الخبرة العملية

مجموع سنوات الخبرة :27 years, 1 أشهر

Bridge Engineer في HKRR Ltd
  • الكويت
  • أشغل هذه الوظيفة منذ يوليو 2014
Senior Bridge Engineer في HKRR Ltd
  • فبراير 2011 إلى يوليو 2014
Senior Bridge Engineer في HKRR Ltd
  • يونيو 2011 إلى يونيو 2014

Design, Construction, Finance Operation and Maintenance of Four laning of Hyderabad - Karimnagar -Ramgunadam Road (SH-1) From Km 197+ 000- to Km 235+058 in the state of Andhra Pradesh under public private partnership (PPP) on DBFOT (Toll) basis. Project Cost: INR 450Crores Client: APRDC (Total input 20 months)
Main Project features: The Package - 4 of this project corridor consists of 1 Major bridges of length of 1.1Km situated on GODAVARI River, 1ROB, 1 RUB, 7 Minor bridges and Culverts (pipe and box). The foundations of all major and minor bridges consists of Raft foundations or Pile Foundations.. There are also a variety of super structures ranging from PSC I beams, RCC I beams, solid slabs and box structures
Responsibilities:
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking & Approval of construction Methodology submitted by the sub - contractor
•Supervision of piling activities involved in the site and conducted pile load test of vertical and lateral load test.
•Supervision of execution of pile caps, open foundation, piers and pier caps as per drawings.
•Conducted Standard Penetration Tests, Plate Load Test etc.
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Checking the subsoil investigation to the structures.
•Review the staging design.
•Liaison work carried out with Local departments involved in the projects..
•Maintaining & verification of quality at all stages of work in conformation with standard specifications.
•Modify drawings as per the site conditions, liaison with client regarding daily progress; prepare the weekly and monthly progress.
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills.
•Reviewing the working drawings & BBS submitted by EPC of all structures by considering the comments of independent consultants before starting execution at site.
•Execution and supervision of all construction activities as per the RFIs submitted for inspection from time to time and supervising the work as per approved working drawing and specification for quality output.
•Responsibility includes preparation of methodologies & staging drawings, execution of structures from lay out checking up to super structure completion level of major bridges, minor bridges, Under Passes, culverts & RE Walls as per MORST&H, IS & IRC specifications.
•Planning of machinery & man power by coordinating with superiors during monitoring of works at site. Preparation of BOQ related to sub-contractors.
•Involved in weekly, monthly progress reports preparation & attending review meetings pertaining to progress & Quality.

Senior Bridge Engineer في Consortium of DLF GAYATRI&MEGHA
  • فبراير 2011 إلى يونيو 2014
Project Manager
  • يونيو 2009 إلى مايو 2011

Structures, Terra Infra ltd
Construction of Eight Lane access controlled expressway as Outer Ring Road to Hyderabad City, Phase-IIA from Kolluru (Km. 12+000) to Patancheru (Km. 23+700) Project Cost: INR 5500 Million, Client: HUDA, Conssesionaire: CEPL (Total input 24 months)
Main Project features:
The project corridor consists of 1 Major bridges, 2 Minor bridges and culverts (pipe and box). The foundations of all major and minor bridges are RAFT foundations Pile Foundations.. There are also a variety of super structures ranging from PSC I beams to RCC I beams, solid slabs and box structures & RE Walls
Responsibilities:
•Checking & Approval of construction Methodology submitted by the sub - contractor
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking the subsoil investigation to the structures.
•Review the staging design.
•Liaison work carried out with Local departments involved in the projects..
•Maintaining & verification of quality at all stages of work in conformation with standard specifications.
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills.
•Reviewing the working drawings & BBS submitted by EPC of all structures by considering the comments of independent consultants before starting execution at site.
•Execution and supervision of all construction activities as per the RFIs submitted for inspection from time to time and supervising the work as per approved working drawing and specification for quality output.
•Responsibility includes preparation of methodologies & staging drawings, execution of structures from lay out checking up to super structure completion level of major bridges, minor bridges, Under Passes, culverts & RE Walls as per MORST&H, IS & IRC specifications

Senior Bridge Engineer
  • يوليو 2014 إلى فبراير 2011

Design, Build, Complete & Maintain Shaikh Jaber Al-Ahmad Al-Sabah Causeway Project




Design, Construction, Finance Operation and Maintenance of Four laning of Hyderabad - Karimnagar -Ramgunadam Road (SH-1) From Km 197+ 000- to Km 235+058 in the state of Andhra Pradesh under public private partnership (PPP) on DBFOT (Toll) basis.

