subas Beherra, Senior Electrical Engineer

subas Beherra

Senior Electrical Engineer

CHINA PETROLIUM ENGINEERING

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Electrical Engineering
Experience
20 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 4 Months

Senior Electrical Engineer at CHINA PETROLIUM ENGINEERING
  • United Arab Emirates
  • March 2018 to April 2020

Conceptual, Feed and Detailed Engineering, Project execution, Engineering support and Project management consultancy of Electrical Power Distribution Network /System for a wide variety of Industrial projects like Oil and Gas Upstream and downstream projects, Petrochemical, Petroleum, Refineries, Crude Oil Production Facilities/Tank Farms, NGL Plants, Bulk Plants, Oil & Gas Separation Plants and Infrastructure Projects 132Kv, 33kV AIS and GIS substation Distribution system and switchgears
Graduate in Electrical Engineering in 1992
Diploma in Electrical Engineering in 1988.
EXPERIENCE
(23Yrs in Oil &Gas, Petroleum, Refinery, Bulk Plants, Tank Farms, Infrastructure Projects)

 EPC for BAB INTEGRATED FACILITY DEVLOPMENT in which involves power supply to PSS Skids located at RDS, Main pad, Mini pad, Water injection clusters & Well-bays.
The main equipment’s involved for engineering, design, procurement and construction of BAB project:
33/3.45 kV, 4MVA ±10% with 1.25% steps OLTC Power Transformers. 3.3/0.433 kV, ±5% with 2.5% steps OCTC Distribution Transformers. Substation control and monitoring system (SCMS) interface panels to transfer signals to BAB LDC through OHL network, 33Kv GIS Switchgear, 3.3kV Air Insulated Switchgear with Bus coupler, 415 V Switchgear with Bus section, 415V, 3phase, 4 wire Bus duct, 415V Emergency Diesel, 240 V AC UPS system, 110 V DC UPS system, Lighting and small power Distribution Boards, HVAC Switchboard and control panels, Fire alarm and HSSD system

 EPC project constituting Detail design and project execution of CS8 GAS COMPRESSION PROJECT and UMQASR Storage terminal project for SHELL-BGC IRAQ Which involves installation of 11Kv Switchgear, 3.3Kv switchgear, 400V LV switchgear, Power Transformers, AC/DC UPS, MOV, MV/LV Motors, Lighting and Earthing system in concrete Substation etc.
 Detail Design for EPCC of Oil Gathering Facilities (Phase 1 - Offsite 3) by EPC Contractor M/S GRAND Energy, For PETRONAS Carigali Iraq Holding B.V. Garraf Operations. The project involves power supply for drilling of new oil rigs for well pads -28(Typical). Power supply to well pads involves construction of new Substation building with, Distribution Transformers, LV switchgears, Emergency diesel generating sets, AC UPS System, IMCS system, Lighting, earthing and lightning protection system etc.
 Feed for PETRO CHINA HALFAYAH (Operating Company) project for surface facility development at IRAQ. The project involves power supply to downstream projects for crude oil processing Trains, water injection system and Gas compression system. The electrical work involves power supply to 33kV switchgears, 33/6.6kV power transformers, 6.6kV switchgear, 5.5 MW HP&LP Compressors, SD Drives, Stabilized compressors, 400V Low voltage switchgears, AC UPS, DC UPS, EICS system, Diesel Generators, Lighting, Earthing and lightning protection system etc.
 EPC of water management project at PETRONAS CARIGILI GARAFF FIELD development project, IRAQ.
The power supply involves 33kV supply to facilities at 33kV switchgears 33/11kV, 50MVA Transformer & and stepped down to 6.6kV through 33/6.9Kv, 10MVA Power transformer, 33kV power supply through Underground cable to 11kv&6.6kV switchgear, 6.6kV Motors, 6.6/420V Auxiliary transformer. Installation of AC UPS, EICS system, Lighting and Earthing system, Emergency Diesel generator set and LV switchgears, Indoor substation building etc.

