Shabbir Ahmad, QA QC Engineer l Fahud Maintenance Projects & Rig Movement.

Shabbir Ahmad

QA QC Engineer l Fahud Maintenance Projects & Rig Movement.

Intertek

Location
Oman - Muscat
Education
Bachelor's degree, Civil
Experience
16 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 2 Months

QA QC Engineer l Fahud Maintenance Projects & Rig Movement. at Intertek
  • Oman
  • My current job since January 2022

Accountable for ensuring rigorous adherence to quality procedures at construction sites, with a specialized focus on overseeing internal audit functions. Key responsibilities encompass the supervision of steel structure activities, validation of the Construction Completion Management System, creation of punch lists, and active participation in QA/QC meetings. Proficient in generating detailed progress reports, initiating NCRs/CARs/QORs, and fostering collaboration with Construction/HSE departments. Demonstrates adept management of comprehensive recording of inspections and tests, coordination with Independent Testing Laboratory, and refinement of Quality Control procedures, ITPs, and Checklists. Overseeing road activities, evaluating the suitability of road materials, and supervising civil activities related to rig movement and underground works are integral components of the role. Proven expertise in managing civil activities specific to rig movement, including cellar pit casting, water/waste pit construction, liner installation, access road development, flowline installation, and compaction/testing processes. Skillfully integrates internal audit responsibilities to ensure a thorough and holistic approach to maintaining quality and compliance standards.

QA QC Civil Engineer at Intertek Oman as PDO TPI
  • Oman - Muscat
  • October 2017 to December 2021

• Carry out inspection and check for all quality-related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.
• Verification of CCMS (Construction completion Management System) and Generating Punch list.
• Regularly attend QA/QC Weekly Meeting with the contractor and contribute to the resolution of quality issues.
• Coordinate with Construction/HSE departments to ensure work is being performed safely and within stipulated time by promoting a pro-active approach.
• Prepare weekly and monthly progress reports.
• Initiate NCR / CAR/ QOR against design, drawing, and specifications. Review corrective actions recommended in non-conformance reports to initiate and verify corrective actions to prevent the reoccurrence of non-conformity.
• Ensure that all inspections and tests are recorded on the appropriate form or checklist, as indicated on the relevant ITP, and all documentation is filed safely and securely.
• Co-ordinate with the Site / Independent Testing Laboratory to follow up on onsite Lab Testing frequency as per requirements of project related specifications, ASTM, BS, and ISO Standards.
• Inspection & Supervision of construction activities at a site like Concrete Mix design trials and relevant testing of concrete ingredients as specified in Project Specification.
• Coordinate with the contractor representative and Site In-charge for inspection and meeting about quality problems including the closure of the Non-Compliance Report.
• Ensure the works being executed as per the drawings, specifications and comply with the quality norms.
• Preparation and Revising of Quality Control procedures, Inspection & Test Plans (ITPs’) & Quality Control Checklists.
• Inspection & Supervision of Road Activities like Sub Base, Base Course, Prime Coat, Tack Coat and core cutter testing of Asphalt pavement.
• Responsible for checking the suitability of road material like Sub Grad, Sub Base, and Base Course as per Project design and specification.

Civil Maintenance Division Project Supervisor at Abu Dhabi Gas Industries Ltd. Gasco
  • United Arab Emirates - Abu Dhabi
  • September 2013 to November 2016