Manager في Terra Infra Ltd
  • يونيو 2009 إلى سبتمبر 2010
Manager في Terra Infra ltd
  • يونيو 2009 إلى سبتمبر 2010
Project Manager في Terra Infra ltd
  • يونيو 2009 إلى سبتمبر 2009

Construction of Eight Lane access controlled expressway as Outer Ring Road to Hyderabad City, Phase-IIA from Kolluru (Km. 12+000) to Patancheru (Km. 23+700) BOT Project, conssesiire: CEPL

Manager في Maytas Infra Ltd
  • سبتمبر 2007 إلى مايو 2009
Project Manager في Maytas Infra ltd
  • سبتمبر 2007 إلى مايو 2009

Construction of Eight Lane access controlled expressway as Outer Ring Road to
Hyderabad City, Phase-IIA from Kolluru (Km. 12+000) to Patancheru (Km. 23+700). Project Cost: INR 3180 Million, Conssesionaire: CEPL.

Manager في Maytas Infra ltd
  • سبتمبر 2007 إلى مايو 2009
Project Manager في Maytas Infra ltd
  • سبتمبر 2007 إلى مايو 2009

Construction of Eight Lane access controlled expressway as Outer Ring Road to
Hyderabad City, Phase-IIA from Kolluru (Km. 12+000) to Patancheru (Km. 23+700). Project Cost: INR 5500 Million, Client: HUDA, Conssesionaire: CEPL. (Total input 21 months)

Responsibilities:
•Checking & Approval of construction Methodology submitted by the sub - contractor
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking the subsoil investigation to the structures.
•Review the staging design.
•Liaison work carried out with Local departments involved in the projects..
•Maintaining & verification of quality at all stages of work in conformation with standard specifications.
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills.
•Reviewing the working drawings & BBS submitted by EPC of all structures by considering the comments of independent consultants before starting execution at site.
•Execution and supervision of all construction activities as per the RFIs submitted for inspection from time to time and supervising the work as per approved working drawing and specification for quality output

Manager في GMR Projects Pvt Ltd
  • الهند
  • فبراير 2006 إلى مايو 2007
Project Manager في GMR Projects Pvt Ltd
  • الهند
  • فبراير 2006 إلى مايو 2007

Strengthening and Widening of existing 2 lane roads to 4lane from Construction Supervision Faruknagar to Jadcherala. NH-7. BOT Project

Manager في M R Projects Pvt Ltd
  • الهند
  • فبراير 2006 إلى مايو 2007
Project Manager في M R Projects Pvt Ltd
  • الهند
  • فبراير 2006 إلى مايو 2007

Strengthening and Widening of existing 2 lane road to 4lane from Faruknagar to Jadcherala. NH-7. BOT Project Cost: INR 3530 Million Client: National Highway Authority of India (Total input 16 months)
Main Project features:
The project corridor starts from Km34.140 at KOTTUR and ends at JADCHERALA Km 80.000 of NH-7. The corridor consists of 3 major bridges, 7 minor bridges and 44 culverts (pipe and box). The foundations of all major and minor bridges are RAFT foundations. There are also a variety of super structures ranging from 32m PSC I beams to 20m RCC I beams, 10m solid slabs and box structures.

