مجموع سنوات الخبرة :19 years, 5 أشهر

Construction Manager في Gama for trading and contracting
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ مايو 2016

Project: Mivida Facility Management Buildings, Villas and Service Roads (248, 000, 000 EGP) Owner: Emaar Misr

ScopeofEmployer'sContract:
Emaar Misr requires construction of five facility management buildings and service roads for Parcels (49, 19) inside Mivida compound in new Cairo.
Buildings scope includes Earth Works, Concrete Works, Finishing, MEP HVAC and Fire Fighting networks in order to handover turnkey buildings to Emaar.
Villas scope includes all concrete works and external finishing (Plaster, Paints, Stone, Marbel, GRC) for 202 Villas.
Service Roads scope includes civil and asphalt works, mechanical and electrical infrastructure and tie in with existing networks.

SpecificDutiesand Responsibilities/ScopeofWork:
1) Schedule the project in logical steps and budget time required to meet deadlines.
2) Determine manpower and equipment requirements and dispatch workers to construction sites.
3) Inspect and review projects to monitor compliance with specs and safety codes, and other regulations.
4) Interpret and explain plans and contract terms to administrative staff, workers, and clients.
5) Prepare contracts and negotiate revisions, changes and additions to contractual agreements with consultants, clients, suppliers and subcontractors.

Construction Manager في Al-Shalawi International Holding Company
  • المملكة العربية السعودية - الجبيل
  • أغسطس 2013 إلى فبراير 2016

Project: Contract NO. 021-C05R, Development of Buffer Zone
Owner: Royal Commission for Jubail and Yanbu, Royal Commission in Jubail

Scope of Employer's Contract:
The Royal Commission requires development of approximately 54 hectares of land along tareeg 6 for commercial and retail use.
The scope required the following infrastructure systems as well as landscaping:
Roads, Storm Drainage, Potable Water, Sanitary Waste Water, Irrigation, Electrical Power, Street Lighting, Traffic Signaling, Telecommunication and Culverts.

Specific Duties and Responsibilities/Scope of Work:
1) Schedule the project in logical steps and budget time required to meet deadlines.
2) Determine labor requirements and dispatch workers to construction sites.
3) Inspect and review projects to monitor compliance with building and safety codes, and other regulations.
4) Interpret and explain plans and contract terms to administrative staff, workers, and clients.
5) Prepare contracts and negotiate revisions, changes and additions to contractual agreements with
consultants, clients, suppliers and subcontractors.
6) Obtain all necessary permits and licenses.
7) Direct and supervise workers.
8) Study job specifications to determine appropriate construction methods.
9) Requisition supplies and materials to complete construction projects.
10) Take actions to deal with the results of delays, bad weather, or emergencies at construction site.
11) Plan, organize, and direct activities concerned with the construction.
12) Investigate damage, accidents, or delays at construction site.

Construction Manager في Al-Shalawi Int'l Holding Company
  • المملكة العربية السعودية - الرياض
  • سبتمبر 2014 إلى فبراير 2015

Position: Construction Manager (Aramco Approved)
Duration: September 2014 - February 2015
Employer: Al-Shalawi Int'l Holding Company
Project: SITE PREPARATION WORKS AT KHURAIS CENTRAL PROCESSING FACILITIES EXPANTION -CONTRACT BI-10-01506 KHURAIS AL CRUDE INCREMENT (137, 000, 000 S.R.)
Owner: SAUDI ARAMCO

Scope of Employer's Contract:
This project BI-10-01506 will install facilities to produce additional (stabilized barrels) of dry AL crude. It is proposed to install a fifth crude train at Khurais Central Processing Facilities to process an additional AL Crude Oil.
The project scope also includes a Satellite GOSP facility in the vicinity of the Abu Jifan and Mazalij fields south-west of Khurais, along with 65 km of 18” trunklines and 90 km each of 26“ and 16” gas and wet crude pipelines to Khurais.

The duration of site preparation package is 8 months.



Scope of Work:
1. Site Preparation including backfilling and rock excavation for (The main expansion area GOSP-5, new satellite GOSP, New helipad, COGEN Area) 5.50 million Cu.m of backfilling.
2. Asphalted access roads at CPF and satellite GOSP (24 km)
3. Isolation Fence in CPF and COGEN Area (14 km)
4. Re-route of affected existing potable/ fire water line, sewer force main
5. Street Lighting Poles Installation.

