Srikanth modalavalasa, Lead Mechanical Engineer

Srikanth modalavalasa

Lead Mechanical Engineer

Mott Macdonald WLL

Location
Qatar
Education
Bachelor's degree, Mechanical
Experience
23 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 3 Months

Lead Mechanical Engineer at Mott Macdonald WLL
  • Qatar - Doha
  • My current job since April 2017

Project: Qatar Integrated Railway Project phase 1 Gold Line Metro Project comprising 13
underground stations including the Stabling yard, Emergency Exit, Central Cooling Plant
Building & Switch Box building and 16km of twin bore tunnels with cross passages.

Key responsibilities/Duties:
• Responsible for ensuring that internal DVE calculations are being undertaken in accordance with the project
requirements, that they are checked, and records are kept and maintained on PiMs.
• Responsible for ensuring that the Project Quality Procedures for calculations are being followed.  
• Responsible for checking of DRSs and calculations in accordance with the Project Processes and
• Procedures and issuing DRS to the Package Managers or Discipline Lead.
• Monitor quality and highlight any issues to the discipline leads
• Checking all Engineering Instructions (EIs) and scope change requirements are incorporated in the Design Reviews
being undertaken.
• Checking that design reviews are coordinated against other disciplines.
• Reviewing Shop Drawings against certified Design drawings to confirm design intent is being maintained.
• Review Material Approval Requests (MARs) for Mechanical plant and Equipment and ensure that they are compliant
with the Contractual requirements and Design intent.
• Dealing with client, contractors and stakeholders to resolve comments/queries

Sr. MEP Engineer at SMEET Precast & General Contracting
  • Qatar - Doha
  • My current job since April 2019

• Preparation of Concept sketches based on Client requirement, site conditions, budget and local building regulations.
• Preparation of detailed Mechanical Building Services design, drawings and specifications.
• Tendering of Contracts including estimates & detailed price analysis in both pre and post-contractual stages.
• Review and forward any comments on the contractor’s method statement for installation, execution of the works, review and forward any comments on the contractor’s technical submittals.
• Review all construction documents and highlight any design and contractual discrepancies with the concerned
• To ensure project related installation and testing is in compliance with applicable standards and project specifications.
• Supervise the execution of works, both performed by subcontractors, ensuring full compliance with safety and quality standards and procedures and verify that works are correctly carried out in accordance with project documentation and in the planned time frame.
• Promote safe works practices and environmental protection, ensuring that safety standards are respected
• Attending regular meeting (on work progress, co-ordination design, etc.) with client and consultant to discuss key issues related to the project and take effective corrective action
• Ensured Quality maintenance in all stages of construction and pre commissioning activities up to the completion and acceptance of project.
• Ensure all works are carried out in accordance with the approved method statements and shop drawings.

Sr.Mechanical Engineer at CEG International
  • Qatar - Doha
  • August 2016 to March 2017

• Responsible for the review, approval and supervision of installations of various mechanical activities.
• Coordinate with the contractors and sub-contractors on all mechanical works and requirements.
• Coordinate with other disciplines to ensure smooth flow of works.
• Review of all Shop Drawings and comment to resolve any discrepancies and errors noted.
• Review of materials submittals, Method Statements, Calculations etc.
• Resolve request for information’s (RFIs) rose by the contractors.
• Review of As-built drawings prepared by the contractors.
• Ensure that all mechanical installations are in compliance with the approved contract plans and specifications.
• Ensure that the contractors are complying with the safety requirements particularly in respect of all mechanical installations and procedures.
• Witness testing and commissioning of newly installed mechanical equipment.
• Preparation of engineering design and details of mechanical & HVAC.
• Check contract design and re-design if applicable.
• Attend site coordination meetings.

Mechanical Engineer at White Young Qatar Consulting Engineer, Architects , Project Management
  • Qatar - Doha
  • November 2012 to August 2016

Responsibilities:
• Serving as a part of the Post-Contract Team supervising large confidential military installations for buildings and hangers at Al Udeid Airbase, Doha
• Handling a team of 10-15 members
• Involved design calculations (HVAC)
• Review of Material Submittals, Shop Drawings,
Method Statements etc.
• Supervising installation of:
o HVAC System
o Water Supply & Drainage System
o Fire Fighting System
o FM200 SYS
o Jet Fuel System
o Irrigation System
o LPG System
o Generator Fuel System

Highlights:
• Identified major faults in the designing & engaged in design changes
• Single-handedly managed the Qatar Armed Forces Project

Mechanical Engineer at Qatar Design Consortium
  • Qatar - Doha
  • October 2011 to November 2012

• Prepared concept &sketches based on client requirement, site conditions, budget, local building regulations, mechanical
building services designs, drawings and specifications
• Preparation of Concept sketches based on Client requirement, site conditions, budget and local building regulations.
• Preparation of detailed Mechanical Building Services design, drawings and specifications.
• Interfacing and co-ordination between Architects, Civil and Electrical Engineers, Construction Contractors and also with
Clients, Project Managers and all other concerned on a regular basis.
• Tendering of Contracts including estimates & detailed price analysis in both pre and post-contractual stages.
• Supervision of finishing works, controlling quality and monitoring progress of works being executed during construction.
• Evaluation of contractor’s bills and invoices and issuing recommendation for payment.
• Preparation of various design and construction related reports including Feasibility, Design Concept, Site Analysis and
Project Progress Reports and completion programme.
• All other works related to regular Design Development and Construction Project Management.