Responsibilities:
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking the subsoil investigation to the structures.
•Review the staging design.
•Liaison work carried out with Local departments involved in the projects..
•Maintaining & verification of quality at all stages of work in conformation with standard specifications
•Checking & Approval of construction Methodology submitted by the sub - contractor
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills.
•Reviewing the working drawings & BBS submitted by EPC of all structures by considering the comments of independent consultants before starting execution at site.
•Execution and supervision of all construction activities as per the RFIs submitted for inspection from time to time and supervising the work as per approved working drawing and specification for quality output

junior Engineer في M/ Gammon India limited
  • ديسمبر 1997 إلى نوفمبر 2005

Assignment in the Project

Project Engineer في Gammon India limited
  • الهند
  • يناير 2004 إلى يناير 2005
Project Engineer في Gammon India limited
  • الهند
  • يناير 2004 إلى يناير 2005

Construction Supervision of ROB Domoria pull Jalandhar Punjab Project Cost: INR 1000 Million Client: Punjab PWD (Total input 12 months)
Main Project features:
ROB @Domoria pull Bridge in Jalandhar. The Bridge length is of 2 km. It consists of 20 members of40 mts length box girders and 200 members of 30 mts length PSC girders

Responsibilities:
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking the subsoil investigation to the structures.
•Review the staging design.
•Liaison work carried out with Local departments involved in the projects..
•Maintaining & verification of quality at all stages of work in conformation with standard specifications
•Checking & Approval of construction Methodology submitted by the sub - contractor
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub contractor bills

Assistant Engineer في Gammon India limited
  • الهند
  • يناير 2004 إلى أبريل 2004

Responsibilities during Construction:
Maintaining & verification of quality at all stages of work in conformation with standard specifications. Checking & Approval of construction Methodology submitted by the sub - contractor. Checking the bar bending schedule, concrete pouring to the structures. Checking shuttering, scaffolding arrangement, curing to the structures. Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C. Setting out of alignment with reference to alignment plan and GAD. Checking the subsoil investigation to the structures. Review the staging design. Liaison work carried out with Local departments involved in the projects. Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub contractor bills.
Responsibilities during Rehabilitation:
Rectifying the cracks in the abutment & Piers (Sub-Structure) with FRP injection method & Plastering with PMC (Polymer Modified cement) Mortar & Injection grouting with epoxy for super structure as per specifications. Inspecting the roller bearing and re fixing the same as it was in good condition Replacing the defective expansion joints with water stopper Replacing the defective crash barrier wherever it is needed. Resurfacing BC with profile corrective course. Conducting core test & Non- destructive test to ascertain the concrete condition of the bridge as per specifications.

Project Engineer في Gammon India limited
  • الهند
  • يناير 2002 إلى يناير 2004
Project Engineer في Gammon India limited
  • الهند
  • يناير 2002 إلى يناير 2004

Strengthening and Widening of existing 2 lane road to 4lane from Rajamundry to Dharmavaram NH-5 BOT Project (including rehabilitation of Major Bridges) Client: National Highway Authority of India. Project Cost: INR 3250 Million (Total input 24 months)
Main Project features:
The project corridor consists of 2 major bridges, 3 minor bridges and 60 culverts(pipe and box). The foundations of all Major Bridges are WELL foundations and Minor bridges are RAFT foundations. There are also a variety of super structures ranging 50 mts Box girders, 30 mts PSC I beams, 20 mts RCC I beams, 10 mts solid slabs and box structures.

Responsibilities during Construction:
•Maintaining & verification of quality at all stages of work in conformation with standard specifications
•Checking & Approval of construction Methodology submitted by the sub - contractor
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking the subsoil investigation to the structures.
•Review the staging design.
•Liaison work carried out with Local departments involved in the projects..
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills.

Rehabilitation and Repair works for the Yerram Major Bridge (LHS) on NH5. The total Length of the Bridge is 150m consisting 5 spans of 30m each.
Responsibilities during Rehabilitation:
•Rectifying the cracks in the abutment & Piers (Sub-Structure) with FRP injection method & Plastering with PMC (Polymer Modified cement) Mortar & Injection grouting with epoxy for super structure as per specifications.
•Inspecting the roller bearing and re fixing the same as it was in good condition
•Replacing the defective expansion joints with water stopper
•Replacing the defective crash barrier wherever it is needed.
•Resurfacing BC with profile corrective course.
•Conducting core test & Non- destructive test to ascertain the concrete condition of the bridge as per specifications

Project Engineer في Gammon India limited
  • الهند
  • يناير 2002 إلى ديسمبر 2002