• Preparation of scope of work for maintenance projects.
• Managed two-year, $5M project till successful completion.
• Monitor, inspect and certify the temporary and permanent Works ensuring they are constructed following the provisions of the Contract, including the Contractor’s approved Quality Assurance Plan, Health and Safety Plan, Environmental Management Plan and Method Statements.
• Managed and directed a team of 3 engineers, completing all projects on-time and under budget.
• Providing guidance and direction to subordinates, including setting performance standards and monitoring performance.
• Maintained the quality of work to ensure strict adherence to Project Regulations.
• Achieved 20% cost savings by improving solutions, researching lower prices, controlling quality, and maintaining schedules.
• Directed and Participated in surveying to lay out installations and establish reference points, grades, and elevations to guide construction.
• Estimate quantities and cost of materials, equipment, or labour to determine project feasibility.
• Monitoring, controlling resources and overseeing the spending of Budget.
• Supervision of day-to-day maintenance activities and plan implementation as per Maximo.
• Estimating quantities, determining the time, costs, resources, and materials needed to perform a work activity.
• Detailed monitoring of civil assets of plant indignity as well as marine structures related to civil.
• Mobilization review of contractors, In-house manpower and resources required for maintenance work and shutdown (Planned and unplanned Activities.)
• Evaluate industrial operations for compliance with permits or regulations related to the generation, storage, treatment, transportation and disposal of hazardous materials or waste.
• Participating in emergency response procedures to contain, secure, or clean spills of hazardous materials.
• Initiating purchase request in Maximo for Civil Material and equipment for production operations.
• Budget monitoring and commercial proposal preparation and follow-up with senior management for approval.
• Attending divisional progress review meetings and project kick-off meeting.
• Review Method Statements against project specifications.
• Follow up of Project Designed General specification related testing’s and Procedures.
• Determines project objectives and contributes to the development of a comprehensive project plan.
• Routinely analyse, evaluate and forecast the current project status against the baseline schedule, assessing the impacts of design or construction changes to the schedule.
• Perform and coordinate inspections and determine quality assurance testing models of raw materials and finished products.

QA/QC Engineer Civil at AL JABER GROUP
  • United Arab Emirates - Abu Dhabi
  • July 2012 to August 2013

• Inspecting all the bridge activities, such as Bridge Piling, scaffolding, Form work, Steel reinforcement, Post Tension, Concreting, finishing’ and Handing over.
• Conducting the meetings with project execution team to achieve the project quality requirements.
• Attending the consultant inspections and getting jobs approval.
• Continuous contribution to site team to get the job done as required.
• Preparation of Concrete Pre-Placement Report.
• Site Supervision & Quality Control
• Inspection/ Testing of all materials for projects as per Designed General specification, ACI, ASTM, BS.
• Issuance of NCR/ Quality observations for quality control as per standards, codes and specifications.
• Preparation and checking of daily and weekly progress reports.
• Ensure the execution of the Projects according to the Design, Qualitatively as well as quantitatively.
• Attending FSI walk through and note their points and kill those points immediately.
• To coordinate with Surveyors for centerline and marking of foundation for erection of steel structure.
• To ensure the QHSE always keep close eye on work.
• Control & check Incoming material.
• Inspection of Structural concrete: rebar’s size, spacing and placing, clear covering, structural size as per drawing.
• Concrete temperature, Air Contain, Slump, compaction and vibrating. Concrete surface smoothness
• Preparation of Pre-Final & final punch list & Rework Items for the finished projects.
• Preparation of Initial, Follow-up, Pre-Final, Final Inspection documents
• Prepares accurate and complete Daily Report for tracking crew sizes, work completed, weather, delays and other situations on-site that must be documented.

QA/QC Engineer Civil at Descon Engineering, Abu Dhabi UAE
  • United Arab Emirates - Abu Dhabi
  • November 2010 to June 2012

• Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.
• Initiate NCR / CAR/ QOR against non-conformance / observation of system, design, drawing and specifications. Review corrective actions recommended in non-conformance reports, initiate and verify corrective actions to prevent reoccurrence of non-conformity.
• Ensure that all inspections and tests are recorded on the appropriate form or checklist, as indicated on the relevant ITP, and all documentation is filed in a safe and secure manner.
• Co-ordinate with the Site / Independent Testing Laboratory to follow up of onsite Lab Testing frequency as per requirements of project related specifications, ASTM, BS, and ISO Standards.
• Performs quality activities on an assigned project to ensure that products or services provided are in accordance with the quality requirements.
• Regularly interacts with representatives from a variety of functional groups, including program management, design/engineering, purchasing, construction, and other personnel.
• Inspection/ Supervision of construction activities at site like, Concrete Mix design trials and relevant testing of concrete ingredients supervision of all testing’s as specified in Project Specification, Supervision of Infrastructure works, Landscaping.
• Carry out in situ testing if and when required to ensure compliance with specifications.
• Arrange for samples to be adequately stored until testing when required.
• Inspection/ Testing of all materials for projects as per Designed General specification, ACI, ASTM, BS.
• Preparation and checking of daily and weekly progress reports.
• Ensure the execution of the Projects according to the Design, Qualitatively as well as quantitatively.
• Attending FSI walk through and note their points and kill those points immediately.
• To coordinate with Surveyors for centerline and marking of foundation for erection of steel structure.
• To ensure the QHSE always keep close eye on work.
• Control & check Incoming material.

