Sathasivam Sivaguru, Manager qc

Sathasivam Sivaguru

Manager qc

Hindustan construction company

Location
India
Education
High school or equivalent, Diploma in Civil Engineering,
Experience
9 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :9 years, 7 Months

Manager qc at Hindustan construction company
  • India - Chennai
  • My current job since October 2023

Overall 19years experience,
Currently I am working in Chennai underground metro rail project (TATA project Ltd) QA/QC Dy.Manager .


1..Ministry of interior project Jizan Saudi Arabia(precast Villas panels building landscape Inspector QA CIVIL )

2.Riyadh underground metro rail project 2 years RAMPED Saudi Arabia CIVIL INSPECTOR

3.underground Hydro power Dam project Kashmir (Kishanganga hydro electric power project)

4.underground Hydro power Dam and tunnel project ( Chuzachen Hydro electric power project Sikkim )

5.Chennai underground metro (Afcons infrastructure Ltd)

CIVIL QA INSPECTOR at El-SEIF ENGINEERING CONTRACTING COMPANY
  • Saudi Arabia
  • March 2016 to May 2018

A per ITP required Shotcrete panel casting, observed on site needle penetration test & sampling of core has been taken & tested result updated RI summary register maintained .required testing or rock bolt pullout Testing updated result. Rebound testing of Shotcrete conducting of as per ITP required. Position: CIVIL QA INSPECTOR Date: 30th March 2016 to 23rd may 2018 Employer: El-SEIF ENGINEERING CONTRACTING COMPANY Project: MILITARY OF INTERIOR PROJECT-GIZAN (SAUDI) Project Description: Precast manufacturing and erection of Building (G+1 100 UNITS &G+2 80 UNITS), Landscape developments, storm water network system, waterproofing, finishing work, road developments inside the set with car park (2 Lane Road 12W approx 150kms Duties & Responsibilities: Review the submittal of the IR prior to submission to the client and coordinate with the client on the relevant inspection after verification of the completed work by the construction team to ensure compliance to specification requirements. Contact to log on all observed (internal/External) non-conformance in the observation Note (ON) register and to be coordinated with the construction team for timely corrective measures, Ensure all test inspections are performed and all relevant inspection forms are recorded as per project specification and applicable ITP, Coordinating with the third party testing laboratory for the test result of all the tests carried out in the field Received Panel Register Maintained as per site required, Monitoring the all precast panel villa wise maintained the cube strength Register and Maintained the Third party Test Reports as per Contractual winter material list Monitoring the interior finishing work as per ITP checked Pre & Post inspection for precast panel surface finishing, grouting required dimension and sounding testing test checked as per Method statement

CIVIL INSPECTOR at RAMPED
  • Saudi Arabia
  • November 2015 to December 2016

Employer (Client): RAMPED -A JOINT VENTURE OF LOUISE BERGER AND HILL INTERNATIONAL Contractor: FAST-Line -4 (4C2) Project: CUT AND COVER UNDERGROUND METRO RAIL STATION 325m (AL-IMMAM UNIVERCITY-RIYADH) Project Description: Design and build (DB) contract for the construction of Riyadh Metro, involving the construction of six lines running over a total distance of about 176 kilometers comprising 85 stations. Duties & Responsibilities: Construction & Supervision of Underground Metro Rail Stations by Bottom-Up of station box construction (Cut & Cover Method) Construction Supervision of Ensured the Retaining Wall, Strutting and Excavation, Base slab, concourse slab, roof slab, column, etc... Works. Ensuring safe working of all construction activities, machinery and workers working at site. Timely completion of assigned works as per project schedules with Quality and Safety. NCRs to contractors for non-compliance of project quality standards. Daily, weekly and monthly reports on progress and resources, assistance to Management in official correspondence. Visiting of labs and plants for material checking and quality compliance. Monitoring of Geotechnical instrumentation, utility diversion works, traffic diversion, Review of contractors planned schedules, work programmes and suggesting modifications. Review of project documents such as Method statements, ITPs, progress documents, FCRs, DDSQs and feedback from site to management Carry out regular site inspections and review, monitor contractor's shop drawings, materials, method statements and progress on site and working closely

ENGINEER CIVIL QA/QC at AFCONS INFRASTRUCTURE LTD
  • United Arab Emirates
  • December 2011 to November 2015

