Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
shamsheer mp, E&I QC Inspector

shamsheer mp

E&I QC Inspector

Saudi Arabia

High school or equivalent, Electrical & Electronics Engineering

Work experience

Total years of experience: 11 years, 11 months

E&I QC Inspector

November 2021 - May 2022

November 2021 - May 2022

NPCC/Mermaid- CRPO#51, 52 and 54
(3)

Job role:
Engineering

June 2021 - October 2021

June 2021 - October 2021

Material receiving inspection for Umbilical and accessories
•Inspection for the Installation of Umbilical, J-tube seal, Bend restrictor, Uraduct and Flying leads
•Inspection for Umbilical cable glanding and termination, Hydraulic hose connection etc.
•Witness for the Pre and Post testing of umbilical(Both Cable and Hydraulic hose)
•Witness for the SAT for Hydraulic power unit.
•Witness for the Integration functional test for the Subsea valve (Hydraulic operated)
•Inspection for the galvanic anode installation in different Flexible flow lines

Electrical Engineer

May 2021 - June 2021

May 2021 - June 2021

•Familiar and experienced with Saudi Aramco standards and specifications.
•Involved in reviewing ITP, QCP and method of statements.
•Reviewing the Contractor and Sub contractor Inspection and test plan, Inspection checklist, Material certificates, Vendor/Manufacturer documents, Method of statements, Energization package, Solo run package, Loop folder and other Pre-commissioning documents.
•Preparation of ITP and inspection checklist based on the project scope, Specification and client requirement.
•Preparation of two-week look-ahead schedule, Maintaining of Calibration log, RFI log and LBE log.
•Providing contractor reply to the Company LBE/Pro-active notification.
•Be a part of Hand-over documents preparation.
•Conduct daily surveillance to monitor the construction activities, provide the necessary quality supports and issue the proactive notification and Internal NCR to execute the project as per the IFC drawing, project specification and Company/International standards.
•Follow up and close out the INCR and standard violation with proper documentation.
• Provided relevant quality supports during weekly quality meeting and Project meeting.
•Identify and eliminate the cause of non-conformities, develop and implement plans and program to train construction team in lean techniques and best practices. Analyze the non-conformities and establish prevention measures for all phase of construction activities.
•Attending walkthrough with client to show the progress at an abstract level in each system/sub system

Job role:
Electrical Engineering

QA/QC Inspector

February 2020 - June 2020

February 2020 - June 2020

Job Descriptions:
•Preparation of QCP for Electrical and Cathodic protection activities
•Verification of Method of statement for Electrical and Cathodic protection activities.
•Material receiving and preservation inspection for Electrical and Cathodic protection items/equipment’s.

•(1) Position: Electrical

Job role:
Quality Control

Consultant Electrical Engineer

December 2018 - February 2020

December 2018 - February 2020

TKS/ FARABI PETROCHEMICAL, Jubail, KSA (Expansion project)

Job role:
Electrical Engineering

QA/QC Inspector

November 2018 - December 2018

November 2018 - December 2018

Job Descriptions:
•Preparation of quality control procedure, ITP and related quality verifying documents.
•Material receiving and preservation inspection for Transformers, Motors and electrical panels.
•Inspection of installation of Power transformer, MV and LV switchgear, MCC, MV and LV cables, Lighting and power panel, Cable tray and conduits, Lighting and receptacles, Grounding, Glanding and termination etc.
•Witness for the SAT testing of Power transformer, MV and LV switchgear, Capacitor panel and other LV panels
•Witness for the Motor solo run test, Functional test for LCS, Grounding test etc.

•(1) Position: Electrical

Job role:
Quality Control

QA/QC Inspector

August 2017 - August 2018

August 2017 - August 2018

Job Descriptions:
•Installation Inspection for MV and LV cables, Transformers, LV panels, lighting fixtures, Grounding system etc.
•MV Cable splicing and termination activities and testing of cables (MV and LV)
•Conduct quality tool box meeting, Issuing of pro-active notifications and Internal NCR.
•SAT test for the Power transformer and LV panels.