Strengthening and Widening of existing 2 lane road to 4lane from Rajamundry to Dharmavaram NH-5 (including rehabilitation of Major Bridges) BOT Project Cost: INR 3250 Million

Assistant Engineer في Gammon India limited
  • الهند
  • يناير 2001 إلى يناير 2002
Assistant Engineer في Gammon India limited
  • الهند
  • يناير 2001 إلى يناير 2002

Vasai creek Bridge. Project Cost: INR 1120 Million Client: Maharastra Road Development Corporation (Total input 12 months)
Main Project features:
This Bridge is constructed in Sea of length of 2 kms connecting two city muncipalities by Rail Track. Entire components are pre fabricate on off shore and launched in position. The bridge has 45 m length Pre-cast Post tentioned Box girders and wellfoundations of 8 metres Dia sinking to a depth of 30 mts from bed level..

Responsibilities:
•Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C.
•Setting out of alignment with reference to alignment plan and GAD.
•Checking the subsoil investigation to the structures.
•Maintaining & verification of quality at all stages of work in conformation with standard specifications
•Checking the bar bending schedule, concrete pouring to the structures.
•Checking shuttering, scaffolding arrangement, curing to the structures.
•Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills

Assistant Engineer في Maharashtra Road Development Corporation
  • يناير 2001 إلى أبريل 2001

Nov

Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C. Setting out of alignment with reference to alignment plan and GAD. Checking the subsoil investigation to the structures. Maintaining & verification of quality at all stages of work in conformation with standard specifications Checking the bar bending schedule, concrete pouring to the structures. Checking shuttering, scaffolding arrangement, curing to the structures. Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills

Assistant Engineer في Gammon India limited
  • الهند
  • يناير 1999 إلى يناير 2001
Assistant Engineer في Gammon India limited
  • الهند
  • يناير 1999 إلى يناير 2001

JJ - flyover project. Cost of Project: INR 600 Million

في Maharasta Road Development Corporation
  • يناير 1999 إلى فبراير 1999

April
Checking the bar bending schedule, concrete pouring to the structures. Checking shuttering, scaffolding arrangement, curing to the structures. Checking and approvals of BBS and recording the monthly measurements in M-book as per IPC for sub-contractor bills Construction Supervision of bridges giving instructions to my field Engineers, daily job request, approvals, check and give approval for construction after getting approval from I.C. Setting out of alignment with reference to alignment plan and GAD. Checking the subsoil investigation to the structures. Maintaining & verification of quality at all stages of work in conformation with standard specifications

Junior Engineer في Gammon India limited
  • الهند
  • يناير 1997 إلى يناير 1999
Junior Engineer في Gammon India limited
  • الهند
  • يناير 1997 إلى يناير 1999

Vashi -CMLR flyover, Vashi, Navi Mumbai, (including rehabilitation of Major Bridges) Project Cost: INR 450 Million Client: Maharastra Road Development Corporation (Total input 35 months)
Main Project features:
This Bridge consists of precast pre-tention and post-tention Igirders. The project corridor consists of 1 major bridges of length of 1.1Km situated on GODAVARI River, 10minor bridges and 65 culverts (pipe and box). The foundations of all major and minor bridges are RAFT foundations Pile Foundations.. There are also a variety of super structures ranging from 32m PSC I beams to 20m RCC I beams, 10m solid slabs and box structures & RE Walls.
Responsibilities during Construction:
Responsilble for all civil works such as sub structures and super structure works.
•Supervision of labors day to day activities
•Preparation of bar bending schedule and submitting necessary documents to client for approval,
•Maintaining muster records and daily works report,
•Survey work and layout checking.
•Preparation of sub-contractor bills.
•Coordinating with Client
•Field and laboratory test
•Preparation of diversions as per site conditions

Rehabilitation and Repair works for the Subsidary Bridge leading to Vashi -CMLR flyover, Vashi, Navi Mumbai, The length of the bridge is 300m
Responsibilities during Rehabilitation:
•Rectifying the cracks in the abutment & Piers (Sub-Structure) with FRP injection method & Plastering with PMC (Polymer Modified cement) Mortar & Injection grouting with epoxy for super structure as per specifications.
•Inspecting the bearing and re fixing the same as it was in good condition
•Replacing the defective expansion joints with water stopper
•Replacing the defective crash barrier wherever it is needed.
•Resurfacing BC with profile corrective course.
•Conducting core test & Non- destructive test to ascertain the concrete condition of the bridge as per specifications.


