Subrahmanyam Kavilapurapu, Sr Manager

Subrahmanyam Kavilapurapu

Sr Manager

Sinopec

البلد
الإمارات العربية المتحدة - عجمان
التعليم
بكالوريوس, Chemical Engineering
الخبرات
44 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :44 years, 11 أشهر

Sr Manager في Sinopec
  • الإمارات العربية المتحدة - الشارقة
  • أشغل هذه الوظيفة منذ ديسمبر 2013

Review of the projects. Assessment on the additional scope and preparing the Contract claims for the additional work done

Technical Office Manager في Target Engineering Construction Co. (LLC)
  • الإمارات العربية المتحدة - أبو ظبي
  • ديسمبر 2011 إلى مايو 2012

Engineering activities including design, preparation of BOQ for estimate purposes, review of engineering drawings of the project, documentation.
Providing technical inputs to Procurement division to identify the correct material required for the project.
Providing technical inputs to projects and attend project review meetings.
Responsible for the Precommissioning and commissioning activities

Manager Process في Tebodin Middle East Ltd.,
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2011 إلى ديسمبر 2011

Review of final Engineering documents.
Review of project Operation and Maintenance Manuals
Follow up of the project close-out activities

Process Manager في Galfar Engineering & Contracting WLL Emirates
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2008 إلى سبتمبر 2010

Review of engineering documentation.
Provide technical inputs to the project team
Attend project review meetings and other project related meetings with client and consultants
Provide technical inputs to Procurement to identify and procure the project required equipmnents and machines
Review of vendor documents to confirm with the project specifications.

Addl General Manager في Air Liquide Engineering India Pvt Ltd.,
  • الهند - حيدر اباد
  • مايو 1993 إلى ديسمبر 2007

Head of Process Engineering and Design with the responsibility of generating process specifications, process drawings like PFDs, P&IDs etc for Air Separation Plants, cyrogenic and non-cryogenic type plants.
Follow up of oversea project execution
Available to provide the required process assistance for commissioning of the plants.
Review the process calculations and give clearance for preparation of process specifications.

Dy Manager في Indian Rare Earths Ltd., OSCOM
  • الهند
  • يناير 1980 إلى مايو 1993

Project execution during the project phase.
Commissioning and Operation stabilizaiton of mineral separation process
Developing and following the Maintenance Management and Spare Parts Planning for the company
As Head of MIS generating the required information and daily monitoring reports fo the company

Chemical Engineer في Metal Engineers
  • الهند - حيدر اباد
  • يوليو 1978 إلى ديسمبر 1979

Plant and plant equipment design and estimate. Preparation of Technical Offers and provide the required technical inputs for identifying the plant equipment and sizing.

Graduate Trainee في IDL Chemicals Ltd
  • الهند - حيدر اباد
  • سبتمبر 1977 إلى يوليو 1978

Process development studies, Pilot Plant trial operations and preparing reports for process modifications.

الخلفية التعليمية

بكالوريوس, Chemical Engineering
  • في Birla Institute of Technology and Science
  • ديسمبر 1976

Chemical Engieering with a project - Bauxite benefication using Flotation Techniques.

Specialties & Skills

Project Engineering Management
Project Management
Process Engineering and Design
Engineering documentation
Precommissioning and Commissioning
MS Word
MS Excel

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
التاغالوغية
متوسط

العضويات

Indian Institute of Chemical Engineers
  • Life Member
  • April 1996