Total Years of Experience: 19 Years, 9 Months
August 2014
To Present
PROJECT MANGER APPROVED FROM MINISTRY OF ELECTRICITY & WATER
at MIDDLE EAST DEVELOPMENT CO ( MEDCO )
Location :
Kuwait - Hawali
Project of Completion and Maintenance Offices ministry of electricity & water all Kuwait regions (2014/2013 - 4653),
-responsible for managing the project as project manager duties shop drawings approvals, quality control, submitting request actions responsible for supervision specifications, payments
-MAIN CONTRACTOR: MIDDLE EAST DEVELOPMENT CO ( MEDCO )
-CLIENT MINISTRY OF ELECTRICITY & WATER
-CONSULTANT: MINISTRY OF ELECTRICITY & WATER
-CONTRACT VALUE: 900, 000 (KUWAITI DINAR)
-responsible for managing the project as project manager duties shop drawings approvals, quality control, submitting request actions responsible for supervision specifications, payments
-MAIN CONTRACTOR: MIDDLE EAST DEVELOPMENT CO ( MEDCO )
-CLIENT MINISTRY OF ELECTRICITY & WATER
-CONSULTANT: MINISTRY OF ELECTRICITY & WATER
-CONTRACT VALUE: 900, 000 (KUWAITI DINAR)
August 2011
To August 2014
site engineer
at Dar Al –Dowailah for Engineering Consults and Construction Mangers
Location :
Kuwait - Al Kuwait
- Have an approval from PAAET
- Works as a Consultant Site Engineer resposible for quality control, Request for inspection and approval actions, , Job site instructions, Material delivery notes actions, Transmittal actions, Non conformance reports, site supervision all civil items, monthly & daily reports developing, Payments review
A Project of (29, 485, 464.372 K.D) this project consists of 3 buildings (Basement -Ground & first-second-lower roof-upper roof) and contain the flowing items :
- General Site works (Dewatering, Excavation shoring system, Excavation and back fill works, Landscape works, Traffic marking &Signs, Plants).
- Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
- Erection and installations precast, prestress element
- Finishing works (Block works, screed works, Plaster, painting, Marble and Granite works, External cladding of precast, Terrazzo and ceramic works, Gypsum board)
- Thermal-moisture protection(Raft, External wall, water tank, wet areas, Roof)
- Metal & wood and aluminum doors, Aluminum windows, Metal handrails
- Works as a Consultant Site Engineer resposible for quality control, Request for inspection and approval actions, , Job site instructions, Material delivery notes actions, Transmittal actions, Non conformance reports, site supervision all civil items, monthly & daily reports developing, Payments review
A Project of (29, 485, 464.372 K.D) this project consists of 3 buildings (Basement -Ground & first-second-lower roof-upper roof) and contain the flowing items :
- General Site works (Dewatering, Excavation shoring system, Excavation and back fill works, Landscape works, Traffic marking &Signs, Plants).
- Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
- Erection and installations precast, prestress element
- Finishing works (Block works, screed works, Plaster, painting, Marble and Granite works, External cladding of precast, Terrazzo and ceramic works, Gypsum board)
- Thermal-moisture protection(Raft, External wall, water tank, wet areas, Roof)
- Metal & wood and aluminum doors, Aluminum windows, Metal handrails
February 2014
To August 2014
CONSULTANT ENGINEER (STRUCTURAL ENGINEER APPROVED FROM MINISTRY OF PUBLIC WORKS) ROAD ENGINEERING SE
at At DAR AL DOWAILAH FOR ENGINEERING CONUSLTS AND CONNSTRUCTION MANGERS
Location :
Kuwait - Al Jahra
Project of Construction & Completion and Maintenance of Roads and Interchanges on the Central Part of Jahra Road (RA/212),
- Project 7, 900 kilometer length includes 3 stages, stage 1 named (IC7), stage 2 named (IC8), stage 3 named (IC9) each stage contains bridge with 2 ramps including overlays in between the stages, each stage consists of number of piers and abutments walls where ramps of the bridge will start, each pier contain 2 separate footing, each footing have 2 or 3 columns according to type of stage, box girder after finishing all columns with top parts will be provided with cables prestressing post tension type.
-responsible for shop drawings approvals, quality control, inspection request actions responsible for supervision of concrete works ( steel reinforcement, formwork & scaffolding, casting ) of all elements (footing, pile cap, columns, decks slab, abutments, counter slab, box girder), Earthworks (excavation, backfilling, subgrade, sub base layers), bearings installation, mechanically stabilized earth wall installing, asphalt removal, asphalt layers providing, water proofing membrane for all previous items, prestressing cables refer to specifications, utilities
-MAIN CONTRACTOR: COMBINED GROUP CONTRACTING COMPANY
-CLIENT: MINSITRY OF PUBLIC WORKS
-CONSULTANT: ORIENTAL CONSULTANTS COMPANY LIMITED IN ASSOCIATION WITH DAR AL DOWAILAH ENGINEERING CONSULTANTS
-CONTRACT VALUE: 45, 797, 412.518 (KUWAITI DINAR)
- Project 7, 900 kilometer length includes 3 stages, stage 1 named (IC7), stage 2 named (IC8), stage 3 named (IC9) each stage contains bridge with 2 ramps including overlays in between the stages, each stage consists of number of piers and abutments walls where ramps of the bridge will start, each pier contain 2 separate footing, each footing have 2 or 3 columns according to type of stage, box girder after finishing all columns with top parts will be provided with cables prestressing post tension type.