Monitoring civil, structural work on site and monitoring the contractor compliance with the approved safety policy and regulations. Responding to queries from Contractors and assisting in preparation of monthly progress reports. Raise Non Conformance Reports (NCR) and Discrepancy Report (DR), when activities deviate from the Contract Specifications or normal Construction industry practices. Maintain daily reports of site activities and resources Requirements. Monitoring and reporting on contractor baseline as well as the 3 months rolling programmed. Reviewing of method statements, material approval and construction procedure etc. Position: ENGINEER CIVIL QA/QC Date: 20 Dec 2011 to 11th Nov 2015 Employer: AFCONS INFRASTRUCTURE LTD Project: UNDERGROUND CHENNAI METRO RAIL (EGMORE TO MINT) No of 5 Station Project Description: Phase 1 Information. Construction on the 54.1 km Phase 1 of the Chennai Metro system began in 2009. The first section opened in June 2015 and the last section is expected to open in 2019. Duties & Responsibilities: D- WAll construction: As per construction sequence of Guide wall survey marking ensured, construction of guide wall Pre inspection and post inspection, Before Excavation of ensured Bentonite properties and as per Required quantity of bentonite before excavation ensured, During excavation checked required toe level part of 2 time checked verticality Koden Machine (50% & 100%) by used chain sounding, ensured panel primary and secondary a per drawing top end position and Water stopper lapping connected a per vender lit approved material. Pre inspection of reinforcement cage lowing as per drawing ensured required length, three Set welding. Lifting hook length, coupler level and required ITP bentonite properties, a per required toe level ensured. During concrete monitories in trimie pipe a per toe level required aired, as per ITP required grade o concrete ensured and a per required concrete cube casted, timely completion o concrete pouring ensured top level back Fill, Base Slab, concourse Slab, roof Slab: Construction of Slab preparation of blinding concrete assured excavated Surface as built of coordinate With Survey team as per required level, during Start the reinforcement work review the blinding as built ensured AS per ITP required tested Waterproofing material checked during Work ensured lap length Construction joint. During Reinforcement pre inspection checked as per drawing, as per drawing during concrete ensured grade concrete, Slump and temperature, as per ITP required casted cube. After casted lab post pour ensured Finishing Surface. Timely completion of Slab cube test reports, post pour report to reporting to HOD, Weekly completion of D-Wall panel, lab, column Staircase and Structural Work report and non confirmation reporting to HOD QM. Ensured strut & Waller erection Work ensured as per drawing, during erection ensured Welding thick, DPT test. Packing also. Architect Structural: Concourse level Rooms (wet area waterproofing(screed), Block work dimension, diagonal, verticality every 2m height (plump), wall tiles, floor tiles, staircase tile checked as per specification. Fall selling Tray fixing, OT Duct segment Erection and grouting of base slab checked with as per method statement with Quality & safety TBM (underground metro rail project): As per Schedule of inspection for Ring segment lips & steps Hydroblicstrick bar fixing, temporary segment, rail track & sleeper alignment fixing work, Segment ring to ring joint grout (outer) as per Quality method statement checked, earth pressure with face Pressure, Grouting pressure also as per required checked, segment before installation surface cracks &as per ITP pre inspection checked.

ENGINEER at CIVIL
  • United Arab Emirates
  • June 2009 to December 2011

Employer: SEW INFRASTRUCTURE LTD Client: Gati Infrastructure LTD Project: CHUZACHEN HYDRO ELECTRIC POWER PROJECT-RONGLI (SIKKIM-INDIA) Project Description: this project design capacity of 99MW, chuzachen a run of the river with two interconnected reservoirs with an installed capacity of 99MW, THE CHUZACHEN has two intake each with a storage reservoir and head race tunnel etc joining together to a common headrace tunnel, underground surge shaft (headrace tunnel location: rangpo and rongli). Duties &Responsibilities: Construction of rack fill dam excavation, wich is safety required portion installation of rock bolt, shortcreting, soil stability analysis of test for foundation, diverted river water system(making of temporary tunnel), in and outlet storage of measure Intake structure raft foundation maintain the water level Head race tunnel, power house tunnel and utility gallery tunnel construction of every day given face profile marking (setting out) the survey team coordinate and drilling and blasting as per required safety environment .Blasted mucking disposed timely completion of assigned work as per project schedules with Quality and safety, carry out regular site inspection and review, monitoring design drawings, materials, method statements and progress on site working closely with construction manager. Supervising of structure: Rock fill dam concreting, Intake Gate structure, Tunnel Gallery and temporary tunnel reconciliation of steel, BBS, as per required Concrete monitoring the daily plan and weekly plan, reporting the site manager with coordinate Client, Construction of temporary coffer dam monitoring and required soil

SITE ENGINEER at HINDUSTAN CONSTRUCTION.CO LTD
  • February 2011 to November 2011

Employer: HINDUSTAN CONSTRUCTION.CO LTD Project: KISHANGANGA HYDRO ELECTRIC POWER (UNDERGROUND) KASHMEER-GUREZE VELLY (INDIA) Project Description: the hydro-electric project is being constructed by India with a planned capacity of 330MW by diverting the water of kishanganga / Neelum river through a 23km long tunnel .The project involves construction of a 37 meter tall concrete dam, comprises 3 units of 110 megawatts (MW)each. Duties &Responsibilities: Construction of rack fill dam excavation, which is safety required portion installation of rock bolt, shortcreting, soil stability analysis of test for foundation, diverted river water system(making of temporary tunnel), in and outlet storage of measure Intake structure raft foundation maintain the water level Head race tunnel, power house tunnel and utility gallery tunnel construction of every day given face profile marking (setting out ) the survey team coordinate and drilling and blasting as per required safety environment .Blasted mucking disposed timely completion of assigned work as per project schedule with Quality and safety carry out regular site inspection and review, monitoring design drawings, materials, method statements and progress on site working closely with construction manager.

Education

High school or equivalent, Diploma in Civil Engineering,
  • at Arulmigukalasalingamcollege of polytechnic
  • January 2004

CIVIL Engineering

Specialties & Skills

Commercials
Interiors
CONSTRUCTION
DRAWING
WATERPROOFING
EXCAVATION
INFRASTRUCTURE
INSTALLATION
LAPPING
REINFORCEMENT
COORDINATING
WELDING

Languages

Tamil
Expert
English
Expert

Hobbies

  • reading books, and in my field