QA/QC Inspector Civil at Descon Engineering, Doha Qatar
  • Qatar - Doha
  • May 2008 to November 2010

• Inspection of Structural concrete: rebar’s size, spacing and placing, clear covering, structural size as per drawing.
• Ensure that all inspections and tests are recorded on the appropriate form or checklist, as indicated on the relevant ITP, and all documentation is filed in a safe and secure manner.
• Co-ordinate with the Site / Independent Testing Laboratory to follow up of onsite Lab Testing frequency as per requirements of project related specifications, ASTM, BS, and ISO Standards
• Concrete temperature, Air Contain, Slump, compaction and vibrating. Concrete surface smoothness
• Preparation of Pre-Final & final punch list & Rework Items for the finished projects.
• Preparation of Initial, Follow-up, Pre-Final, Final Inspection documents
• Prepares accurate and complete Daily Report for tracking crew sizes, work completed, weather, delays and other situations on-site that must be documented.
• Preparation of Construction deficiency tracking log with AutoCAD & PDF drawing.
• Implement the quality control plan (QCP) as required for the project jobsite.
• Inspection/ Supervision of all construction activities at site like Equipment Octagonal foundations, compressor foundations, Pipe Sleepers, Miscellaneous foundations of Pipe Racks and cooling fan, Instrument and Equipment shelter, Operation & maintenance shelter, Inergen shed, Sub-station Building, Sulphur pit, Interceptor Flush sump, Pump foundation, Exchanger foundations, closed drain drum sump, oil sumps, Elevated/ Table top Structures, Flare foundation, Vessel foundation, Sulphur Pit Manholes, Catch Basins, Valve Boxes, Grouting, , Drains, Ditches, Paving, Underground works Earth Work like Excavation & back filling, Ridged & flexible Paving, Survey Works & Leveling.

Site Engineer at Habib Rafiq (PVT) LTD
  • Pakistan
  • May 2007 to May 2008

• Achieve daily, weekly and monthly progress targets provided by the Construction Manager.
• Fully appraise with following day’s work in advance and discuss resources requirements with management.
• Interfaces with planning department regarding Work Schedules and progress updates.
• Ensure the execution of the Projects/structures according to the Design & specifications.
• Complete Supervision of construction activities at site like Pipe racks foundation / sleeper, Residential facilities, Duct Banks, close drain Pit Foundations, Elevated Structures, Manholes, culverts, Earth Work Back filling, Ridged & flexible paving

Education

Bachelor's degree, Civil
  • at Preston university of Pakistan
  • September 2013

Bachelor of Technology Hons...

Diploma, Civil
  • at University of Engineering and Technology Rasul
  • August 2007

High school or equivalent, F.S.C (Pre-Engineering)
  • at Govt. Post Graduate College Mandi Bahauddin Pakistan
  • April 2003

Specialties & Skills

Civil Engineering
Inspection
Supervisory Skills
Surveying
BUDGETING
CONSULTING
EXECUTIVE MANAGEMENT
MATERIALS MANAGEMENT
MEETING FACILITATION
MICROSOFT WORKS
AUTOCAD
auditing

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.


Languages

Arabic
Beginner
English
Expert
Hindi
Intermediate
Punjabi
Native Speaker
Urdu
Native Speaker

Training and Certifications

Quality Management system Lead Auditor - ISO 9001:2015 (Certificate)
Date Attended:
June 2023
Valid Until:
June 2028
Lean Awareness (Certificate)
Date Attended:
May 2021
Operations Management: Management of Quality (Certificate)
Date Attended:
May 2020
Safety Leadership for Front Line Supervisor by Petroleum Development Oman (PDO) | Shell Oman Oman (Certificate)
Date Attended:
November 2019
ISO Internal Auditor Course (ISO 14001:2004, Environmental Management System ISO 19011:2011) (Certificate)
Date Attended:
January 2014
Management skills, Institute of Leadership Management-UK (ILM) (Certificate)
Date Attended:
August 2009

Hobbies

  • Badminton
  • Watching movies
  • Swimming
  • Listening to music
  • Cricket,