suresh krishnamoorthy, Sr.Project Engineer - Electrical

suresh krishnamoorthy

Sr.Project Engineer - Electrical

kharafinational

Location
Kuwait
Education
Bachelor's degree, Electrical machines
Experience
25 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 9 Months

Sr.Project Engineer - Electrical at kharafinational
  • Kuwait
  • My current job since December 2008

1.To Plan and execute Preventive and Corrective maintenance for 55 MW LV/MV Electrical load connected waste water treatment plant equipment's including 11 KV Ring Sub-Stations.
2. Serving as Leader POET (Planning, Operation, Engineering and
Technical) team and overseeing Heavy Machinery.
3. Preparing technical and Cost proposals for new installation and Modification works.
4. More consternation on Condition monitoring and failure analysis reports of equipment's.
5. Spare parts arrangements, absolute spares analysis and necessary steps to get equipment latest alternation.
6. Working as a acting Instrument engineer as required by project.
7. Providing Technical training to down stream employees as required.
8. Energy conservation, Cost control study and implementations as required.
9. Quality and Safety procedures review and updating.
10.Liaison with Client in order to assure that all technical/engineering requirements are met.
11. PLC, HMI, Scada maintenance and trouble shouting..
12. Handling Emergency, Shut down and Plant start up works as required.
13.Drawing updating and Engineering dept. follow-up.
14.Electrical Installation, testing and Commissioning of STP and Water pumping stations in MOD project.

Dy.Manager Electrical at Karur KCP Packkagings Ltd
  • India
  • September 2005 to November 2008

1.To execute Preventive and Corrective maintenance for 15 MW Load connected plant including 22 KV out door sub-station.
2.Trouble shouting works as required and failure analysis.
3.Spare Sprats arrangements.
4.Technical and Cost proposal preparation.
5. Energy Conservation study.
6. Action plans towards improving lifetime of the Equipment's.
7. Modification and new installation works as required.
8. Man power utilization and cost Control.

Electrical Engineer at KARUR KCP PACKKAGINGS LTD,Pondicherry,India
  • India
  • August 1998 to August 2005

1.To execute Regular maintenance and Trouble shooting of 8.5 MW electrical load connected 75 ton per / paper industry.
2.Energy Conservation study.
3. Action plans towards improving the equipment's healthiness.
4. Man Power utilization.
5. Trouble shouting works as required.
6. Materials request and procurement follow-up.
7. Equipment's history sheet maintenance.

Education

Bachelor's degree, Electrical machines
  • at Annamalai university
  • June 1995

Specialties & Skills

Testing
Troubleshooting
Installation
Maintenance
Power Distribution
Electrical Project Engineer
Electrical Maintenance
LV and MV equipments, switchgears
VFD's, Soft starters,MOV's,UPS's,Etc
Trouble shooting
Power distribution
Cost proposals
Sub-Stations maintenance up to 33 KV
Equipments size calculations
Transformers,Motors and Protection system and relays
PLC / HMI /Scada
Installation testing and Commissioning

Languages

English
Expert
Tamil
Expert

Training and Certifications

(Certificate)
Date Attended:
November 2014
Foundation Course on PCS (Certificate)
Date Attended:
January 2010
Valid Until:
January 2010
PLC Programming and Applications (Certificate)
Date Attended:
January 2008
Valid Until:
February 2008
Auto Cadd 2007 Electrical (Certificate)
Date Attended:
June 2008
Valid Until:
September 2008
Siemens PLC and WinCC Programming (Certificate)
Date Attended:
February 2012
Valid Until:
February 2012

Hobbies

  • Playing cricket
  • Watching football and Cricket