commissioning engineer
Hyundai Heavy Industries co. ltd
Total years of experience :12 years, 8 Months
i work here as a electrical commissioning engineer with work responsibility of commissioning of MV and LV switchgear, CEG-DC and AC UPS System, DC Motor starter panel commissioning with no load and on load motor run, AC motor SOLO run test and on load test with coordinating with mechanical and I&C team.etc
Work responsibility includes Pre-Engineering Survey, Detailed Engineering, Erection, Testing and commissioning of 400KV Gas Insulted Switchyard (Model No. T-155) consisting of 8 Bays.Erection and commissioning of CT, CVT, SF6 Circuit Breaker, Wave Trap, earthing switch, Disconnecting Switch.
stability testing of 400 KV GIS including transformer, MV switchgear etc.
Erection and Testing of 300MW Generator and excitation system.
Operation and maintenance of 400KV GIS and MV switchgear.
As a electrical engineer i deep study of thermal power plant process, operation, maintenance, construction, erection and commissioning etc.We attended simulator training of 250MW, 600MW thermal power plant operation.
As a electrical engineer i completed (erection and commissioning) of two coal handling plant project for Bajaj Energy Limited, Uttar-Pradesh(India).
I completed LV switchgears, Motors, ILMS, MD, VFD, UPS, PLC system and protection switches etc.
I had completed my Master Degree in Power system under Maharishi Dayanand University,Rohatk with good score.
I had completed my post graduation diploma in thermal power plant engineering with CEA certified institute with good score.
i had completed my B.tech degree under Maharishi Dayanand University with Honers and good score.
i had completed my Higher senior secondary education with good score.