Senior Electrical Engineer
  • January 2013 to November 2013

Front end engineering Design work and pre-award activities for GARRAF final field development (GFFD) project, IRAQ

Senior Electrical Engineer at LITWIN PEL ENGINEERING
  • United Arab Emirates - Abu Dhabi
  • May 2013 to October 2013

 Detail Design and Engineering for NGL Pipeline Project at ASAB-0, which involves modification of existing 11kV switchgear, Installation of new 11 kV Switch Gear, VFD Panel, Phase shifting transformer, 1150kW Motors, Power Transformer, 415 V Switch Borad, IPCS system for MV & LV, 240V AC UPS, 110V DC UPS, cable laying & termination for 11 kV, 3.3 kV, 415 v cable. Earthing and lighting layout

Electrical Engineer at CH2M HILL-Veco Engineering
  • United Arab Emirates
  • January 2013 to May 2013

GARRAF final field Development (GFFD) project, PETRONAS CARIGALI.
•Front end engineering Design work and pre-award activities for GARRAF final field development (GFFD) project, which involves phase-1 & 2 for development of new well pads & power supply to Third water river intake facility, GIFT water treatment and water injection facility, Produced water upgrade facility and power supply to mishriff common utility.
The power supply involves 33kV OHL power supply to all of the above facilities at 33kV switchgears and stepped down to 6.6kV through 33/6.9kV Power transformer, power supply to 6.6kV switchgear, 6.6kV Motors, 6.6/420V Auxiliary transformer. Installation of AC UPS, EICS system, Lighting and Earthing system, Emergency Diesel generator set and LV switchgears, pre-fabricated substation building etc 240V AC UPS, 110V DC UPS, cable laying & termination for 11 kV, 3.3 kV, 415 v cable. Earthing and lighting layout

design engineer at CONSOLIDATED GULF COMPANY
  • Qatar
  • March 2008 to March 2011

Lead design engineer and is responsible for designing of Electrical systems including for Detail, Feed and conceptual engineering design packages in accordance with industry and Qatar petroleum standards for Qatar petroleum projects.
Feed for installation of power factor improvement project at Dukhan 33 kv Electrical network.
The study of instrument air compressor at Gas Distribution Station B, E, F & G, Gas operation, Mesaieed. Qatar Petroleum.
•FEED for installation of fire water rings at Gas Distribution systems at stations W1& W2 at mesaieed .
•Engineering Consultancy services for study of 33kV electrical network in Dukhan field.
•Feed for Impressed current cathodic protection for STP tanks at Dukhan.
•Detail design for construction of tool and Technician building for NGL 3&4 at Mesaieed .
•Feed for SCS/SCADA for Electrical distribution system in Dukhan.
•Feed for Lube oil cooling system for crude oil loading pumps.
•Up gradation of Kathiya main, Kathiya south and Kathiya north de-gassing stations.
•Updating of Hazardous area classification drawings in Dukhan and mesaieed field.

Senior Electrical Engineer
  • March 2011 to January 2011

Detail Design for Waste Water Treatment Plant expansion in EQUATE, KUWAIT

Electrical Design Engineer at SCS
  • March 2011 to January 2011

a.Feed for installation of power factor improvement project at Dukhan 33 kV Electrical network, QP QATAR
b.Feed for Impressed current cathodic protection for STP tanks at Dukhan.
c.Detail design for construction of tool and Technician building for NGL 3&4 at Mesaieed .
d.Feed for

Electrical Design Engineer at Saudi Aramco
  • United Arab Emirates
  • March 2008 to January 2011

Detail design for GAS and oil Separation project for

Senior Electrical Engineer at Worley Parsons Engineering LLC
  • Oman
  • March 2011 to January 2011
Electrical Design Engineer at KSA
  • United Arab Emirates
  • March 2006 to April 2008

Up gradation of Rabigh Bulk plant. In Rabigh Saudi Aramco

Electrical Design Engineer at DAR AL-RIYADH CONSULTANTS
  • United Arab Emirates
  • March 2006 to April 2008

Electrical Design Engineer for Conceptual, Feed and Detailed Engineering, packages for Oil and Gas, Refinery (Saudi ARAMCO) and Petrochemicals (SABIC)
GAS and oil Separation project for Saudi Aramco & Up gradation of control Building at ABQUAIQ GOSP II.
•Up gradation of Rabigh Bulk plant. In Rabigh Saudi Aramco (KSA).
•Replacement of compressor with associated modification, switchgears, cables and
• control panels for SABIC, Riyadh.
•Installation of new air supply system at Dhahran Bulk Plant.
•Electrical heat tracing for compressor pipe line at Al-Haradh GOSP-11.

Electrical Engineer at Al Toukhi Company for Industries An EPIC Contracting Company for Industries
  • Saudi Arabia
  • August 2003 to March 2006

EPC for Shoquiya (110/13.8kv GIS) substation at Saudi Electricity company, KSA .
• EPC for Al- Muhayil S/S (133/33 kV Outdoor S/S) Southern zone Saudi Electricity, KSA.

