Assistant Resident Engineer
Mott MacDonald Pakistan
Total years of experience :10 years, 2 Months
Sustainable bus rapid transit corridor project consisting of elevated fly overs, under passes, cycle track and infrastructure having rigid pavement. This project will be sustainable, low Carbon, and climate resilient urban transport system in the capital. Cost value Rs.51 billion.
Assisting resident engineer in design, site related issues, safety, financial recommendations, and quality control.
Overseeing the administration of project’s construction cycle including technical and financial.
Liaise and coordinate with all stake holders related to project.
Ensure the contractor complies with project specification and approved shop drawings.
Follow up S.H.E standards and enforce contractor to comply and implement all safety standards and procedures.
Follow up project schedule and timely completion within budget.
Attending and contributing to project review and progress meetings.
Review project documents (drawings, materials and technical submittals) and ensuring they comply with the original design intent.
Municipal services program US Aid funded project. Package. Cost value Rs.701 M
The Project includes the rehabilitation of existing sewer, storm water, and sanitation networks and construction of public toilets.
Duties and responsibilities:
Assigned to review and comment on shop drawings submitted by contractor.
•Assisted resident engineer regarding site related issues and suggested a viable solution for resolving these issues.
•Supervised all field tests required for storm water, foul water, and potable water mains.
Ministry of Housing Saudi Arabia. Construction of collector and local roads, Infrastructure included of treated sewage effluent (TSE), Irrigation and sewage pump station, potable, storm water and sewer networks (vitrified clay pipes 200 to 400 mm dia) power substations, STP, including gullies/catch basins, electrical, telecom ducts & chambers. Cost value. SAR.505 M.
•Reviewed and commented on shop drawings.
•Supervision of Air pressure, Mandrel, mirror tests, disinfection and chlorination of sewer mains. Supervision of Hydro static pressure tests for Storm, Potable and Irrigation networks.
•Reported and assisted construction manager on site and design related issues.
•Communicated and liaised effectively with colleagues and bridging the relationship with client, contractor and other stake holders associated with the project.
•Monitored the compliance of H.S.E measures and implementation on site.
•Followed up work progress on site as per project schedule and ensured works have been performed as per specification and approved drawings.
Water and Sanitation Hygiene project to provide WASH facilities to the conflict and flood affected areas. Cost value. Rs.38.00 Million.
•Took part in WASH project preparation, identifying beneficiaries, discussing with communities and local authorities and identifying work sites.
•Collected and analyzed the information in order to help in the planning of the project implementation.
•Ensured the Water and Sanitation design/plans are followed and the Bill of Quantities respected.
FDPLD (FATA Development Program Livelihood Development) US.AID
Sustainable bus rapid transit corridor project consisting of elevated fly overs, under passes, cycle track and infrastructure having rigid pavement. This project will be sustainable, low Carbon, and climate resilient urban transport system in the capital. Cost value Rs.51 billion.
•Assisting resident engineer in design, site related issues, safety, financial recommendations, and quality control.
•Overseeing the administration of project’s construction cycle including technical and financial.
•Liaise and coordinate with all stake holders related to project.
•Ensure the contractor complies with project specification and approved shop drawings.
•Follow up S.H.E standards and enforce contractor to comply and implement all safety standards and procedures.
•Follow up project schedule and timely completion within budget.
•Attending and contributing to project review and progress meetings.
•Review project documents (drawings, materials and technical submittals) and ensuring they comply with the original design intent.
- Re construction of devastated school buildings and infrastructures development.
•Monitored field activities on daily basis and ensured the field works commenced and carried out according to the approved drawings and specification.
•Coordinated with field staffs and other stake holders associated with project.
•Pointed out the field and design related issues and abetted project manager in resolving these issues.
ACTED International
-Rehabilitation of existing water channels and irrigation structures to improve water efficiency and control water losses.
•Conducted detailed survey and assessment of the existing irrigation structures.
•Conducted training sessions for water users association (WUA) on various aspects of irrigation structures effecting the production of crops.
-2. Deconstruction of Hard rock Café and Palm hotel, soft stripping, and safe removal of asbestos containing materials.
•Supervised the entire demolition activities and safe removal of Asbestos containing materials.
•Ensured the implementation of LEED (Leader ship in energy and environmental design) procedure.
•Followed up construction waste management plan and Construction environmental plan.
Project: -1. Site wide and UP Town roads and infrastructure at Motor city Dubai.
Cost Value: AED.280 M.
•Construction supervision of carriage way, internal roads, car parking, landscaping, earthwork and inter lock Paving.
•Supervision of sewer, storm water, B.M.S chambers, district cooling, irrigation and potable water network construction and related field tests.
•Construction supervision of 33 &11 KV substations and water leakage test on roof.
•Monitored enforcement of E.H.S requirements on site and issuing NCRs if required.
Bachelor of Technology (Hons)