•(1) Position: Electrical

Job role:
Quality Control

QA/QC Inspector

January 2017 - June 2017

Cegelec

United Arab Emirates

January 2017 - June 2017

Job Descriptions:
•Installation Inspection for MV and LV cables, Transformers, SF6 Switch gear, LV panels, lighting fixtures, Grounding system, Cable tray, Conduit, etc.
•Installation inspection for Telecom equipment like Access control system, MIDS system, FOFSS, FACP and other telecom panels etc.
•MV Cable splicing and termination activities and testing of cables (MV and LV)
•Conduct quality tool box meeting, Issuing of pro-active notifications and Internal NCR.
•SAT test for the Power transformer and LV panels.
•Pre-commissioning of Telecom system like Access control system, MIDS system, FOFSS.
•Preparation of quality control procedure, ITP, Method of statement, Energization package and assist for the preparation of project record book.

•(1) Position: Electrical

Company industry:
Oil & Gas
Job role:
Quality Control

Electrical Engineer(Consultant)

October 2016 - December 2016

October 2016 - December 2016

Job Descriptions:
•Inspection of installation and testing of 230 KV transformer, Shunt reactor, GIS Switchgear system etc.
•Inspection of 230 KV and 115 KV OHTL

Job role:
Electrical Engineering

QA/QC Inspector

January 2016 - August 2016

January 2016 - August 2016

Verification and approval of technical submittals, Drawing, Supervision and quality verification of all construction and Commissioning activities.

•(1) Position: Electrical

Job role:
Quality Control

May 2015 - November 2015

May 2015 - November 2015

Material receiving and preservation inspection for Transformers, Motors and electrical panels.
•Inspection of installation of Power transformer, MV and LV switchgear, MCC, MV and LV cables, Lighting and power panel, Cable tray and conduits, Lighting and receptacles, Grounding, Heat tracing system, Glanding and termination etc.
•Inspection for the heat tracing system and cathodic protection system
•Witness for the SAT testing of Power transformer, MV and LV switchgear other LV panels
•Witness for the Motor solo run test, Functional test for LCS, Grounding test etc

QA/QC Inspector

September 2014 - May 2015

September 2014 - May 2015

Job Descriptions:
•Daily surveillance inspection in the construction area and lay-down with client inspector and make sure works are carrying as per the project specification and drawing, If not Initiate negative finding(NCR) .
•Verifying the all commissioning procedure and implementation of the same.
•Mitigation of SABIC flows (Something which result delay in project or injury during commissioning activities in previous major projects) by the proper verification and implementation of MOS and Energisation procedure.

•(1) Position: Electrical

Job role:
Quality Control

September 2013 - February 2014

September 2013 - February 2014

Material receiving and preservation inspection for Transformers, Motors, Battery, UPS and electrical panels.
•Inspection of installation of Power transformer, MV and LV switchgear, MCC, UPS and Battery banks, MV and LV cables, Lighting and power panel, Cable tray and conduits, Lighting and receptacles, Grounding, Heat tracing system, Glanding and termination etc.
•Witness for the SAT testing of Power transformer, MV and LV switchgear, UPS and Battery banks and other LV panels
•Witness for the Motor solo run test, Functional test for LCS, Grounding test etc.
•Preparation of quality control procedure, ITP, Method of statement, Energization package and assist the preparation of Dossier

Lead Electrical Engineer

September 2012 - August 2013

Concord cooperation Private limited (SATORP)

Saudi Arabia

September 2012 - August 2013

Responsible for the installation and commissioning of 34.5 KV substation equipment’s, Transformers, MV and LV motors, UPS and Battery, LV and MV cables, Lighting and Receptacles, Grounding and lightning arrestors, Fire alarm and HVAV instruments, Building telecom equipment’s, Heat tracing, Cathodic protection etc

Job role:
Electrical Engineering

Electrical Engineer/Planning Engineer

December 2010 - July 2012

HHZ (Saudi Electric Company)