MEP Engineer at Isolux Corsan
  • Qatar - Doha
  • December 2010 to March 2011

Project Handled:
Title: Qatar Power Transmission & Expansion Project Phase-VIII Substations, GTC-144B, S-2-1 Package
Client: Qatar General Electricity & Water Corporation, Kahramaa, Qatar
Description: The project involved the construction of 66/11 KV Transformer Feeder Substations in various parts of Qatar. It included installation, testing & commissioning activities for the following systems:
o Heat Ventilation & Air Conditioning System
o Transformer Explosion Prevention System
o Deluge Water Spray System
o FM 200 System
o Plumbing & Drainage System

MEP Engineer at Gulf Contracting Company
  • Qatar - Doha
  • August 2008 to January 2010

Projects Handled:
Title: Pearl Qatar-Bilal Tower & United Tower, Qatar Airways 4 Star Hotel, .
Clients: Qatar Airways, Baker Hughes, QP and UDC

Description:
o Coordination with the subcontractor of all the MEP activities for Mechanical systems such as HVAC, Fire Fighting and Plumbing services.
o Studying the preliminary design drawings and signifying the appropriate changes required for the construction.
o Reviewing specifications and drawing
o Prepare Daily, Weekly and Monthly Report of MEP activities.
o Verification and reviewing percentages and progress of Subcontractor MEP
o Ensuring compliance of works to relevant international standards
o Coordinating with the Sub contractors for the engineering submissions to the client.
o Reviewing all Material submittals, Shop drawings prior to the submission to the consultant.
o Carry out the site material inspection to ensure the delivered equipment is as per the approved submittal

Mechanical Engineer at Palms Agro Production Co
  • Kuwait
  • August 2004 to April 2008

Projects Handled:
Title: Public Authority for Applied Education Training, Kuwait City Beautification Project, Dasman Palace, Amir Diwan (Sief Palace)
Clients: MPW, PAAF and PAAET

Coordination with Consultant and Sub contractors & Vendors etc.,
• Execution
• Estimation
• Documentation
• Quantity Survey

o Responsible for design, over-viewing, procurement, cost control, liaison with clients, suppliers and other contractors on site, tendering and over all supervision
o Review design documents prior to release for construction.
o Check drawings & documents in accordance with applicable standards and maintain auditable record of the checks.
o Attending the design coordination meeting.
o Involved in pump total dynamic head calculations, pipe sizing and pressure drop calculations Responsible for preparation of material submittals, shop drawings for approvals
o Co-ordination with the project consultants and other agencies for the execution of the work. Monitored and controlled the schedule for each major equipment procurement and engineering.
o Production of detailed quantity takeoffs / Bills of Quantities from design drawings, Preparation of procurement schedule.
o Responsible for preparation of variation order and negotiate the proposed cost to the client, Prepare Monthly Report and Document Status, Alternatively, review and analysis of variations and claims submitted by Contractor.
o Procuring and Supervision of erection, installation of the equipment’s like LOWARA, GRUNFOS pumps for various projects, Stainless steel pipes, GI pipes, Gate valves, Screen filter units, Sprayers, Sprinklers, Irrigation controllers, Flow sensors, Pulse Transmitters, Pulse Decoders, CCU, RCV’s, Isolation gate valves, UPVC Pipes, HDPE Pipes
o Responsible for maintenance and repair works for equipment’s in projects - AMIRI DEWAN, DASMAN PALACE, GUEST PALACE, PAAET ETC.

Mechanical Quantity Surveyor at Sri Raghava Construction Pvt. Ltd
  • India - Hyderabad
  • May 1999 to May 2004

Project 1:
Provision of accommodation for officers at Naval Coast Battery, Visakhapatnam. Project period: 1999 to 2001.
o Construction of four storied RCC framed structures 8 blocks with all amenities such as :-
o HVAC system, Lift, external and internal water supplies, area drainage, sewage system
Project 2: Construction of married accommodation for navy staff at Dolphin Nose Vishakhapatnam. Project period: 2001 to 2003.

o RCC framed structures 3 storied with aminities such as HVAC system, external and internal water supplies. Eletrical services, Roads, Area Drainage and Sewage lines.
Project 3: Construction of pressure steam pipe lines at Naval Dock yard, Visakhapatnam. Project Period: 2003 to 2004.
o Provision of high pressure steam line with seamless pipes of Carbon steel of schedule 40, 1000Mtrs long, 200 dia .
o Condenser return pipe 100 mm dia, 1000Mtrs long.
o Low pressure pipe line 125mm dia, 800Mtrs long.

Education

Bachelor's degree, Mechanical
  • at Andhra University
  • May 1999

Specialties & Skills

Irrigation
Testing
Transformer
Commissioning
Installation
Microsoft Office
HVAC Software, HAP

Languages

English
Expert
Arabic
Intermediate

Training and Certifications

Ashrae Load Calculations, 1.5 PDHs (AIA) (Certificate)
Date Attended:
July 2018
BIM 360 Field certification (Certificate)
Date Attended:
April 2017
CIBSE Completion Certificate (No: 1835433420) of module OL12- Commissioning and Testing of Mechanica (Certificate)
Date Attended:
May 2015
Grade-A Engineer from UPDA, Qatar (Certificate)
Date Attended:
June 2017
Valid Until:
June 2020
Diploma Course in Plumbing systems Design and Drafting (Training)
Training Institute:
Institute of Piping Engineering & Building Services
Date Attended:
May 2008
Duration:
100 hours
Diploma Course in HVAC Design and Drafting as per ASHARE (Training)
Training Institute:
from Institute of Piping Engineering & Building Services
Date Attended:
May 2008
Duration:
100 hours
Electro Technology Certificate Course (Training)
Training Institute:
College of the North Atlantic, Qatar
Date Attended:
March 2009
Duration:
77 hours
Introduction to Integrated Systems Management (Training)
Training Institute:
Qatar Design Consortium
Date Attended:
October 2011
Duration:
3 hours

Hobbies

  • Playing Keyboards , Music