Senior Electrical Engineer/ MEP Engineer à Burns & McDonnell
  • Qatar - Doha
  • mars 2010 à février 2017

1.Being focal point for MEP work interface between design team and client’s Technical/Project/ Construction Management teams and contractor.
2. Resolve any technical difficulties/work interface arising during construction, authority inspections and incorporating client’s additional requirements; coordinate with design team when design input is required.
3. Coordinate with LEED consultant for implementation of LEED design phase review comments by USGBCI, monitoring of applicable construction activities and LEED commissioning.
4. Assist Project/Construction Management teams to meet project mile stone and assist cost consultants.
5. Coordinate inspection, response to comments and follow up approvals from Authorities having jurisdiction.
6.Prepare contractual correspondences and ensure prompt exchange of correspondences, RFI's & other documents.

MEP/Lead and Senior Electrical Engineer à WSP Middle East
  • Émirats Arabes Unis - Dubaï
  • mars 2007 à février 2010

1.Led group of in house engineers belong to multiple disciplines, was responsible for day-to-day activity of the team and performed as primary contact of MEP consultant team for client/other consultant/contractors.
2.Assisted Construction Management teams to meet construction schedule and represent WSP in site meetings.
3.Coordinated inspection, response to comments and followed up approvals from Authorities having jurisdiction.
4.Reviewed the submittals and inspected mockups/installation/ testing and commissioning for approvals.
5.Resolved technical difficulties/work interface arised during construction and interfaced with design team as required.
6.Prepare contractual correspondences and ensure prompt exchange of correspondences, RFI's & other documents.

MEP Engineer à Burns & McDonnell ( Duabi)
  • Émirats Arabes Unis - Dubaï
  • décembre 2005 à février 2007

1.Reviewed the submittal and inspected mock-ups/installation/ testing and commissioning for approvals
2.Resolved technical difficulties/work interface arised during construction and interfaced with design team as required.
3. Assisted the Resident Engineer in construction/ commercial/technical issues and attended site meetings.

Project Engineer for Electrical works & Project Coordinator for MEP works à Trans Gulf Electro- Mechanical LLC
  • Émirats Arabes Unis - Dubaï
  • juin 1998 à mars 2005

1.Led group of in house engineers belong to multiple disciplines, was responsible for day-to-day activity of the team and performed as primary contact of MEP consultant team for client/consultant/main contractor and sub-contractors.
2.Monitored & coordinated MEP activities and resolved technical/installation issues in advance.
3.Prepared shop drawings, material submittals, method statements and operation & maintenance manual.
4.Prepared and tracked drawing/material/authority tracking schedules as per construction schedule and updated as project evolved.
5.Estimated, prepared and requested assignment of resources in coordination with planning engineer.
6.Floated enquiries, prepared price/technical comparison sheets and assisted purchase department.
7.Ensured that all the works done were in accordance with the approved construction drawings, contract documents, project specifications and all applicable regulations while adhering to approved quality/safety plans.
8.Prepared contractual correspondences, RFIs, progress reports and tracked them for proper exchange.

Site & Estimation Engineer à Arabian construction Company
  • Émirats Arabes Unis
  • juin 1995 à avril 1998

1.Assigned targets for accomplishments and ensured targets were met on daily basis for the assigned electrical groups.
2.Resolved technical/installation/resources issues arised during construction.
3.Inspected, tested installed items/equipment and compiled test results
4.Supported the lead discipline engineer/project manager in the engineering and management functions.
5.Estimation and tendering, including raise tender queries and attend tender/bid meetings.

Installation and Quality Control Engineer à Jospaul Electrolytic Industries, Pune, India
  • Inde - Pune
  • janvier 1994 à février 1995

1.Supervision of Installation of Electrolytic Plant, Carrying out Overall Maintenance of Electrolytic Plant.
2.Quality Control of products

Éducation

Baccalauréat, Electrical & Electronics Engineering
  • à T.K.M.College of Engineering
  • octobre 1993

Specialties & Skills

Commissioning
Testing
Inspection
Installation
MS Office
Auto CAD
Quality Control
HSE system
Team oriented, commitment
Project/Construction Management

Langues

Anglais
Expert
Hindi
Moyen
Malayala
Expert
Arabe
Débutant

Adhésions

USGBC
  • LEED BD+C
  • November 2013

Formation et Diplômes

MMUP (Certificat)
Date de la formation:
April 2016
Valide jusqu'à:
April 2018

Loisirs