QA QC Manager - Construction Division
Arabian International Company
Total years of experience :15 years, 6 Months
Overall QC manager -Construction division on GCC
Saudi Arabia, Kuwait and Oman
Several commercial and industrial projects like airports, power stations, malls, resident buildings, metro station, maintenance hangers.
Tank site fabricated projects in KSA for SWCC, Madden , Flour
Riyadh Metro Project
ANM
Western Iconic Station 3B2
Shauqaiq Power Station
Construction of two boiler, Four STG buildings and other buildings
Steel structural Erection Parcel steel structure
King Abdullah financial District
Kind Saud University (Sports Arena)
Medical Research Center MRC
inspection production of piping, steel supports tanks pressure vessel
Abu Qir Thermal Power Plant
- Follow up the erection of piping & pipe supports including (BP, BEP, and NBEB),
- Follow up all the welding activities inside the boilers (Fit up, Welding, Preheating, PWHT,
- Follow up the erection of valves and pumps,
- Preparing for hydro test (limits, ventilation point, drainage point, equipments),
- Prepare test packages, punch list and as built drawing,
- Incoming material inspection,
- Supervising new welders’ tests,
- Follow up all WPS's & PQR's according to AWS D1.1, ASME I, ASME IX and ASME31.1 codes.
- Follow up all the NDT activities.
- Prepare manufacturers' partial data report (P-4), manufacturers' data report for fabricated piping (P-4A)
and manufactures' data report supplementary sheet P6 form.
EZZ Steel Extension, construction of bar mill, pump room, pipe rack
ََََQuality control Engineer
follow up the erection procedure and check all fit up and welding steps
follow up welding procedure specification
welder qualification
Sidi Krir HRSG Power Plant
Follow up the erection of piping & pipe supports including (BP, BEP, and NBEB),
- Follow up all the welding activities inside the boilers (Fit up, Welding, Preheating, PWHT,
- Follow up the erection of valves and pumps,
- Preparing for hydro test (limits, ventilation point, drainage point, equipments),
- Prepare test packages, punch list and as built drawing,
- Incoming material inspection,
- Supervising new welders’ tests,
- Follow up all WPS's & PQR's according to AWS D1.1, ASME I, ASME IX and ASME31.1 codes.
- Follow up all the NDT activities.
- Prepare manufacturers' partial data report (P-4), manufacturers' data report for fabricated piping (P-4A)
and manufactures' data report supplementary sheet P6 form.
carry out welding test, thickness measurement and insurance consultantion
THe graduation project was welding of heat resisting alloys Grade Excellent