Indoor and outdoor equipment layout, plan & sections
Preparation &checking of SLD, Relay metering Dwg
Reviewing of protection & control schematic drawings of suppliers.
Cable sizing calculations cable schedules an Interfacing of Relay/ control panels with Switch gears.
Design calculation of substation earthing & Equipment earthing layouts etc.
Battery and charger sizing Calculation.
Designing of lighting circuits, calculations an Layouts for indoor and outdoor substations.
CT/PT Sizing Calculation.
Tubular bus bar sizing calculation.
Review of Vendor drawings and Documents to ensure their compliance with specifications as per the PTS And contract documents &Preparing of work Schedule.
Experience in dealing with engg.consultants&end Clients.
Experience in co-coordinating with site activities/client tech.support.
Preparation of Material take-offs and List of deliverables.

Electrical Engineer at EPC for Al- Muhayil S/S
  • Saudi Arabia
  • August 2003 to March 2006
Electrical Engineer
  • United Arab Emirates
  • August 2003 to March 2006

Detail Design, procurement and construction of Chemoil Project Oil Terminal-1&2

Senior Electrical Engineer at KC-93
  • December 2000 to August 2003

Feed for installation of utility power supply Instrument air compressors

Electrical engineer at MOC Engineering
  • December 2000 to August 2003

Detail Design, procurement and construction of Chemoil Project Oil Terminal-1&2 Project Fujairah, consists of Fuel oil, Gas oil & Jet oil with total storage capacity of 580, 000 cbm with 21 nos tanks, heating coil & Blending for associated pipelines, pumping stations etc. Oily water separator, Utility air system, 33/6.6kV substation, 6.6/.415kV substation.
Detail Engineering Deliverables like Electrical Specifications, Datasheets, MRs, Design Calculations, Layout Drawings and Single Line Diagrams. Vendor Engineering Deliverables Like GA, SLD, Schematics/ Control wiring Diagrams and Plant Package.
Assistance to Procurement to finalize the major long lead materials and provide Technical bid evaluation reports etc.
Project Execution - Supporting role for Construction/Execution team by providing engineering solutions.

Senior Electrical Engineer
  • January 1994 to December 2000

Detail design for WP expansion project

at Project Management Consultancy
  • United Arab Emirates
  • January 1994 to December 2000

Perform

Senior Electrical Engineer
  • January 1994 to December 2000

Detail design for Solvent recovery plant

Electrical Engineer at United phosphorus Limited Projects Division Ankleswar
  • India
  • January 1994 to June 1999

Feed and detail engineering of expansion projects for chemical & pesticide plants.
Preparation of deliverable lists, Planning, scheduling, executing Project implementation & execution of HT/LT Switchgears, control panels, Transformers, SF6Circuit Breakers, CT/PT, Power control centre, Motor control Centre, D.G set, Boiler, Utility and Lighting distribution system. Plant
Earthing, Substation earthing, cable laying, plant lighting.
Ensuring that equipment supplied are in compliance with approved & pre-set technical specifications.
Preparing commissioning schedules in coordination with equipment supplier, erection agency, testing and commissioning team to match with the project completion plan.
Material takeoff and floating of RFQ (Request for quotations).
Project Handled:
•Feed for installation of utility power supply Instrument air compressors, KC-93&12 & lighting & earthing for for utility building and equipments.
•Detail design for Solvent recovery plant which involves power supply for reactors, transfer pump motors, earthing o& lighting of plants.
•Detail design for WP expansion project.
•Detail engineering for power supply to Effluent treatment plant with expansion of new MCC.
•Feed for earthing & lighting power supply to finished go down, canteen etc.
•Feed for expansion of Mancozeb plant and utility power supply.
•Engineering services for lighting and power supply to administration building, chilling plant etc.

