Shibu Mathew توماس, Senior Electrical Engineer/ MEP Engineer

Shibu Mathew توماس

Senior Electrical Engineer/ MEP Engineer

Burns & McDonnell

البلد
الهند - كيرالا
التعليم
بكالوريوس, Electrical & Electronics Engineering
الخبرات
22 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 2 أشهر

Senior Electrical Engineer/ MEP Engineer في Burns & McDonnell
  • قطر - الدوحة
  • مارس 2010 إلى فبراير 2017

1.Being focal point for MEP work interface between design team and client’s Technical/Project/ Construction Management teams and contractor.
2. Resolve any technical difficulties/work interface arising during construction, authority inspections and incorporating client’s additional requirements; coordinate with design team when design input is required.
3. Coordinate with LEED consultant for implementation of LEED design phase review comments by USGBCI, monitoring of applicable construction activities and LEED commissioning.
4. Assist Project/Construction Management teams to meet project mile stone and assist cost consultants.
5. Coordinate inspection, response to comments and follow up approvals from Authorities having jurisdiction.
6.Prepare contractual correspondences and ensure prompt exchange of correspondences, RFI's & other documents.

MEP/Lead and Senior Electrical Engineer في WSP Middle East
  • الإمارات العربية المتحدة - دبي
  • مارس 2007 إلى فبراير 2010

1.Led group of in house engineers belong to multiple disciplines, was responsible for day-to-day activity of the team and performed as primary contact of MEP consultant team for client/other consultant/contractors.
2.Assisted Construction Management teams to meet construction schedule and represent WSP in site meetings.
3.Coordinated inspection, response to comments and followed up approvals from Authorities having jurisdiction.
4.Reviewed the submittals and inspected mockups/installation/ testing and commissioning for approvals.
5.Resolved technical difficulties/work interface arised during construction and interfaced with design team as required.
6.Prepare contractual correspondences and ensure prompt exchange of correspondences, RFI's & other documents.

MEP Engineer في Burns & McDonnell ( Duabi)
  • الإمارات العربية المتحدة - دبي
  • ديسمبر 2005 إلى فبراير 2007

1.Reviewed the submittal and inspected mock-ups/installation/ testing and commissioning for approvals
2.Resolved technical difficulties/work interface arised during construction and interfaced with design team as required.
3. Assisted the Resident Engineer in construction/ commercial/technical issues and attended site meetings.

Project Engineer for Electrical works & Project Coordinator for MEP works في Trans Gulf Electro- Mechanical LLC
  • الإمارات العربية المتحدة - دبي
  • يونيو 1998 إلى مارس 2005

1.Led group of in house engineers belong to multiple disciplines, was responsible for day-to-day activity of the team and performed as primary contact of MEP consultant team for client/consultant/main contractor and sub-contractors.
2.Monitored & coordinated MEP activities and resolved technical/installation issues in advance.
3.Prepared shop drawings, material submittals, method statements and operation & maintenance manual.
4.Prepared and tracked drawing/material/authority tracking schedules as per construction schedule and updated as project evolved.
5.Estimated, prepared and requested assignment of resources in coordination with planning engineer.
6.Floated enquiries, prepared price/technical comparison sheets and assisted purchase department.
7.Ensured that all the works done were in accordance with the approved construction drawings, contract documents, project specifications and all applicable regulations while adhering to approved quality/safety plans.
8.Prepared contractual correspondences, RFIs, progress reports and tracked them for proper exchange.

Site & Estimation Engineer في Arabian construction Company
  • الإمارات العربية المتحدة
  • يونيو 1995 إلى أبريل 1998

1.Assigned targets for accomplishments and ensured targets were met on daily basis for the assigned electrical groups.
2.Resolved technical/installation/resources issues arised during construction.
3.Inspected, tested installed items/equipment and compiled test results
4.Supported the lead discipline engineer/project manager in the engineering and management functions.
5.Estimation and tendering, including raise tender queries and attend tender/bid meetings.

Installation and Quality Control Engineer في Jospaul Electrolytic Industries, Pune, India
  • الهند - بونة
  • يناير 1994 إلى فبراير 1995

1.Supervision of Installation of Electrolytic Plant, Carrying out Overall Maintenance of Electrolytic Plant.
2.Quality Control of products

الخلفية التعليمية

بكالوريوس, Electrical & Electronics Engineering
  • في T.K.M.College of Engineering
  • أكتوبر 1993

Specialties & Skills

Commissioning
Testing
Inspection
Installation
MS Office
Auto CAD
Quality Control
HSE system
Team oriented, commitment
Project/Construction Management

اللغات

الانجليزية
متمرّس
الهندية
متوسط
الملايام
متمرّس
العربية
مبتدئ

العضويات

USGBC
  • LEED BD+C
  • November 2013

التدريب و الشهادات

MMUP (الشهادة)
تاريخ الدورة:
April 2016
صالحة لغاية:
April 2018

الهوايات

  • Reading books, Watch Cricket