MANITENANCE MANAGER
Qaiwan Group- Gas Power Plan
Total years of experience :21 years, 10 Months
Supervising a team of engineers and technicians (30 personnel) who
are responsible for troubleshooting and maintenance of 4 units gas
power plant GE frame 9E including compressor, turbine, generator,
auxiliaries and BOP.
* Working closely with other departments (operation, HSE, Planning,
Analyzing)
* Delegating responsibilities and organizing work schedules for day-
shift and night-shift staff members (on call 24-hours)
* Shut down and overhaul planning;
* PM engineering by CMMS and MAXIMO system
* KPI analyzing
* Cost analyzing
* Managing of some pending construction and commissioning project
like GPRS (natural gas pipe line and pressure reduction plant)
PROJECT-CENTRAL PROCESS FACILITIES OF CRUDE OIL AND GAS | Dahuk
- Iraq)
“Rotating Equipment Construction & Commissioning
Superindendant”
Responsible for rotating equipment installation and tanks, vessels,
utility boilers and relevant piping and tubing erection and
assembling and commissioning, start-up and maintenance of units
* Area 8, Units 21, 23 and 24 including nitrogen/air compressor,
pumps, storage tanks, pressure vessels, 6 units utility boilers with
160 ton per hour capacity,
Moshanir Power Consulting Co. - Pumped Storage Hydro Power
Plant- Siah Bishe Project
Responsible for 4 sets of Turbines and generators installation,
commissioning and start-up.
* Siah Bishe Project (the first in Iran) of 4 units, 1000 MW PSHP
(pumped storage hydro power plant)
Responsible for equipment of petrochemical and power station
plant construction, installation and commissioning;
* Marun Petrochemical Co. was founded in 21/01/1999 to perform
the Seventh Olefin. Through implementing this project which is one
of the greatest Olefins in the world with the capacity of producing
1/1 million tons of polyethylene, for the first time in the country,
the extracted (Ethan) C2 from natural gas is transformed into Olefin
materials, Polymeric and chemical products;