Electrical Engineer at CHINA PETROLIUM ENGINEERING Middle Eas
  • United Arab Emirates
  • to

of EPC of BAB INTEGRATED FACILITY DEVLOPMENT in which involves power supply to to PSS Skids located at RDS, Main pad, Mini pad, Water injection clusters & Well-bays.
The main equipment’s involved for engineering, design, procurement and construction of BAB project:
33/3.45 kV, 4MVA ±10% with 1.25% steps OLTC Power Transformers. 3.3/0.433 kV, ±5% with 2.5% steps OCTC Distribution Transformers. Substation control and monitoring system (SCMS) interface panels to transfer signals to BAB LDC through OHL network, 3.3kV Air Insulated Switchgear with Bus coupler, 415 V Switchgear with Bus section, 415V, 3phase, 4 wire Bus duct, 415V Emergency Diesel, 240 V AC UPS system, 110 V DC UPS system, Lighting and small power Distribution Boards, HVAC Switchboard and control panels, Fire alarm and HSSD system
•Sr Electrical engineer for EPC project constituting Detail design and project execution of CS8 GAS COMPRESSION PROJECT and UMQASR Storage terminal project for SHELL-BGC IRAQ Which involves installation of 11Kv Switchgear, 3.3Kv switchgear, 400V LV switchgear, Power Transformers, AC/DC UPS, MOV, MV/LV motors, Lighting and earthing system in concrete Substation etc.
•Lead Engineer for the project: Detail design for EPCC of Oil Gathering Facilities (Phase 1 - Offsite 3) by EPC Contractor M/S GRAND Rnergy, For PETRONAS Carigali Iraq Holding B.V. Garraf Operations.The project involves power supply for drilling of new oil rigs for well pads -28(Typical) .Power supply to well pads involves construction of new substaion building with, Distribution Transformers, LV switchgears, Emergency diesel generating sets, AC UPS System, IMCS system, Lighting, earthing and lightning protection system etc.
•Sr Engineer for Detail design and Engineering of Gas compression system at West Qurna, IRAQ for BASHRA Gas project &SHELL.
•Sr Electrical engineer for the project: Feed for PETRO CHINA HALFAYAH (Operating Company) project for surface facility development at IRAQ. The project involves power supply to downstream projects for crude oil processing Trains, water injection system and Gas compression system. The electrical work involves power supply to 33kV switchgears, 33/6.6kV power transformers, 6.6kV switchgear, 5.5 MW HP&LP Compressors, VSD Drives, Stabilized compressors , 400V Low voltage switchgers, AC UPS, DC UPS, EICS system, Diesel Generators, Lighting, earthing and lightning protection system etc.
•Sr.Electrical engineer for EPC of water management project at PETRONAS CARIGILI GARAFF FIELD development project, IRAQ.
The power supply involves 33kV supply to facilities at 33kV switchgears 33/11kV, 50MVA Transformer & and stepped down to 6.6kV through 33/6.9Kv, 10MVA Power transformer, 33kV power supply through Underground cable to 11kv&6.6kV switchgear, 6.6kV Motors, 6.6/420V Auxiliary transformer. Installation of AC UPS, EICS system, Lighting and Earthing system, Emergency Diesel generator set and LV switchgears, Indoor substation building etc.

at LITWIN PEL ENGINEERING
  • to

Pipeline Project GASCO at ASAB-0 ABUDHABI.

•Detail Design and Engineering for NGL Pipeline Project at ASAB-0, which involves modification of existing 11kV switchgear, Installation of new 11 kV Switch Gear, VFD Panel, Phase shifting transformer, 1150kW Motors, Power Transformer, 415 V Switch Borad, IPCS system for MV & LV, 240V AC UPS, 110V DC UPS, cable laying & termination for 11 kV, 3.3 kV, 415 v cable. Earthing and lighting layout

Senior Electrical engineer at Petroleum Development Oman
  • United Arab Emirates
  • to

for OMAN Petroleum Company,

Senior Electrical Engineer
  • to

a) Detail design for Gas compression station for CS-8 at West Qurna, IRAQ for Bashra Gas Company & SHELL
b) Detail design and execution of UM-QASR Storage terminal project for SHELL-BASHRA GAS COMPANY

Pipeline Project at GASCO
  • United Arab Emirates
  • to

Education

Bachelor's degree, Electrical Engineering
  • at INSTITUTION OF ENGINEERS INDIA
  • August 1992

GRADUATE IN ELECTRICAL ENGINEERING

Specialties & Skills

Experience in oil and Gas and petroleum projects f
CUSTOMER RELATIONS
DISEñO DE LA DISPOSICIóN
ENGINEERING
LIGHTING
NETWORKING
OIL PAINTING
Detail design

Languages

English
Expert

Training and Certifications

ETAP (Training)
Training Institute:
ETAP

Hobbies

  • PLAYING BADMINTON,READING NEWS PAPPER ETC