Stefano Di Pietro, QA

Stefano Di Pietro

QA

ITP

Location
Angola
Education
Diploma, Accounting and Commercial awarded
Experience
4 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :4 years, 7 Months

QA at ITP
  • United Arab Emirates
  • to June 2015

S.p.a. (CPY) with other partners is developing block 15/06 in the Angolan deep offshore located approximately at 350 km North - North West of
Luanda and 130 km west of Soyo. The West and East hub fields development projects includes rigid production line and service line, cluster manifolds and a flow line
and riser system that will be connected to an external Turret moored FPSO (floating, production, storage and offloading).
Activities:
- Promote the understanding of the Company's Quality Policy, Quality Manual, Procedures and Work Instructions
- Maintain project & programme Quality Plans so that they are aligned with OperationsManagement
- Check project preparations and inspect work in accordance with inspection and test plans (

Technician at NDT
  • January 2007 to December 2010

Client: ISAB Refinery Project: General Supervision of maintenance activities - Priolo (SR) /Italy
Description: Visual inspection of lines and pressure equipment for predictive control and expiration Date according with Italian Law.
Client: ISAB Energy Service Project: Revamping CTE NU.CE. North - Priolo (SR) /Italy
Description: Verification and inspection activities during the construction phases
Activities:
- Inspector Plant on Behalf ISAB refinery (SR)
- Inspection and NDT of piping, pressure equipment, civil structures and metal
- Inspection and verification of NDT
- Extraction of metallographicreplicas
- Chemical analysis by spectrometer on metallic materials
- Thermography Check (civil, industrial, petrochemical, electrical)
- Activities Expediting and QualityInspections / Welding Supervision / Piping Inspection and visualcheck
- Dimensional checks - Material Traceability - Release ofMaterial
- Writing periodic reports about the status ofwork
- Hydro-tests Supervision / Check Documents / Test Pack / Check Finalsdossier

Welding Inspector at 2013 Epsco
  • Italy
  • March 2013 to January 2009
Mechanical Assistant at IREM S.p.
  • June 2006 to December 2006

Client: ISAB Refinery Project: CR 40 DAO GOFINER (Snamprogetti Italy) - Priolo Gargallo (SR) / Italy
Activities:
- Piping Visual Inspection and dimensional check / Material Traceability
- Supervision assembly activities

Welding Inspector at R & M
  • Italy
  • January 2011 to January 2002

EST Project located in Sannazzaro (PV) - Investment of 1.1 billion euro for the construction of a new plant that is able to completely convert petroleum
residues, heavy crude and oil sands into high quality fuels and services.
Client: Al Hosn Gas (UAE ) Project: Shah EPC 2/3 - Automatic UT Qualifications Supervision - Cortemaggiore / Italy C/o Ecoblobal
Activities:
- Management and review of project documentation and project quality control plans
- Management, analysis, inspection and verification of NDT and welder qualification Test (WQT)
- Inspection and check weld joint preparation, fit up, alignment & dimensional.
- Management, analysis, inspection and check of the correct execution of the welds FIELD / SHOP
- Inspection and check consumable storage, handling, packing and drying temperature
- Inspection of the level of quality required by welders
- Inspection of the correct execution of pre-and post-heat and heat treatments and Hardness checking
- Welding Supervision / Inspection and visual verification of piping
- Activities Expediting and Quality Inspections
- Welding Supervision / Piping Inspection and visual check / Dimensional checks / Material Traceability / Material Release
- Writing periodic reports about the status of work.
- Check Documents Test Pack / Hydro-tests Supervision / Check Finals dossier

Quality Coordinator at 2014 - Bureau Veritas
  • January 2008 to
QA at Stefano Di Pietro
  • to
Project at Menzel Ledjmet East (MLE)
  • to

The Menzel Ledjmet East (MLE) gas field is a commercial project being jointly developed by Sonatrach (SH) and First Calgary Petroleums Ltd. (FCP) now
in the ENI asset. The MLE field lies within the Ledjmet Block 405b in the Berkine Basin of Algeria approximately 220 km south-east of Hassi Messaoud.
Activities:
- Check project preparations and inspect work in accordance with inspection and test plans
- Preparation of the QC Surveillance Plans related to the EPC scope ofwork.
- Organize and coordinate resources to ensure adequate QC coverage for projects.
- Coordinate required inspection at vendors/subcontractors.
- Management and review of project documentation and project quality control plans
- Management, analysis, inspection and verification of NDT and welder qualification Test(WQT)
- Activities of Expediting and QualityInspections
- Inspection of the quality level, required by welders
- Welding Supervision / Piping Inspection and visualcheck / Dimensional checks / Material Traceability / Material Release
- Writing periodic reports about the status of work.
- Check Documents Test Pack / Hydro-tests Supervision / Check Finals dossier

Education

Diploma, Accounting and Commercial awarded
  • at I.T.C. Alaimo Lentini SR
  • July 2005

Specialties & Skills

ASSEMBLY LANGUAGE
CUSTOMER RELATIONS
MATERIALS MANAGEMENT
QUALITY
QUALITY CONTROL
SUPERVISORY SKILLS
TECHNICIAN
WELDING

Languages

English
Expert
Italian
Expert
Portuguese
Expert