Saudi Arabia

December 2010 - July 2012

Maintenance of plant electrical equipment’s motors and instruments.
•Over hauling and testing of MV and LV motors.
•Installation of radar level transmitter, Tank gauging system, Field bus and FOC cables, Automatic damper control system, Chimney monitoring system etc.
•To create PM, CM work orders and weekly schedule by using the CMMS software.
•To create shutdown work order to the different department/contractors and coordinate for the proper execution of the work.
•Identify requirement for manpower / material / support services in concurrence with area maintenance
•Schedule the shutdown work by using the MS project and closely coordinate with contractors, operation and maintenance department.
•Conduct site visits with maintenance supervisors and maintenance engineers / specialist to analyze the job required and identify the activities.
•To conduct daily planning meeting with Operations and maintenance and agree on the schedule of the new notifications raised and update the progress of ongoing jobs on daily basis.
•To prepare the daily updating of the work during the shutdown.
•To prepare the materials for the shutdown work by coordinating with maintenance and Engineering.
•To track the material availability in the warehouse by using SAP network and to make purchase order for the required material.
•To create MIR for the responsible department/contractor.
•Issue “Material Return Request form” for excess materials after completion of job.
•Coordinate and follow up with all material and service groups for Plant / Unit / Major Equipment shutdown occurred or expected in near future.
•Closing of all the work order created and to ensure it has added all the inspection details for the history of equipment.
•Coordinate with the contractors for the Final preparation of shutdown report.
•Responsible for preparing overall project schedule by using MS project.
•Responsible for the preparation of weekly required project materials.
•Responsible for the daily updating of project completion in different field.
•Responsible for the preparation of daily project expense.
•Responsible for the submitting the daily updating to client

Job role:
Engineering

Testing and Commissioning Engineer

July 2010 - December 2010

July 2010 - December 2010

Saudi Aramco North park office complex, Daharan, KSA
(3)

Job role:
Engineering

Electrical Engineer

July 2008 - July 2009

July 2008 - July 2009

Abha for Engineering and Construction (Consultant), KSA
(3)

Job role:
Electrical Engineering

Assistant Electrical Engineer

October 2007 - June 2008

Kerala Electricity board

India

October 2007 - June 2008

Operation and maintenance of 66 KV substation.

Company industry:
General Engineering Consultancy
Job role:
Electrical Engineering

Education

MG UniversityGovernment Engineering college

January 2007

January 2007

High school or equivalent, Electrical & Electronics Engineering

India

GPA (point): 8.3 out of 20

GPA (point): 8.3 out of 20

:

MG UniversityGovernment Engineering college

January 2007

January 2007

Bachelor's degree, Electrical & Electronics Engineering

India

GPA (point): 8.3 out of 20

GPA (point): 8.3 out of 20

:

Skills

Indoor
Expert
Indoor
Expert
Instrumentation
Expert
Instrumentation
Expert
Inspection
Expert
Inspection
Expert
Installation
Expert
Installation
Expert
Commissioning
Expert
Commissioning
Expert
CABLING
Expert
CABLING
Expert
CLOSING
Expert
CLOSING
Expert
FUNCTIONAL
Expert
FUNCTIONAL
Expert
GRAPHIC DESIGN
Expert
GRAPHIC DESIGN
Expert
LIGHTING
Expert
LIGHTING
Expert
MICROSOFT OFFICE SPECIALIST
Expert
MICROSOFT OFFICE SPECIALIST
Expert
QUALITY
Expert
QUALITY
Expert
QUALITY CONTROL
Expert
QUALITY CONTROL
Expert
RECEIVING
Expert
RECEIVING
Expert
SAT
Expert
SAT
Expert
Indoor
Expert
Indoor
Expert
Instrumentation
Expert
Instrumentation
Expert
Inspection
Expert
Inspection
Expert
Installation
Expert
Installation
Expert
Commissioning
Expert
Commissioning
Expert

Training and Certifications

Training
ISO 9001-2015
IQMS
H2S
safety Unlimited
Bosiet
SMTC Global