Languages:
Language
Reading
Writing
Speaking
English
Excellent
Excellent
Excellent
Hindi
Excellent
Excellent
Excellent
Telugu
Excellent
Excellent

Junior Engineer في Gammon India limited
  • الهند
  • يناير 1997 إلى ديسمبر 1997

Vashi -CMLR flyover, Vashi, Navi Mumbai, (including rehabilitation of Major Bridges) Project Cost: INR 450 Million

Bridge /Structural Engineer في Dar al Handasah
  • الكويت
  • يوليو 2014 إلى

I have sufficient experience & knowledge of supervising and monitoring of well foundation, Pile foundation, open foundation, Piers, Abutments, Bearings, I-girder, Box girder deck slab and voided deck slab with post tensioning system. He has thorough understanding and experience in international ‘best practices’ and modem bridge construction technology including bridge foundations viz. well/pier, post tensioning system of pre-stressing, casting of pre-cast PSC concrete box girder and ‘T’ girders, launching and erection of pre-cast PSC girders up to 200 M.T. weight, conducting load tests, fabrication of heavy launching steel girders, reinforced earth panel system for VOP approaches, etc.

He is well conversant with bridge construction materials, technical specifications, testing procedure, relevant IRC codes and MORTH and AASHTO specifications and standards and best practices in the construction of bridges. He is thoroughly conversant with design standards, technical specifications and statistical quality control and quality assurance procedures for construction of different components of bridges. He is also well versed with FIDIC contract conditions.
•Design, Construction, Finance Operation and Maintenance of Four laning of Hyderabad - Karimnagar -Ramgunadam Road (SH-1) From Km 197+ 000- to Km 235+058 in the state of Andhra Pradesh under public private partnership (PPP) on DBFOT (Toll) basis. Project Cost: INR 400Crores Client: APRDC
•Construction of Eight Lane access controlled expressway as Outer Ring Road to Hyderabad City, Phase-IIA from Kolluru (Km. 12+000) to Patancheru (Km. 23+700) Project Cost: INR 5500 Million, Client: HUDA, Conssesionaire: CEPL
•Construction of Eight Lane access controlled expressway as Outer Ring Road to
Hyderabad City, Phase-IIA from Kolluru (Km. 12+000) to Patancheru (Km. 23+700). Project Cost: INR 3180 Million, Client: HUDA, Conssesionaire: CEPL
•NH-7.BOT Project for strengthening and widening of existing 2 lane road to 4lane from Faruknagar to Jadcherala. Project Cost: INR 3530 Million Client: National Highway Authority of India
•ROB Domoria pull Jalandhar Punjab Project Cost: INR 1000 Million Client:
•Rajamundry -Dharmavaram NH-5 BOT Project for strengthening and widening of existing 2 lane road to 4lane (including rehabilitation of Major Bridges) Client: National Highway Authority of India. Project Cost: INR 3250 Million
•Vasai creek Bridge. Project Cost: INR 1120 Million Client:
•JJ - flyover project. Cost of Project: INR 600 Million Client:
•Vashi -CMLR flyover, Vashi, Navi Mumbai, (including rehabilitation of Major Bridges) Project Cost: INR 450 Million

Structural Engineer في Dar Al Handasah
  • قطر
  • إلى
Project Engineer في Gammon India limited
  • الهند
  • إلى

Construction Supervision of ROB Domoria pull Jalandhar Punjab Project Cost: INR 1000 Million

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في REC Warangal
  • يناير 1997
بكالوريوس, Civil Engineering
  • يناير 1992

in

Specialties & Skills

BASIC CHECK
BRIDGES
CUSTOMER RELATIONS
FEATURES
MICROSOFT WORKS
QUALITY
RECORDING
SUPERVISORY SKILLS

اللغات

الانجليزية
متمرّس
الهندية
متمرّس