.
Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units
Role Looking over the Execution/Installation, T&C and Handing over of Hot water generator system overall.
Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units
Share on Facebook
Share on Twitter
Share Via Email