Specific Duties and Responsibilities

1. Perform the work following Aramco safety and quality specs, implementing HSE plan, HIP, Quality plan and ITPs
2. Determine manpower and equipment requirements to follow base line construction schedule.
3. Direct and supervise Superintendents and field engineers.
4. Take actions to deal with the results of delays and do recovery actions.
5. Plan, organize, and direct activities concerned with the construction ( Mech., Elec. and Civil).
6. Study job specs to determine appropriate construction techniques and method of statement.

Senior Project Engineer في RME Rowad Modern Engineering
  • مصر - القاهرة
  • مارس 2013 إلى أغسطس 2013

Project: Rehabilitation and Expansion of Cairo International Airport Terminal Building No 2 (TB2)
Owner: CAC (Cairo Airport Company)

Scope of Employer's Contract:
The project is financed by the World Bank (350, 000, 000 $) includes the construction of apron, taxiways and connection ways in 340.000-m2 area; the construction of a new terminal building connected to the current terminal building III and the construction of an airport hotel and a pier block.

Specific Duties and Responsibilities/Scope of Work:
Night Shift senior project engineer to supervise the construction of new terminal building, taxiways and connection ways.

Project Engineer في Saad Mubarak Al-Dossary Contracting Establishment
  • المملكة العربية السعودية - الأحساء
  • يناير 2009 إلى ديسمبر 2012

I- Working from January 2009 until now in Saad Mubarak Al-Dossary Contracting Est. in the following projects:
http:/smdcontracting.com/

1- SAUDI ARAMCO PROJECTS:

• ASPHALT PAVEMENT, RAS TANURA MSC.
• ASPHALT PAVEMENT, ABQAIQ EXPLOSIVE MAGAZINE.
• UPGRADING OF SHEDGUM PIPE YARD.
• FENCE INSTALLATION & ASPHALT Works, YANBU NGL.

Position: Senior Project Engineer

Job Description:
• Estimate the projects costs and profits.
• Make the civil designs and shop drawings.
• Insure that the work was done as per Aramco specs and safety standards.
• Make the HIP (Hazard Identification Plan) for every project.


2- MINISTRY OF MUNICIPAL PROJECTS:

• ROADS AND INFRA STRUCTURES IN AL-JESHA RESIDENTAL COMPOUND.
• IMPROVEMENTS OF JOUF BANI HAJER ENTRANCES.
• ASPHALTING, SIDEWALKS AND STREET LIGHTING IN OMRAN
• ASPHALT PAVEMENT AND SIDE WALKS IN KING FAISAL UNIVERSITY, AL-AHSAA

Position: Senior Project Engineer

Job Description:
• Computing quantities.
• Supervising surveying works.
• Supervising the backfilling, excavation and asphalt pavement works.
• Supervising sidewalks and street lighting.
• Supervising infra structures construction.

lieutenant Engineer في MILITARY ENGINEERING DEPARTMENT, HIGHWAY BRANCH
  • مصر - القاهرة
  • فبراير 2006 إلى أكتوبر 2008

Project: THE INVESTORS ROAD (BETWEEN EGYPT AND LIBYA)
Owner: Ministry of Investment

Scope of Employer's Contract:
The purpose of the project is joining East Owainat in Egypt with the Libyan boundaries to improve the commercial relationship between the two countries with total length is 120km.

Specific Duties and Responsibilities/Scope of Work:
•Do the initial surveying works.
•Computing quantities of excavation, backfill, base course, asphalt and other project items.
•Supervising the backfilling, excavation, base course and asphalt pavement works.


Duration: February 2008 - October 2008
Project: THE ARMY FARMS IN EAST OWAINAT
Owner: Ministry of Defense

Scope of Employer's Contract:
Farms of East 0wainat provide only organic products with huge investments to cultivate over 240, 000 Fadden. The project is constructing 22km of asphalted roads inside the farms.

Specific Duties and Responsibilities:
•Do the initial surveying works.
•Computing quantities of excavation, backfill, base course, asphalt and other project items.
•Make the civil design using computer software and present the shop drawings.
•Supervising the backfilling, excavation, base course and asphalt pavement works.


