Electrical Engineer-700 MW Combined Cycle Power Plant Operation
Sogex Oman
Total years of experience :15 years, 10 Months
• Plant start up, Shut down and Operation of 700 MW CCPP.
• Operation of 220MW X 2 Frame 9 FA GE make Gas Turbine.
• Operation of 130MW X 2 BHEL make Steam Turbine.
• Operation of BOP and HRSG make BHEL on MAX DNA.
• Operation of CCW, ACW system.
• Working experience on Mark-VI E DSC.
• RO DM Plant-224 Cum/Hr.
• Operation of 220 KV Switchyard.
• Responsible for day to day activities of plant.
40 MW CPP
34 MW CCPP
Worked as an Electrical Project Engineer in 4000 MW CCPP project
• Prepare and review engineering plans.
• Execute the project, ensuring compliance with safety requirements and electrical standards.
• Prepared, reviewed and modified contract documents and specification.
• Write report detailing current system and changes to each site.
• To check the entire work as according to approved drawings.
• Manage / coordinate with civil engineers and mechanical engineers.
• Installation, testing and commissioning of Transformer(310 MVA, 13.8 KVA, 4.16 KVA), S/W gear(13.8KV, 4.16KV ABB, EMERSON, SIEMENS), GCB(ALSTHOM), LA, HT Panel board.
• Commissioning activities of 222 MW GT-SIEMENS.
• Installation, testing and commissioning of cathodic protection of service tank, anode protection, SWI system (Samgong).
34 MW CCPP