-responsible for shop drawings approvals, quality control, inspection request actions responsible for supervision of concrete works ( steel reinforcement, formwork & scaffolding, casting ) of all elements (footing, pile cap, columns, decks slab, abutments, counter slab, box girder), Earthworks (excavation, backfilling, subgrade, sub base layers), bearings installation, mechanically stabilized earth wall installing, asphalt removal, asphalt layers providing, water proofing membrane for all previous items, prestressing cables refer to specifications, utilities
-MAIN CONTRACTOR: COMBINED GROUP CONTRACTING COMPANY
-CLIENT: MINSITRY OF PUBLIC WORKS
-CONSULTANT: ORIENTAL CONSULTANTS COMPANY LIMITED IN ASSOCIATION WITH DAR AL DOWAILAH ENGINEERING CONSULTANTS
-CONTRACT VALUE: 45, 797, 412.518 (KUWAITI DINAR)
October 2010
To August 2011
site engineer
at HOT ENGINEERING & CONSTRUCTION CO,( SUB CONTRACTOR AL QERYAFI FOR GENERAl TRADE & CONTRACTING
Location :
Kuwait
A project of construction, completion and maintenance a road between kabd and wafra (56 km )
Have an approval from MPW
Infra structure engineer .
Have an approval from MPW
Infra structure engineer .
January 2009
To October 2010
site engineer
at Al Hamra Kuwait company
Location :
Kuwait
Scope:
Prepare Design specifications
Have an approval from Kuwait university shuwaikh campus
Responsible for (excavation works-concrete works-external and internal works-plumping works)
Responsible for (Submittals-variation order-Bill of quantities-Shop drawing)
General Site works (Dewatering, Excavation shoring system, Excavation and back fill works).
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
Finishing works (Block works, screed works, Plaster, painting, Marble and Granite works, External cladding of precast, Terrazzo and ceramic works, Gypsum board)
Thermal-moisture protection(Raft, External wall, water tank, wet areas, Roof)
Metal & wood and aluminum doors, Aluminum windows, Metal handrails
Prepare Design specifications
Have an approval from Kuwait university shuwaikh campus
Responsible for (excavation works-concrete works-external and internal works-plumping works)
Responsible for (Submittals-variation order-Bill of quantities-Shop drawing)
General Site works (Dewatering, Excavation shoring system, Excavation and back fill works).
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
Finishing works (Block works, screed works, Plaster, painting, Marble and Granite works, External cladding of precast, Terrazzo and ceramic works, Gypsum board)
Thermal-moisture protection(Raft, External wall, water tank, wet areas, Roof)
Metal & wood and aluminum doors, Aluminum windows, Metal handrails
August 2007
To January 2009
site engineer
at Al Raya company
Location :
Kuwait - Joint Operations Wafra
Respomsible of A factory of dates (steel structures) cost (2, 000, 000 kd)
Prepare Design specifications
Responsible for (excavation works-concrete works-external and internal works-plumping works)
General Site works (Dewatering, Excavation shoring system, Excavation and back fill works).
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
Prepare Design specifications
Responsible for (excavation works-concrete works-external and internal works-plumping works)
General Site works (Dewatering, Excavation shoring system, Excavation and back fill works).
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
July 2007
To August 2007
site engineer
at Al Bab AL Kuwaiti general trad.&cont.est company
Location :
Kuwait
A project of center and neighbourd in hateen area ganob el sora (5, 000, 000.000 kd) Responsible foe :
Prepare Design specifications
Responsible for (Submittals-variation order-Bill of quantities-Shop drawing)
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
Prepare Design specifications
Responsible for (Submittals-variation order-Bill of quantities-Shop drawing)
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
June 2004
To June 2007
site engineer
at Maadi Land Investment company
Location :
Egypt - Cairo
a project of 2 towers on nile and respomsible for :
Prepare Design specifications
Responsible for (Submittals-variation order-bill of quantities-Shop drawing)
.
Responsible for (excavation works-concrete works-external and internal works-elevators works-plumping works)
General Site works (Dewatering, Excavation shoring system, Excavation and back fill works).
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
Finishing works (Block works, screed works, Plaster, painting, Marble and Granite works, External cladding of precast, Terrazzo and ceramic works, Gypsum board)
Thermal-moisture protection(Raft, External wall, water tank, wet areas, Roof)
Metal & wood and aluminum doors, Aluminum windows, Metal handrails
Elevator works, Electromechanical work (Fire fighting, Plumbing, HVAC, lighting, Gate control System).
Prepare Design specifications
Responsible for (Submittals-variation order-bill of quantities-Shop drawing)
.
Responsible for (excavation works-concrete works-external and internal works-elevators works-plumping works)
General Site works (Dewatering, Excavation shoring system, Excavation and back fill works).
Cast In situ reinforcement concrete elements (Raft foundation, Retaining wall, Shaft wall, Columns, Stairs, Solid slab, circular water tank).
Finishing works (Block works, screed works, Plaster, painting, Marble and Granite works, External cladding of precast, Terrazzo and ceramic works, Gypsum board)
Thermal-moisture protection(Raft, External wall, water tank, wet areas, Roof)
Metal & wood and aluminum doors, Aluminum windows, Metal handrails
Elevator works, Electromechanical work (Fire fighting, Plumbing, HVAC, lighting, Gate control System).