Duration: February 2007 - February 2008
Project: UPPEREGYPT-REDSEA HIGHWAY
Owner: Ministry of Investment

Scope of Employer's Contract:
The purpose is joining the Upper Egypt governments Asyout, Sohag with Red sea government at Safaga. Total length is 360km and costing 350, 000, 000 $. The scope is to do backfilling, excavation, sub grade, base course, asphalt pavement and guard rails.

Specific Duties and Responsibilities:
•Do the initial surveying works.
•Computing quantities of excavation, backfill, base course, asphalt and other project items.
•Make the civil design using computer software and present the shop drawings.
•Supervising the backfilling, excavation, base course and asphalt pavement works.
•Explosion works in roads construction.


Duration: November 2007 - February 2008
Project: SOHAG INTERNATIONAL AIRPORT
Owner: Ministry of Investment

Scope of Employer's Contract:
The total area is 18 million m2, the main purpose is to increase the development of Sohag, increase the trade and touristic income. The scope of work is to construct the new fence around the airport, patrol roads, land development.

Specific Duties and Responsibilities:
•Supervising the initial surveying works.
•Computing quantities of excavation, backfill, base course and asphalt.
•Make the civil design for the patrol roads using computer software and present the shop drawings.
•Supervising the Fence Construction, backfilling, excavation, base course and asphalt pavement.


Duration: September 2006 - November 2007
Project: ALKORAIMAT - BANISWEF FREEWAY
Owner: Ministry of Transportation

Scope of Employer's Contract:
The purpose is to join the freeway of Helwan-Alkoraimat with Baniswef as a second stage of constructing new highway from Cairo to Aswan with total length is 45km including Excavation and Backfilling, Base course, Asphalting (3 layer), Street lighting and Guard Rails.

Specific Duties and Responsibilities:
•Computing quantities of excavation, backfill, base course, asphalt and other project items.
•Present the shop drawings.
•Supervising the backfilling, excavation, base course and asphalt pavement works.
•Supervising infra structures.


Duration: February 2006 - September 2006
Project: HELWAN - ALKORAIMAT FREEWAY
Owner: Ministry of Transportation

Scope of Employer's Contract:
Construct the second freeway in Egypt with length of 102km and width of 50m as a first stage of constructing new highway from Cairo to Aswan including Excavation and Backfilling, Base course, Asphalting (3 layer), Street lighting and Guard Rails.
Specific Duties and Responsibilities:
•Supervising the backfilling, excavation, base course and asphalt pavement works.

Site Engineer في Al-Handasiah Group for Civil Works
  • مصر - الغردقة
  • يوليو 2004 إلى يناير 2006

Project: Hurgada International Airport Extension
Owner: Ministry of Civil Aviation

Scope of Employer's Contract:
The scope includes construction of taxiways, connection ways and ring road around the airport border

Specific Duties and Responsibilities/Scope of Work:
•Do the initial surveying works.
•Computing quantities of excavation, backfill, base course and asphalt.
•Make the civil design for the patrol roads using computer software and present the shop drawings.
•Supervising backfilling, excavation, base course and asphalt pavement

الخلفية التعليمية

بكالوريوس, civil engineer
  • في Ain Shams University
  • مايو 2004

Bachelor of Civil Engineering from Faculty of Engineering, Ain Shams University GRAD. YEAR: May 2004. MILITARY STATUS: Performed as Engineer Lieutenant in the Egyptian armed forces.

Specialties & Skills

Roadway Design
Highways
Infrastructure Projects
Surveying
Highways and freeways construction.
Form works and Scaffolding for concrete elements / buildings.
LAND DESKTOP, CIVIL3D, AUTOCAD, MICROSOFT OFFICE
Explosion works in roads construction.
• Infra structures (SWW, Storm Water, PW, IRR, Telecommunications, MV and LV,.....)
Infrastructures, soil and asphalt testing

اللغات

العربية
متمرّس
الانجليزية
متمرّس

التدريب و الشهادات

PMP Exam Preparation Course (تدريب)
معهد التدريب:
PME
تاريخ الدورة:
February 2016
المدة:
35 ساعة
ISO 9001:2008 Internal Auditor (الشهادة)
تاريخ الدورة:
March 2010
صالحة لغاية:
April 2010